05000416/LER-1982-154, Forwards LER 82-154/03L-0

From kanterella
(Redirected from ML20028C232)
Jump to navigation Jump to search
Forwards LER 82-154/03L-0
ML20028C232
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/31/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20028C233 List:
References
AECM-82-643, NUDOCS 8301070231
Download: ML20028C232 (1)


LER-1982-154, Forwards LER 82-154/03L-0
Event date:
Report date:
4161982154R00 - NRC Website

text

p, e,

y MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B OX 164 0, J AC K S O N, MIS SIS SIP PI 3 9 2 05 December 31, 1982 JAMES P. McGAUGHY. JR.

AbSiSTANT VICE PRE 5tOENT Office of Inspection & Enforcement d

U. S. Nuclear Regulatory Commission Region II

]

- f 101 Marietta St., N.W., Suite 3100 Atlanta, Georgia 30303 o

P Attention:

Mr. J. P. O'Reilly, Regional Administrator g

Dear Mr. O'Reilly:

os l

C l

SUBJECT: Grand Gulf Nuclear Station e

l Unit 1 Docket No. 50-416 i

License No. NPT-13 File 0260/L-835.0 Inoperable Shutdown Cooling Loop LER 82-154/03 L-0 AECM-82/643 l

On December 4, 1982, with the reactor in cold shutdown, Shutdown Cooling l

(SDC) loop A of the Residual Heat Removal System was declared inoperable in I

order to perform a hydrostatic test of Standby Service Water loop A.

This event is reported in accordance with Technical Specifications 3.4.9.2 and

6. 9.1.13.b. Attached is LER 82-154/03 L-0.

et.<k

/ c) tS. D S /h c h-*/~/d JG T

l JPM: sap Attachment cc:

Mr. N. L. Stampley (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a) i Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 i

Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8301070231 821231

  1. ' N.1 AL CGPY.

PDR ADOCK 05000416

\\

[g k:L Member Middle South Utilities System