ML20028E004

From kanterella
Jump to navigation Jump to search
Forwards LER 82-136/99L-0
ML20028E004
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 01/14/1983
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20028E005 List:
References
AECM-83-030, AECM-83-30, NUDOCS 8301200235
Download: ML20028E004 (1)


Text

_ _ _ _ _ _ - _ _ . ___

O e.

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi N P. O . B OX 164 0. J AC K S O N. MIS SIS SIP PI 3 9 20 5 January 14, 1983 JAMES P. McGAUGHY, JR.

b ASSIST ANT VICE PRESIDENT Q -

Office of Inspection & Enforcement C,

'~

U. S. Nuclear Regulatory Commission -

Region II *p 101 Marietta St., N.W., Suite 3100 'J' Atlanta, Georgia 30303 -

ro Attention: Mr. J. P. O'Reilly, Regional Administrator r

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Uuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Quality Assurance Audit Reveals that the Temperature in the Division I Switchgear Room Exceeded T.S. Limits on September 27, 1982 LER 82-136/99 L-0 AECM-83/030 A December 15, 1982 Quality Assurance Audit revealed that the temperature in the Division I Switchgear Room had exceeded Technical Specification 4.7.8 limit of 104*F. The daily logs document a temperature of 105*F on September 27, 1982. Operations failed to identify this as a reportable event. Attached is LER 82-136/99 L-0.

Yours truly,

%?d I) eb })l*Y?

JPM: sap Attachment

[ j 'l-f cc: Mr. N. L. Stampley (w/a)

Mr. R. B. McGehee (w/o) j Mr. T. B. Conner (w/o) , l Mr. G. B. Taylor (w/o) '

Mr. Richard C. DeYoung Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 opp Document Control Desk (w/a) I'P U. S. Nuclear Regulatory Commission Washington, D. C. 20555 I , b D DO O 6 lber Middle South Utilities System S PDR