05000416/LER-1982-154-03, /03L-0:on 821204,shutdown Cooling Loop a of RHR Secured for Standby Svc Water Loop a Hydrostatic Test.Caused by Need to Perform Hydrostatic Test.Reactor Water Cleanup Used as Alternate DHR Method

From kanterella
(Redirected from ML20028C242)
Jump to navigation Jump to search
/03L-0:on 821204,shutdown Cooling Loop a of RHR Secured for Standby Svc Water Loop a Hydrostatic Test.Caused by Need to Perform Hydrostatic Test.Reactor Water Cleanup Used as Alternate DHR Method
ML20028C242
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/31/1982
From: Rohrer M
MISSISSIPPI POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20028C233 List:
References
LER-82-154-03L, LER-82-154-3L, NUDOCS 8301070245
Download: ML20028C242 (1)


LER-1982-154, /03L-0:on 821204,shutdown Cooling Loop a of RHR Secured for Standby Svc Water Loop a Hydrostatic Test.Caused by Need to Perform Hydrostatic Test.Reactor Water Cleanup Used as Alternate DHR Method
Event date:
Report date:
4161982154R03 - NRC Website

text

NRC FOR M6 U. S. NUCLE AR REGULATC RY COMMISSION LICENSEE EVENT REPORT Attachmsnt to AECM-82/643 CONTMM BLOCK: l l

l l

l l

lh Page 1 of 1 it (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

l M l [l G l Gj S l,1_j@150' l 0 l - l 0 l 0 l 0 l 0 l 0 l-l 0 l 0 l@l 4 l 1 l 1 l 1 l 1 l@l l

l@

0 1 9

LICEN3EE CODE 14 LICENSE NUMBER 25 26 LICENSE TYPE JO 57 CAT 58 7

8 CON'T

_loly] '- ((0"] Ql 0 l 5 l 0 l 0 l 0 l 4 l 1 l 6 @l 1 l 2 l 0 l 4 l 8 l 2 @l 1 l 2 l 3 l 1 l 8 l 2 l@

g 7s 8

60 G1 DOCK ET NUVSE R 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT CESCRIPTION AND PROBABLE CONSEQUENCES h s

o 2 l~On;Decembe'r 4, 1982, with the reactor in cold shutdown. Shutdown Cooling (SDC) loop A l 1 o l a I,[ of the Residual Heat Removal System (RHR) was secured for a Standby Service Water l

l o l4 l l (SSW) loop A hydrostatic test.

SDC loop B was in operation. An LCO was entered in l

[ o i s l l accordance with T.S.3.4.9.2, and the event is reported pursuant to T.S.6.9.1.13.b.

l l o lc l l The event had no ef fect on the plant or public health and safety. This is a final l

l c l 7 l l report.

l 10181I I

DE OE ~

$ BC E

. COMPONENT _ CODE SU8 CODE S

E lo19l l Cl Fl@ W@ W@ l Zl Zl Zl Zl Zl Zl@ y@ W @

7 8

9 10 11 12.

13 18 19 20 SEQUE NTI AL OCCUR RE NCE REPORT REVISION

,_E 4'

REPOf tT NO.

CODE TYPE N O.

l VENT YE AR

[]

[1 l5 l4 l y

l 0l 3l

]

g

]

LE hcHO

@ geg 8 l2 l

_ 21 22 23 _

24 2b 27 N

M 30 31 32 AKF A

ON L NT MET ts HOURS SB IT FO 8.

SUPPLIE MANUF CTURER LL@l Z I@

LZ_1@

l ' ZI@

l 01 01 01 01 INl@

l_.N_j@

lZ l@

lZl9l9l9l@

i JJ 34 36 3 36 3/

40 41 42 43 44 47 CAUSE DESCOiPTION AND CORRECTIVE ACTIONS h

~

gg l SDC loop A vas shutdown in order to perform the SSW hydrostatic test.

In the interim l g t.g i j ll Reactor Water Cleanup (RWCU) was used as the method of alternate decay heat r moval ini

  • ;,i77 Qccordance with T.S.3.4.9.2.

The LCO was lifted, and the RHR A was returned to SDC l

\\

J g,;3 Qmode on December 29, 1982 -

l 1 1411 I

7 8 9 80 ST 3

% POWER oTdER STATUS DISCOV HY DISCOVERY DESCRIPTION F R !_ G l @ [0 l 0 l 0 l @ Q '

NA l

] Ql Testing Activity l

" A ilVITY C TENT

'\\

RE WASED OF RE LEASE _

AVObNT OF ACTIVITY LOCATION OF RELE ASE NA l

l NA l

yr;j Qj@ [7fj@l 7

8 J 10 11 44 45 80

>-If40SNEL EXPostmES

/

s Of bC AWTION 39 P.VV6 f ik d (Tri

- Lo1 o I of l]@{ - ^

NA l

UERSONNEL!'u RIES nEsCn.eTiON@

. m.m n s

- HA l

l i l a l l 0 l 0 l 0 l@l i 80 8301070245 821231 OSkEh OR D JAGE TO FArtL;TY / 3s Tm DEsCneT ON V

PDR ADOCK 05000416 4

[TTol W @l s-Poe i

c 7

J4 *9

' 10,

80 oI CitlPTION

'[1o].ssuff@l l

lllIlllllIIll1 [p.

NA i

,G in 68 69 80 5 7

NAME O[ PFtEPARER Oricinal siened by Mnt t how VJ RnhreIPHONE:

7 n

J