Other: A00938, Forwards Haddam Neck Plant Reactor Operator Qualification & Requalification Programs & Millstone,Units 1 & 2,reactor Operator Qualification Program, A01024, Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted, B10111, Forwards Implementation Status of TMI Action Plan.Items Which Cannot Be Implemented by 810101 Identified, ML19340E921, ML19344E073, ML19344E075, ML19344E083, ML19345E125, ML20010A692, ML20028E427, ML20031H149, ML20033D230, ML20041B060, ML20041B062, ML20041B064, ML20041B066, ML20041B069, ML20041B070, ML20054E184, ML20077B854, ML20214K567
|
MONTHYEARA01024, Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted1980-06-10010 June 1980 Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted Project stage: Other ML20041B0661980-07-22022 July 1980 Instructor Requalification Project stage: Other ML20041B0621980-07-23023 July 1980 To Licensed Senior Reactor Operator Replacement Training Project stage: Other ML20041B0641980-07-23023 July 1980 To CT Yankee Reactor Operator Requalification Project stage: Other ML20041B0601980-07-23023 July 1980 To Licensed Reactor Operator Replacement Training Project stage: Other ML19344E0751980-07-31031 July 1980 Operator Requalification Program Project stage: Other A00938, Forwards Haddam Neck Plant Reactor Operator Qualification & Requalification Programs & Millstone,Units 1 & 2,reactor Operator Qualification Program1980-08-15015 August 1980 Forwards Haddam Neck Plant Reactor Operator Qualification & Requalification Programs & Millstone,Units 1 & 2,reactor Operator Qualification Program Project stage: Other ML19344E0731980-08-31031 August 1980 Qualification of Reactor Operators Project stage: Other ML19344E0831980-08-31031 August 1980 Qualification of Reactor Operators Project stage: Other ML20041B0701980-08-31031 August 1980 Requalification Program for Licensed Operators Project stage: Other ML20041B0691980-08-31031 August 1980 Operator License Program Project stage: Other B10111, Forwards Implementation Status of TMI Action Plan.Items Which Cannot Be Implemented by 810101 Identified1980-10-31031 October 1980 Forwards Implementation Status of TMI Action Plan.Items Which Cannot Be Implemented by 810101 Identified Project stage: Other ML19345E1251980-12-15015 December 1980 Forwards Response to NUREG-0737 Re Implementation Status of TMI-related Requirements Project stage: Other ML19340E9211980-12-31031 December 1980 Forwards Rept on post-TMI Requirements in Response to NUREG-0737 & NRC Project stage: Other ML20010A6921981-08-0606 August 1981 Advises of Intended Licensing Exam Requests for Facilities for 1982.Advance Notice for NRC Support Considered Necessary Due to Limited Simulator Availability to Meet New Regulations Project stage: Other A01845, Forwards Info Re NRC Orders Confirming Licensee Commitments on post-TMI Related Issues.Issues Have Been Addressed.If NRC Does Not Allow Util to Reserve Request for Hearing,Ltr Should Be Treated as Hearing Request1981-08-10010 August 1981 Forwards Info Re NRC Orders Confirming Licensee Commitments on post-TMI Related Issues.Issues Have Been Addressed.If NRC Does Not Allow Util to Reserve Request for Hearing,Ltr Should Be Treated as Hearing Request Project stage: Request ML20031H1491981-10-20020 October 1981 Advises That Cable Supplied for Requirements of NUREG-0737 Item II.F.1.3, Containment High-Range Radiation Monitor, Is Not Fully Environmentally Qualified.Cable Will Be Replaced During Next Outage Project stage: Other ML20033D2301981-11-30030 November 1981 Notifies That Stack Monitoring Sys Will Be Modified to Accomodate Installation of High Range Noble Gas Effluent Monitor Per Item II.F.1 NUREG-0737 Requirement.Compliance W/Tech Specs During Installation Will Be Maintained Project stage: Other ML20054E1841982-04-16016 April 1982 Forwards Responses to Generic Ltr 82-05 Re post-TMI Requirements Implementation.Continued Safe Operation Assured W/Existing Implementation Status Project stage: Other A02376, Responds to 820318 Request for Addl Info Required to Complete Review of NUREG-0737,Item I.A.1.2 Re Upgraded Senior Reactor Operator & Reactor Operator Training & Item II.B.4 Re Training for Mitigating Core Damage1982-05-10010 May 1982 Responds to 820318 Request for Addl Info Required to Complete Review of NUREG-0737,Item I.A.1.2 Re Upgraded Senior Reactor Operator & Reactor Operator Training & Item II.B.4 Re Training for Mitigating Core Damage Project stage: Request ML20028E4271982-08-17017 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items,I.A.2.1 & II.B.4, Technical Evaluation Rept Project stage: Other ML20214K5671983-04-19019 April 1983 Advises That Reporting Period Began on 800401 for All PWR Licensees Committed to Providing NRC Prompt Notification of Porv/Sv Failures & Periodic Repts.Project Managers Should Have Info Available in Records Project stage: Other ML20077B8541983-07-20020 July 1983 Operating Reactor PORV Repts (F-37) TMI Action Plan Requirements:Generic Rept - B&W Designed Units, Technical Evaluation Rept Project stage: Other 1980-08-31
[Table View] |
Text
I
~
.l eral Ifices e folden Street, Berlin, Connecticut -
NW MUMS >
1 l
,= fh NNEC W N t
<L ===; :=
s November 30, 1981
' Docket No. 50-245 8M B10339 C
2S h\\
9 1981*R' r
d Director of Nuclear Reactor itegulation g
DE04 Attn:
Mr. Dennis.M. Crutchfield, Chief g bm.asmucEst WSW p
Operating Reactors Branch #5 U. S. Nuclear Regalatory Commission Washington, D.C.
20555 f
(or g
Gentlemen:
Millstone Nuclear Power Station, Unit No. 1 TMI Action Plan Item II.F.1 High Range Noble Gas Effluent Monitor s
In accordance with Item II.F.1 of NUREG-0737, a high range noble gas effluent monitor is required to be installed by January 1, 1982. To
, allow installation of such a monitor at Millstone Unit No. 1, the con-tinuous stack monitoring system currently in effect must be modified.
Presently,,an isokinetic probe' inserted into the top of the stack di-verts a small percentaee of the total stack exhaust through iodine and particulate filter: >ad two (2) redundant radiation monitors located at the bottom of tb s /,
It is intended that the 1-inch tubing from the nozzle will F~ o '
tuo upstream of the radiation monitors in order to install
-b
'ange nobic gas effluent monitor. Additionally, the 1/2-inch tut ag (
.corcam of the radiation monitors will.also be modified to allov for ndditionsa interconnections.
The Millstone Unit No. 1 Technical Specification 3.8.A.1 and Environ-mental Technica) Specification 2.4.2.2.H require that the gross activity of the gaseous wastes released from the stack be continuously monitored and recorded.
To allow continued cc pliance with these specifications, c
, Northeast Nuclear Energy Company (NNECUy intends to utilize flexible plastic tubing to bypass sections of the installed 1-inch stainless steel tubing upstream of the radiation monitors and the 1/2-inch
~
tubing devnstream of the radiation monitors. During the very small interval of time between the cutting of the installed tubing and the attachment of the flexible tubing, the stack exhaust will not be mon-itored. Also, upon completion of the modifications to the current monitoring system, stack releases will not be monitored while the flexible tubing is. disconnected. However, NNECO has concloded that the t'ntent of Technical Specification 3.8.A.1 and Environmental Technical Specification 2.4.2.2.H will still be met.
{ okkh 6 0112070418 811130 PDR ADOCK 05000245 g
P PDR b
r 4
,
- It is 'ated that monitoring is normally interrupted for short periods of time iuring the routine changing of the iodine and particulate filters.
-Preparations necessary prior to tapping into the present monitoring system are scheduled to be completed by November 30, 1981. NNECO will attempt to install the high range noble gas effluent monitor during any unplanned shutdown of sufficient duration between ap-proximately November 30, 1981 and the time by which we must install t-
. these n.onitors during normal plant operation to assure completion of, this project, including appropriate testing by January 1, 1982.
Ever if the modificatione are performed during a plant shutdown, the tech 11 cal specifications will still need to be met and the above-mentioned tamporary piping hook-up will still be required.
The purpose of this letter is to inform the NRC Staff of the method by which we will remain in compliance with the technical specifications during installation of the high range noble g?.s effluent monitor.
l-No action by the NRC Staff is being requested by this submittal.
l l
Should you have any questions, please feel free to contact me.
I-Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY e
l-
.h l
'll. G. Co%sil l
Senior Vide President
/
w I
'By:
R. T. Werner l
Vice. President Generation i
Engineering and Construction l-l
!~