Responds to Gossick Request to Reply to Inquiry Re Adequacy of Qa/Qc Program.Licensee Continuing to Look for Addl Voids & Is Evaluating Possible Alternate Designs for Reinforcing Steel & Liner Stiffeners
ML20023C823
Person / Time
Site: 05000000, South Texas
Issue date: 07/31/1979
From: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Kennedy R
NRC COMMISSION (OCM)
Shared Package
ML20023A411 List:
References
FOIA-82-603 NUDOCS 8305180064
Download: ML20023C823 (3)


Text

.

1 I li2,- L

gt_ 31 1979

~

MEM3RANDUM FOR:

Commissioner Kennedy ORIGINAL SIGNED SY R. G. SMITH THRU:

Executive Directer for Operations /~#

FROM:

Victor Stello, Jr., Director, Office of Inspection and Enforcement.

a.

SUBJECT:

PHO-79-179, " VOIDS IN REACTOR CONTAINMENT WALL (SOUTH

~

TEXAS PROJECT UNIT NO. 1)"

Mr. Gossick has asked me to reply to your inquiry about the adequacy of the QA/QC program for the South Texas Project.

As a part of the regular IE inspection program, a detailed and rigorous inspection of each licensee's construction QA program is conducted at about the 50 percent construction cocpletion point.

For the South Texas project we had already decided to advance the tiraing of this inspection, and it will be performed in the near f uture.

An upper level ' management meeting is normally conducted at the cen-clusion of each such inspection.

- The licensee on June 22, 1979 suspended further placement of safety-related

' concrete until a thorough review could be made of procedures for control of manufacture and placement of concrete.

The voids identified to date-are relatively small and are in locations where there is a high concentration of reinforcing steel.

Placement difficulty is further compounded by horizontal j

stiffeners instal. led for handling and erecting the liner plate.

. m

!h Placement of safety related concrete has been resumed except for containment building - walls.

The licensee continues to look for additional voids, and-is evaluating possible alternate designs for reinforcing steel and the liner

'h.,_s.tiffeners, to facilitate concrete placement.

3 j

s.,

CONTACT:

J. B. Henderson, IE 49-27551

.(

\\

8305180064 830309

/O A

PDR FOIA V

LINDEMA82-603 PDR

1

~,.

1 Cor.?.issioner Kennedy -l i

We will keep you informed as new information is ca' tained.

Sincerely,

  1. LY

% \\7v\\

Victor Stelio J r.

Director Office cf Insoection rd Erfer:ir.t.t cc:

Chai r..an Hendrie Commissioner Gilinsky Commissioner Bradford ~

ag Commissioner Ahearne

H. Denton, NRR w

OPE OGC OPA OCA SECY

i:t-ibutica:

L.

Y.

Gossick, EDO E. K. Cornell, EDO T-Rehm, EDO

. V. Stello, IE D. Thompson, IE J. B. Henderson,. IE G. W.

Reinmuth, IE H. D. Thornburg, IE PE G. Ertter (ED0-6667)

L. N. Undervood, IE (H11-1926-H06)

~

IE Files Central Files IE Reading i

EDO Reading I

I c

s SEE PREVIOUSL YELLOW FOR CONCURRENCES S

l WPU:SD/SM Office RCI):E A/D-IEf A/DD:IE

.Ji EDO Job C Surname JBHhr derson GW e

' utri DThompson YStello 7/24/79 Date 7/; y*

7^

, 7 9',

7/fd/79 7/24/79 7/ /79

/-

l

( b, p<

l O' is

!\\

~

L" s-m,m--

r MEMORANDUM FOR:

Commissioner Kennedy Executive Director for Operations %I{NAL SIGNED BY R.G.S!.*lTH THRU:

FROM:

Victor Stello, Jr., Director, Office of Inspection and Enforcement

SUBJECT:

PNO-79-179, " VOIDS I.'; REACTOR CONTAINMENT WALL (SOUTH TEXA5 PROJECT UNIT ti0.1)

Mr. Gossick has asked me to reply to your inquiry about the adequacy of the

c QA/QC program for the South Texas Project.

IE is planning to conduct a detailed and rigorous inspection of the QA program.

This will be done in y

the near future, and represents early performance of a regularly scheduled mid-term. inspection.

An upper level management meeting at the conclusion of this type of inspection is normally performed and will be conducted as you suggest.

The licensee on-June 22, 1979 suspended further placement of safety related concrete until a thorough review could be made of procedures for control of manufacture and placement of concrete.

The voids identified to date are reiativeiy small and are in locations where there is a high, concentration of reinforcing steel.

Placement difficulty is further compounded by horizontal stiffeners installed for handling and erecting the liner plate.

Placement-of safety related concrete has been resumed except for containment building walls.

The licensee continues to look for additional voids, and is evaluatinc possible alternate designs for reinforcing steel and the liner stiffeners, to facilitate concrete placement.

We will keep you informed as ~new information is obtained.

- A l

c Sincerely, i

l Victor Stello, Jr.

Director Office of Inspection i

and Enforcement

/

e-(ce:

See next page)

I/Ijd:...

i-WPU:SD Office RCI{IE A/D:RCI:IE ADD:IE D:IE EDO G

Job C Surname JBHinderson GWReinmuth DThompson VStello 7//f79 7///79 7/ /79 7/ /79 7/ /75 7/19/79 Date g

e j)

L.,. - -

._,._m

--e-

-