1 4.
PNMrrHI!AWr IrrII.rFIIES 3
.; 7 7.;"'
gogpogo x
4 co,cycy,o,,,,
(203) 66& 6911 L
L tJ March 1, 1981 4
Docket Nos. 50-213 50-2h5 57 D
50-33o Off
^ '"
so
%9 p7 Mr. Darrell G. Eisenhut, Director h 44
/j 88 Division of Licensing Office of Nuclear Reactor Regulation
%4
~
U. S. Nuclear Regulatory Cccmission h
bf'U Washington, D.C.
20555 4
b
References:
(1)
D. G. Eisenhut letter to All Operating Plants and Applicants for Operating Licenses and Holders cf Construction Permits, dated October 31, 1980, forwarding NUREG-0737 (2)
W. G. Counsil letter to D. G. Eisenhut, dated December 31, 1980.
Gentlemen:
Haddam Neck Plant Millstone Nuclear Power Station, Unit Nos.1 and 2 Emergency Core Cooling System Outage Report Item ll.K.3.17 of Reference (1) required Connecticut Yanhee Atomic Power Company (CYAPCO) and Northeast Nuclear Energy Company (NUECO) to submit a report detailing outages of all Energency Core Cooling Systems for the Haddam Neck Plant and Millstone Unit Nos.1 and 2 for the last five years of operation.
CYAPC0 and NNECO provided outage data through 1979 in Eeference (2) and informed the Staff that data for 1980 was being compiled and would be for-warded to the Staff as soon as it became available. Accordingly. Attachments 1, 2, and 3 for the Haddam Neck Plant, and Millstone Unit Nos.1 and 2, respectively, are provided in fulfillment of this commitment.
It should be noted that some ECC systems which were listed on the " Form A" forwarded in Reference (2) experienced no outages in 1980 and, therefore, are not listed on the " Form 1" included in each attachment.
CYAPCO and NNECO have reviewed these reports and reiterate the conclusions detailed in Reference (2) that no system or Technical Specification modifications are required to enhance plant reliability, availability, or safety, and, as such, 810812O M S P
i no actions as a result of this review are planned.
CYAPC0 and ri?iECO vill, however, use the ecmpiled information in conjunction with future cor.:-
pilations to determine if future system or Technical Specification modifications are indeed necessary.
We trust you will find this information responsive to your request.
Very truly yours, CO:l?iECTICUT YAIIKEE ATOMIC POWER COMPA!iY
!!ORTEEAST IiUCLEAR E'iERGY COMPMiY f l ??.A r
W.' G. Counsil Senior Vice President I
1 Docket No. 50-213 Attactment 1 Ifaddam Neck Plant TMI Action Plan Item 11.K.3.17 Emergency Core Cooling System Outage Report March, 1981
FORM A ECC SYSTEM OUTAGE REPORT UTILITY Connecticut Yankee Atomic Power Company PLANT lladdam '!eck UNIT 1
DATE OF COMMERCIAL OPERATION January 1, 1068 REPORT COVERS PERIOD 1/ 80 THROUGH 12/ 80 NUMBER OF DAYS OF COLD SHUTDOWN DURING REPORT PERIOD 73.2.
FORMS B COMPLETED FOR FOLLOWING SYSTEMS:
Emergency Diesel Auxiliary System (single engine outaaps)
.A i
P, Chemical Volume and control System (single valve nutaae) j i
i i
1 l
Ci I
i a
l I
i i
3 I_!
I t
t l
l l
c_
FORM B ECC SYSTEM OUTAGE REPORT PLANT Haddam Neck UNIT One SYSTEM Diesel PAGE 1 Of 1 OUTAGE DURAT10N OF CAUSE/CDPRFrTIVF ACTION DATE OUTAGE (DAYS) 1/03/80 0.05 niesel Start timers faulty. Renlaced timers.
6/17/80 0.33 Jacking gear engaged during diesel test run. neburred flywheel.
7/09/80 0.08 Diesel start relay inadvertently crushed by Wrter. Replaced relay.
9/05/80 0.05 Diesel start relay inlet air fittinq leaking. Replaced fitting.
euer a
.=;; __....
. FORM B ECC SYS1EM OUTAGE REPORT PLANT I!addam "ect UNIT One SYSTEM CVCS PAGE 1 Of 1 00TAGE DURAT10N Of CAUSE/ CORRECTIVE ACTIMI DATE 001 AGE (OAVS)_
8/20/80 0.5 Charging. flow control valve failed open. Replaced solenoid coil.
em O
l Docket No. 50-2h5 Millstone Nuclear Power Station, Unit No.1 TMI Action Plan Item 11.K.317 Energency Core Cooling System Outage Report March, 1981
i 4
FORM A ECC SYSTEM OUTAGE REPORT UTILITY Northeast Nuclear Energy Co..
PLANT Millstone UNIT One DATE OF COMMERCIAL OPERATION 12/28/70 REPORT COVERS PERIOD if80 THROUGH 12430 112 NUMBER OF DAYS OF COLD SHUTDOWN DURING REPORT PERIOD FORMS B COMPLETED FOR FOLLOWING SYSTEMS:
ixi FreshWaterCoolantInjection(singlevalve)
Ixi Isolation Condenser (one subsystem)
L2LJ fore Spray Ix i Low Pressure Coolant Injection
{ g RHR Emergency Service Water L'
i i
i 6
l i
i L_ _t i
i i
t l
t i
..~
- - - ~.
l t
FORM 8 ECC SYSTEM OuiAGE REPORT e
PLANT Millstone UNIT I
SYSTEM FWCI PAGE 1 Of_ 1 l
l OUTAGE DURATION OF CAUSE
,DATE OuiAGE (DAYS) i 2/5/80 3.5 Va'ive operator failed on valve closure. Rewound motor / controller contact replacemen..
e e
M e
9
FORM B ECC SYSTEM OUTAGE REPORT Isolation PLANT Millstone UNIT 1
SYSTEM Condenser PAGE 1 0F 1
OUTAGE DURATION OF CAUSE DATE OUTAGE (DAYS) 1/5/80 37.8 Piping Sunpor' r.cniace. Supports repaired / modified.
II/f/80 55.6 t'umerous niping cracks in sunply and roturn linas. Pipino renlaced with imnroved material.
d a
sronn ia l
1 y
t i
fO r
oe t
I n
i E
r G
e A
n P
na l'
y a
e r
p p
i S
n e
o r
t o
f e
u H_
E d
E S
I T
U e
R S
A l
O Y
C ba.
P S
rd L
ee R
pfor E
im n
GA e
lu I
yr l
O ed M
vn T
ia t
i I
t S
N a1 <
Y U_
ro S
t n sa C
ii C
ns E
ie nt M r<
o Pdn e
1 o
FS n
OY o
A t
NO s
O(
8 i
I l
TE 4
AG 1
l RA i
f UT DUO T
NA LP 0
8 0
E. E
/
r 0
H AT 2
TA R
0D
/
O 0
2 f
llllll lll
t FORM B ECC SYSTEM OUTAGE REPORT l.ov Pressure SYSTEM 00lant In.i. PAGE I Of I
f PLANT Hillstone UNIT 1
OUTAGE DURAT10N OF CAUSE DATE_
OUTAGE (DAYS) 6/13/80 10.3 Pipe support anchor bolt failure. Replaced anchor bolts.
em o
e
FORM B ECC SYSTEM OUTAGE REPORT Fmorooncy SYSTEM erVice t'aterPAGE 1 Of 1 S
Pl. ANT Millstone UNIT 1
00TAGE DURAT10N OF EAUSE DATE OUTAGE (DAYS)_
4/9/80
.2 l't. Fxchgr. Dischg. Valve faile<1 to onen. Valve operator / controller calibration.
me e
l Docket No. 50-336 Millstone Nuclear Power Station, Unit No. 2 24I Action Plan Item ll.K.3.17 Emergency 3re Cooling System Outage Report March,1981
v.
I FORM A ECC SYSTEM OUTAGE REPORT UTILITY t'ortheast "uclear Enercy Ca.
PLANT itillstone UNIT II DATE OF COMMERCIAL OPERATION 12/26/75 REPORT COVERS PERIOD 1/80 THROUGH E RA NUMBER OF DAYS OF COLD SHUTDOW'i DURING REPORT PERIOD 06.F FORMS B CCMPLETED FOR FOLLOWING SYSTEftS:
t x i Safatv In.iection iT, Fncinaered Safety Featuras 1x; niesel Carerator f
1 C'
L___'
1 1
i 6
i l
I i
1
FORM B ECC SYSTEM OUTAGE REPORT Safety PLANT Millstone (3rili II SYSTEM Injection PAGE i Of 3 00TAGE DURAi10N Of CAUSf/CORRFCTIVF ACTIOff DATE OUTAGE (DAYS) 1/31/80
.47 Valve SI-654 leakina. Valve repacted.
ed e
l FORM B ECC SYSTEM OUTAGE REPORT Diesel Standby Power PAGE 2
Of 3
PLANT Millstone UNIT 11 SYSTEM OUTAGE DURATION OF CAUSE/CORRFCTIVF ArTION DATE OUTAGE (DAYS) 2/5/80 1.07 "B" diesel tripped on hiah crankcase pressure due to installed lube oil cooler vent inadvertently vented oil from cooler. Removed vent line on oil cooler and refilled lube oil.
2/26/80
.41 "A" diesel breaker, A312, did not close due to dirty contact in the synchronizing check relay. Cleaned contact.
3/5/80
.38 "A" diesel breaker, A312, did not close due to loose coupling on synchronizing switch, 25-CS. Tiahtened set screw on' switch.
5/6/80
.5 "B" diesel breaker, A401, closino latch failed to latch due to a
,untightened bolt in latch mechanism. Tightened bolt.
7/8/80 01 "B" diesel was removed from service inadvertently by an operator. Diesel was subsequently restarted and onarator informed of the error.
8/12/80
.33 Frayed insulation on a wire in the bendix connector, which connects the speed sensor to the governor of "A" diesel. Cut back on wire, stripped and applied heat shrink. Reconnected wire.
IORM B ECC SYSTEM OUTAGE REPORT fngineering Millstone UNIT II SYSTEM Safequards PAGE 3
Of 3
PLANT OUTAGE DURATION Of CAUSE/CORRfCTIVF ArTInft DATE Ou1 AGE (DAYS) 5/29/80
.22 Containment air recirculating fans 'A'
?- 'C' would not run in slow due to faulty ESAS slow speed actuation relay, K515A. Replaced K515A relay.