05000325/LER-1981-015-03, /03L-0:on 810127,rod Block Monitor B Failed to Initiate RTGB Downscale Alarm & Rod Out Block at Downscale Alarm Setpoint.Caused by Mechanically Stuck Contacts in Control Relay K-2 in Cabinet Circuitry.Relay Replaced

From kanterella
(Redirected from ML19341C562)
Jump to navigation Jump to search
/03L-0:on 810127,rod Block Monitor B Failed to Initiate RTGB Downscale Alarm & Rod Out Block at Downscale Alarm Setpoint.Caused by Mechanically Stuck Contacts in Control Relay K-2 in Cabinet Circuitry.Relay Replaced
ML19341C562
Person / Time
Site: Brunswick 
Issue date: 02/24/1981
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19341C558 List:
References
LER-81-015-03L, LER-81-15-3L, NUDOCS 8103030748
Download: ML19341C562 (1)


LER-1981-015, /03L-0:on 810127,rod Block Monitor B Failed to Initiate RTGB Downscale Alarm & Rod Out Block at Downscale Alarm Setpoint.Caused by Mechanically Stuck Contacts in Control Relay K-2 in Cabinet Circuitry.Relay Replaced
Event date:
Report date:
3251981015R03 - NRC Website

text

.

(7 TF)

LICENSEE EVENT REPORT r

CONTROL 8 LOCK:

l l

l l

l h

(PLEASE PRINT C3 TYPE ALL CEEUIIE3 INFORMATl!N1 l N l"C l B l E lP ! 1l@is 0 l 0 l -l 0 l 0] 0 l 0 l 0 l -l 0 l 0

'@[ 4 l 1 l 1 l 1l 1l@lsi CAT se @

l l

e uCEmssE CooE 14 uCENst NuvesR 20 2a uCENsE Tves 40 s

CON'T "TRU LtJ@l of si ol -l of 3121 sl@l o I il 2 I 718111@l 0 i 21214 i s 11 l@

%8 40 61 DOCKET NUMgER WI 69 EVENT DATE

?4 7S REPORT oaf t 80 S

EVENT DESCRIPTION AND PROS A8LE CONSEQUtNCES hcontrol rod withdrawal block l

E l During the performance of Rod Block Monitor (RBM) 0 3 l channel and functional test, PT-1.5T::, RBM "B" failed to initiate an RTGB RBM down-l ITTTl I scale alarm and a rod out block at the downscale alarm seepoint, thereby making the l

IoIs! I monitor inoperable. RBM "A" was determined operable according to the PT.

This event]

I'5Tl I did not affect the health or safety of the public.

l l

10171 l Technical Specification 3.1.4.3; 6.4.1.9b.

l gi 1

QE CO E SueC E COMPONENT CODE SLOC CE SU Q

lR l B j@ dh l F l@ l R I E l L l A l Y l X l@ l B l@ y @

7 8

9 10 ft 12 IJ te id 20 SEOVENTI A L OCCURRENCE REPORT REvislON LER Ro EVENTYEAR REPORT NO.

COOE TYPE No.

@,a,E g is l 1l l_i 101 t ; si Ld 10131 l' l 1-1 lol

,,,,. 21 22 23 24 26 27 28 23 30 31 32 TK N AC ON O P NT ME hours S8 i POR S.

SUP*Li MANUPAC RER Lcjgl34Zl@

l Zl@

l Zl@

l o f 0101 ol I Ni@

lyl@

lNl@ lclolslol@

33 35 36 33 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS

[ ;-[7] l Mechanically stuck contacts in control relay, K-2, located in the RBM "B" control l

gl cabinet circuitry, prevented the required functions to occur. The relay was I

,, g replaced and RBM "B" was determined operable according to the PT.

This type relay I

g; is widely utilized throughout the reactor protection instru=entation system and has ]

EI no previous histerv cf failurec. Therefore. this is considered an i=olstad evene.

I 80 7

8 9

'S T US

% POWER OTHER STATUS 15 O RV OISCOVERY DESCRIPTION NA l

lBl@l Periodic Test l

g g@ l 0 l 6 l 6 l@l ACTivtTY CO TENT MELEASED OPRELEASE AMOUNT OF ACTIVITY LOCATION 08 RELEASE l1l6l lZ l@ l Zl l

NA l

l NA l

PERSONNEL EXPOSURES cESCRiPriON h NuenER Tvet NA l

y l 0 l 0 l 0 l@l Z l@[

80 13 PtRSONNE L iN2VR'iES oESCRiPTiON@

NuveER l 0 l 0 l 0 l@l NA l

i a 80 7

8 9 11 12 LOSS OF OR DAu nOE TO PActLITY Q TYPE DESiRIPTtON

%,/

NA l

Q l Z l@l 80 7

8 9 10 E

DE CRIPTION IS!St _ Jet NA l

lllllllllI,yj{

2 o 68 69 80 3.

7 8 3 10 M. J, PASTVA. JR.

PHONE: 414-697-4971 E

N'.

NAME OF PREPARER 8103 o go 7tn

~