LER 81-033/03L-0:on 810604,during Testing,Calibr Zero Gas Ran Out.Caused by Procedural Deficiency.Mod Added to Procedures
ML20009B088
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/02/1981
From: Isley T
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20009B086 List:
References
LER-81-033-03L, LER-81-33-3L, NUDOCS 8107140761
Download: ML20009B088 (2)


Text

D. S. f.UCL L t.fi liL GUL AI OdV C0'. .ut JN

"_ . q.u s

'*$

  • LICENSEE EVENT REPORT (PLE ate PRINT OR TYPE ALL REOutRED JNFORMATIONI
  • cu4 *"" 'J L OC K: l I

l l l l l lh D

IM 8l Ol IA D l B l S l 1 l@l 01 O! -l elLectNSE IP IF I IO l 3 l@l 4ILsCENSE elN NuveEM 23 26 il 1l 1l Tyre1l@l Jo l

67 CAT 68 l@

LfCENSEE CODE to 16 9

00'.'T

[ o_l.i j  %,% @l 0 l 5 l 01010 l 31416 l@l b90 l 6EVENT 5 td l0 l4 l 8 l1 j@l75of 710l CATE J4 REPORT 21C AT E 81 1l@ 80 .

7 8 60 61 OOCK ET NUYBER EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h o 2 l(NP 33-81-41) On June 4, 1981 at 1425 hours0.0165 days <br />0.396 hours <br />0.00236 weeks <br />5.422125e-4 months <br />, during Containment Hydrogen Analyzer Testf Since there was no additional gag g lST 5065.01 on AT 5027, calibration zero gas ran out.

analyzijr lo l4 j lon site, and the calibration had progressed to the point where accuracy of the the action stacq-a 3 lhad been affected, it was declared inoperable and the station entered There was no danger to the health and safety l 0 6 l ment of Technical Specification 3.6.4.1.

jof the public or station pert. n el .' Hydrogen analyzer AT 5028 was operable during l o 2

- l 80 FiTTT1 I this time.

COMPONENT CODE Sv8 CODE S E OE CODE SL8C E Q l Sl El@ dh (_Zj @ l I l N l S l T l R l U l@ W @ y @

f3 18 19 20 9 10 11 12 REVISION 7 8 SE QUE NTI AL OCCURRENCE REFORT

,_ CODE TYPE NO.

EVENT YE AR REPORT NO.

LER O ,ayg'RO I 8l 11 l-J l 013131 LcJ 10131 lA_J 30 l--J 3t

[fj 32 24 26 27 28 29

. _ 21 22 23 S 8 iT C FOR' B. SU PLIE MANUFAC HER HOURS 7 KN A N ON PL NT E e4 y@ l 0l0l0l0l W@ lNlg {43g] g lz .p l9 l9l g

[.Gj@l._Zj@

JJ J4 lZl@

3b 36 37 40 41 42 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h There was no guidance in l g IThe cause of the occurrence was a procedural deficiency.

to insure there was an adequate supply of zero calibration gas to coc- l li li j l the procedure On A codification, T5581 added a note to procedure ST 5065.01. g lplete the test.

additional zero gas was received, and the test was completed. ,

l June 20, 1981, I

j 1 4 l 80 7 8 9 IS O RY DISCOVERY DESCRIPTION

% POWER OTHER STATUS

$ A US ST 5065.01 l l [B_j@l

  • l g ] '@

' l_4 TENT JnviTY CO

' 0l 7"l 3l@l NA

+ LOCATION OF RELEASE RELE ASEO OF RELE ASE AVOUNT OF ACTivlTY l NA

@ (_2]@ [Zj@l '

NA l l

' ' ,ERSONNEL Ex,OSuAES

~u BER Tv,E DESCRi.nO~@ l t 7 \0l0l0l@ y @l NA *

' ' ERSONd'iN,unS NuoBER DESCRienO~@ l t a 8 9 l 0l 0l0]@] 11 12 NA 80 7

t L M OF oR CAVAGE TO FACILITY l . OESCRIPTION l 1 9 k '

NA e107140761 810702 NRC USE ONLY

,u, v l ,ieTioN @ PDR ADOCK 05000346 lllllll;llllly NA S PDR l

, Q issue @L _ 68 69 80 *i;

% (419) 259-5000. Ext. 230 g 7 8 9 to

'N

9 % g he .

. D

. e TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION33-81-41 UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-DATE OF EVENT:

June 4, 1981 FACILITY _: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: Containment H2 Analyzer, AT 5027, Inoperable.

The unit was in Mode 1, with Power (MWT) = 2024 Conditions Prior to Occurrence:

cnd Load (Gross MWE) = 669.

Description of occurrence: On June 4,1981 at 1425 hours0.0165 days <br />0.396 hours <br />0.00236 weeks <br />5.422125e-4 months <br />, during the performance of the Containment Vessel Atmosphere H2 Analyzer Calibration Test ST 5065.01, on The calibration had progressed to the AT 5027, the calibration zero gas ran out. Since there was no gas available on The point where the accuracy had been affected. site and the test could not be comp station entered the action statement of Technical Specification 3.6.4.1., which rzquires the analyzer to be restored to operable status within 30 days or be in at least Hot Standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

D:signation of Apparent Cause of occurrence: The cause of the occurrence was starting the test without having sufficient zero gas to complete the calibration.

The reason for not having sufficient gas was that there was no guidance in the tzst procedure to insure there was an adequate supply of zero calibration gas to complete the test.

Analysis of Occurrence: There was no danger to the health and safety of the public or to unit personnel. Containment H 2Analyzer AT 5028 was operable during this

  • time.

Corrective Action: On June 20, 1981, additional zero gas 5065.01. Thewas obtained analyzer was and the declared calibration of AT 5027 was completed per ST operable and the station recoved from the action statement of Technical Specifi-Under Temporary Procedure Modification T-5581, a note was aaded cation 3.6.4.1. to check the gas pressure and submit a work request when it to Procedure ST 5065.01 is found to be below 200 psig. This will ensure an adequate supply is always avail-cbic.

Failure Data: There has been no previous report of a similar failure due,to procedural deficiency.

LER #81-033 .