LER 80-077/03L-0:on 801013,nine of 20 Control Room Normal Ventilation Dampers Did Not Close within 10-s Limit.Caused by Insufficient Bleedoff Capacity for Control Air Header Which Feeds & Bleeds 10 Dampers Per Header
ML19340C287
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/10/1980
From: Isley T, Melstad K
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19340C286 List:
References
LER-80-077-03L, LER-80-77-3L, NUDOCS 8011140432
Download: ML19340C287 (2)


Text

. - - .- -. - - - - -

NRC FORM 3M U. S. NUCLE AR REGULATORY CoMMISGIOZ (7 771 LICENSEE EVENT REPORT

. CONTROL BLOCK: l i

l l l l l lh e

(PLEASE PRINT OR TYPE ALL REQUIRED INFC 1 MAT 10N1

[oTil8 I3 o l HLILEf=5EE 7

l D l COOE B l S l141 l@l 15 0 l 0 l 0 l UCENSE 0 l 0 NvYSEH l 0 l 0 l 0 l0 l0 hl 0 l@l4 LICENSE 2t6 l1 l1 l1 TVPE l1JOl@lSi LAI l Sd l@

CON'T

' 7 l'o'T71 8

5gAJlL 60

@l015l0l-l0l3l4l6 g!1l0illais 10 l@l111 l1 l0 l8 l0 l@

6' DoCnET NLV8gR 68 b) EVENT DATE 14 75 REPORT DATE 80 EVENT OESCRIPTION AND PROBABLE CONGEQUENCES h 4

Io 12'l l (NP-M-80-96) On 10/13/80 at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> durinz the performance of the Safety Features l go;3i ; Actuation System Response Time Test, it was observed that 9 of the 20 control room l o 4 l normal ventilation dampers would not close within their 10 second limit for the con- l go,3g;tainment high radiation actuation. Being in Mode 5, the station did not enter the l i

1016 l l action statement of T.S. 3.7.6.1. There was no danger to the health and safety of the1

[ o l 7 l l public or station personnel. The valves did actually close but then allowable stroke l

} g 3 ;y ; gtime was excieded by one second. J80 7 8 9 CODE CODE SUSC E CCMPONE NT CODE SL C DE S E loisi I S l c l@ [sj@ l@ l z l z l z l z l z i z i@ g@ [_Zj @

? 8 9 to 11 12 13 Ig 19 20

_ SEQUENTIAL OCCUR R E NCE REPORT REVISICN LE R EVENT YEAR REPORT NO. CODE TYPE N O.

, @ ngg'Ro a

_ 21 I81 01 22 l---I 23 I 01717l 24 20 M27 1013I 28 23 O

30 9

31 10l 32 7K N AC O ON PL T YETH HOURS 22 S B IT D FOF t H. SUPPli MAN FAC LRER lF lglJezlg l zlg JJ b

[ zjg 30 3 l 0 l 0l 0l l 40

[__jg 41 lYlg 42 lzlg 43 lzl9[9l9[g 44 47 CAUSE DESCRIPTION AND CORRECUE ACTIONS

g,iollThe cause was insufficient bleedoff capacity for the control air header which feeds and) g,gi;g leeds b 10 dampers per header. FCR 80-244 added a bleedoff solenoid valve to each contrb1

,,,g gair damper header. This improved the response time of the dampers. ST 5031.06 was l lsuccessfully performed. The control room normal ventilation system was declared operai

,, ,,,i ble at 1305 hours0.0151 days <br />0.363 hours <br />0.00216 weeks <br />4.965525e-4 months <br /> on 10/20/80. 1 7 8 9 80 STA S  % POWER oTHER STA TUS OlSCO RY DISCOVERY DESCRIPTION y lH l@ l 0 l 0 l 0 l@l NA l l B l@l SuTvei11ance Test ST 5031.06 l ACTIVITY CO TENT RELEASE AMOUNT OF ACTIVITY LoCATICN OF RELEASE l,1_[6] [Z_] @D OF RELEASE (_Z_j@l NA I l NA I F a 9 10 tt 44 45 80 PERSONNEL f XPOSURES NUVBE R TYPE DESCRIPTION i 7 101010 l@LZJ@l N^ l PERSONNEL INr HIES NUYBER DESCRipilON I TTI3 9101010 l@l 7 11 12 NA 80 l

LOSS 05 on DAMAGE To FACILtTV TYPE DESCnmiloN 8 lZ_J 7 8 9

@l to NA SO I

i NRC USE ONLY 1:l"ILd@[1,y""NA 'Ecy,rnoy @ l llllllllll ll12 x u i,>

E " "' "" *

~m Eo P m Aucn3 011140 %x. netstad/T.m cv PoO. u 9-2s9-snon. rn . 29w230

v o

, TOLEDO EDISON COMPANY  !

DAVIS-BESSE NUCLEAR POWER STATION UhIT ONE l SUPPLEMENTAL INFORMATION FOR LER_NP-33-80-96 4

DATE OF EVENT
October 13, 1980 t
FACILITY
Davis-Besse Unit 1 IDENTIFICATIbN OF OCCURRENCE: Control room normal ventilation dampers failed to iso-late within the 10 second time limit for containment high radiation actuation j

Conditions Prior to Occurrence: The unit was in Mode 5 with Power (MWT) = 0 and Load (Gross MWF) = 0.

I j Description of Occurrence: At 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> on October 13, 1980 during the performance 4

of the Safety Features Actuation Syster (SFAS) Overall Response Time Test ST 5031.06, the following control room normal ventilation isolation dampers HV5301A, 5301B, 5301E, 1

5361A, 5362A, 5362B, 5311A, 5311B and 5311E exceeded the required actuation time of

{ 10 seconds for containment high radiation actuation. Being in Mode 5, the station did

! not enter the actidn statement of Technical Specification 3.7.6.1. The Technical Speci-fication requires the two control room emergency ventilation systems to be operable in

! Modes 1, 2, 3, and 4. This event is being reported to document the failure of techni-cal specification equipment to meet all of its operating criteria. .

4 Designation of Apparent Cause of Occurrence: The cause has been 2rmined to be a

design error. The problem was an insuf ficient bleedoff rate of tu control air header.

There are two control room normal ventilation trains. There are ten dampers on each

, train. The control for the ten dampers in each train is from one control air header -

with one solenoid control valve feeding and bleeding the header. Feeding the header i

has not been a probles since the dampers are normally open. However, the bleedoff rate has been too restrictive and the closing times for the dampers have always been near the limit. Normal wear and any dust buildup or slight corrosion is enough to cause the damper to fail its closing response time requirement. Therefore, it was

. necessary to increase the bleedoff rate. '

l Analysis of Occurrence: There was no danger to the health and safety of the public or

! to station personnel. The dampers failed the acceptance criteria by less than one

second each. They were operable in all other aspects.

C'orrective Acticn: Facility Change Request 80-244 was implemented which added a bleed-off solenoid valve to each control air header. The added bleedoff capacity has improved the damper closing times such that all dampers close within the required time.

ST 5031.06 was successfully performed at 1305 hours0.0151 days <br />0.363 hours <br />0.00216 weeks <br />4.965525e-4 months <br /> on October 20, 1980, and the control room normal ventilation system declared operable.

i Failure Data: A failure due to insufficient bleedoff was reported in Licensee Event Report NP-32-79-10 (LER 79-084).

LER #80-077 i