Ack Receipt of 801231 Response to TMI Action Plan Item II.K.3.3, Reporting Relief Valve & Safety Valve Failures & Challenges. No Further Review Planned.Item Resolved
ML20049J167
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 03/08/1982
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
References
TASK-2.K.3.03, TASK-TM LSO5-82-03-050, LSO5-82-3-50, TAC-45357, TAC-49741, NUDOCS 8203120204
Download: ML20049J167 (3)


Text

.

..+ r p-DISTRIBUTI0tl Docket March 8, 1982' NRC PDR Local PDR ORB Reading g

NSIC 4

DCrutchfield Docket flo. 50-213/245/336 HSmith RECEIVED U

CTF Pf LS05-82-03-050 JShea MAR 111982> Z MConner C#

au m massammes T OELD

'"' a"m:"" "

OI&E q

f ACRS (10)

!!r. it. G. Counsil, Vice President TColburn fluclear Engineering and Operations ci ro SEPB Connecticut Yankee Ato tic Power Company

& !!artbeast !!uclear Energy Conpany Post Office Box 270 Hartford, Connecticut 06101

Dear !!r. Counsil:

SUPJECT: TMI ACTION PLAll ITEM II.K.3.3, REPOP. TING RELIEF VALVE A'fD SAFETY VitLVE FAILURES AMD CHALLEMGES PE:

Haddan Neck Plant; !!illstone Nuclear Power Station Units No. I and 2 Ue have revirmed your responses dated Decenber 31, 1980- to the above THI Action Plan iten. You have comitted to neeting the reporting requirements provided in our previous quidance including a report en relief valve (RV) and safety valve (SV) failures ad challanqes for the period April 1,1980 through December 31, 1900 and future reporting of RV and SV failures and challenges. No further review of this iten by HRR is planned. Because you have conmnitted to neeting the above reporting requirenents, we consider this item resolved for your facilities.

However, we wish to fornalize these reporting requirements; therefore, we will contact you in the future requesting that you administratively incor-porate the reporting requirenents in your Technical Specifications.

Sincerely, 1

Original signed by Dennis 11. Crutchfield, Chief Operating Reactors Branch #5 1

Division of Licensing p/

cc: See next page S'f0 94 M ast $ "h

  • SEE PREVIOUS TISSUE FOR CONCURRENCE omcc>. DL:,0RB,#5*

DL:, OR,8,j5,*

DL:,,,0RB_ #3,,,5 DL,;

7 su m uc> I.Tr.opf.;cc...

..).S.h.eA.,....MConner.....

.d

- 4 k-e2O312o2oa e2osoo

<$pDR ADOCK 05000 OFFICIAL RECORD COPY two; mmu

7 l

E 11:

DISTRIBUTION Docket NRC PDR Local PDR ORB Reading Docket !!o. 50-213/245/33r> -

N D utchfield HSmith CTropf JShea MConner OELD Mr. W. G. Counsil, Vice President 01&E Nuclear Engineering and Operations ACRS (10)

Connecticut Yankee Atomic Power Company TColburn

& Hortheast Nuclear Energy Company SEPB Post Office Eox 270 Hartford, Connecticut 06101

Dear !!r. Counsil:

SUBJECT:

Ttil ACTION PLAtl ITEH II.K.3.3, REPORTIllG RELIEF VALVE AMD SAFETY VALVE FAILURES AllD CHALLENGES l

RE:

Haddara fleck Plant; Millstone Station Units 1 and 2 f

We have reviewed your responses dated December 31, 1980 to the above TMI Action Plan item. You have connitted to neeting the reporting requirenents i

provided in our previous guidance including a report on relief _ valve -(RV) and safety valve (SV) failures and cha11anges for the period April 1,1980 through Decenber 31, 1980 and future reporting of RV and SV failures and challenges. No further review of this iten by HRR is planned.

Because you have committed to meeting the above reporting requirements, we consider this item resolved for your facilities.

l However, we wish to fornalize these reporting requirements; therefore, we will contact you in the future requesting that you administrative 1y incor-porate.the reporting requirt-tents in our Technical Specifications.

Sincerely, t

Dennis !!. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing cc:

See next page i

omce>.DL A. 0RB...Mi..

, DL.:,,.0RB,

,. I,,

DL ORB # 5 D

CTropf:cc JShea '

DCrutchfield sun m e,...... ~..g.

om> a.:2.g........J..E Lk..3/6[.KA.

NAC FORM 316 00-eq NRCM Om OFFICIAL RECORD COPY usam m n+o

4 e

O Mr. W. G. Counsil

- 2. -

March 8, 1982 a

cc William H. Cuddy, Esquire State of Connecticut Day, Berry & Howard Office of Policy Management Counselors at Law ATN: Under Secretary Energy One Constitution Plaza Division Hartford, Connecticut 06103 80 Washington Street Hartford, Connecticut 06115 Board of Selectmen Town Hall Resident Inspector Haddam, Connecticut 06103 Haddam Neck Nuclear Power Station c/o U. S. NRC Northeast Nuclear Energy Company East Haddam Post Office ATTN:

Superintendent East Haddam, Connecticut 06423 Millstone Plant P. O. Box 128 U. S. Environmental Protection Waterfor'd, Connecticut 06385 Agency Region I Office Natural Resources Defense Council ATTN:

Regional Radiation Representative 917 15th Street, N. W.

JFK Federal Building Washington, D. C.

20005 Boston, Massachusetts 02203 Resident Inspector c/o U. S. NRC Superintendent P. O. Box Drawer KK Haddam Neck Plant Niantic, Connecticut 06357 RFD #1 Post Office Box 127E Waterford Public Library East Hampton, Connecticut 06424 Rope Ferry Road, Route 156 Waterford, Connecticut 06385 Ronald C. Haynes, Regional Acministr~ tor Nuclear Regulatory Commission, Regica I First Selectman of the Town Office of Inspection and Enforcement of Waterford 631 Park Avenue Hall of Records King of Prussia, Pennsylvania 19406 200 Boston Post Road Waterford, Connecticut 06385 John F. Opeka Systems Superintendent Northeast Utilities Service Company P. O. Box 270 Hartford, Co'nnecticut 06101 Mr. Richard T. Laudenat Manager, Generation Facilities Licensing Northeast Utilities Service Company P. O. Box 270 Hartford, Connecticut 06101

.