Letter Sequence Other |
|---|
|
|
MONTHYEARML19329D6911977-05-10010 May 1977 Forwards Proposed Surveillance Program to Monitor Containment Dome to Detect Future Delaminations Project stage: Request ML19329D6601977-05-31031 May 1977 Notifies That Proposed Containment Dome Surveillance Program Described in 770426 Rept, Containment Structural Integrity Dome Surveillance, Revision 1,has Been Reviewed & Found Acceptable Project stage: Other ML19308D6131977-11-23023 November 1977 Forwards Tech Spec Change Request 14,requesting Amend to App a of License DPR-72.Certificate of Svc Encl Project stage: Other ML19308D6151977-11-23023 November 1977 Tech Spec Change Request 14 Re Tech Specs 3.6 & 4.6,revising Surveillance Program for Monitoring Containment Dome Project stage: Other ML19319D2771978-01-0303 January 1978 Responds to Technical Assistance Request for Review of Util Tech Spec Change Request Re Containment Dome.Change Approved Project stage: Approval ML19249E9231979-09-0606 September 1979 Safety Evaluation Supporting Amend 24 to License DPR-27 Project stage: Approval ML19249E9191979-09-0606 September 1979 Forwards Amend 24 to License DPR-72,safety Evaluation & Notice of Issuance & Availability Project stage: Approval ML19249E9241979-09-0606 September 1979 Notice of Issuance & Availability of Amend 24 to License DPR-72 Project stage: Other ML19249E9221979-09-0606 September 1979 Amend 24 to License DPR-72,incorporating Approved Dome Delamination Surveillance Program,Correcting Typographical Errors & Making Tech Specs More Consistent with Current Std Tech Specs Project stage: Other ML19296D0551980-02-15015 February 1980 Tech Spec Change Request 13,Revision 1,for Amend to OL App A.Consists of Replacement Pages 3/4 6-8,3/4 6-8a,3/4 6-9,3/4 6-9a & B 3/4 6-2,allowing Testing Per Reg Guide 1.35 Re Ungrouted Tendon Inservice Insp Project stage: Other ML19296D0361980-02-15015 February 1980 Forwards Tech Spec Change Request 13,Revision 1,for Amend to OL App A.Revises Tendon Surveillance Program.Affidavit & Certificate of Svc Encl Project stage: Other ML19344D5501980-04-0303 April 1980 Safety Evaluation Supporting Amend 29 to License DPR-72 Project stage: Approval ML19344D5531980-04-0303 April 1980 Notice of Issuance of Amend 29 to License DPR-72 Project stage: Approval ML19344D5461980-04-0303 April 1980 Amend 29 to License DPR-72,revising Tech Specs Re Containment Structural Integrity,To Incorporate Guidance on Selecting Number of Tendons for Insp & Detensioning Requirements.Revised Pages Encl Project stage: Other ML19320B2691980-06-18018 June 1980 Notice of Issuance & Availability of Amend 31 to License DPR-72 Project stage: Other ML19320B2621980-06-18018 June 1980 Amend 31 to License DPR-72,deleting Requirements for Maintaining Containment Test Pressure When Inspecting Tendon End Anchorages Project stage: Other ML19320B2571980-06-18018 June 1980 Forwards Amend 31 to License DPR-72,safety Evaluation & Notice of Issuance & Availability Project stage: Approval ML19320B2651980-06-18018 June 1980 Safety Evaluation Supporting Amend 31 to License DPR-72 Project stage: Approval 1978-01-03
[Table View] |
Text
_
/
l
(%
Y.
DISTRIBUTION Docket File NRC PDR Local PDR LWR-#1 File bec: JBuchanan, NSIC MAY 311977 Dvassallo TAbernathy, TIC Docket No. 50-302 FWilliams CNelson JStolz RReid Florida Power Corporation JAngelo KGoller ATTH: Mr. J. T. Rodgers EHylton JMcGough Assistant Vice President and ACRS(16)
Nuclear Project Manager ELD P. O. Box 14042 IE (3)
St. Peter'sburg, Florida 33733 HSmith
~
Gentlemen:
SUBJECT:
SURVEILLANCE OF THE CONTAINMENT DOME (CRYSTAL RIVER UNIT 3)
We have completed our review of your proposed program for surveillance of the containment dome as described in the document titled " Containment Structural Integrity Dome Surveillance", Rev.1, dated April 26,1977, which was submitted with your letter dated May 10,1977. The purpose of the surveillance program is to detect future delamination of the reactor containment building dome. The surveillance program was submitted in compliance with the requirement of paragraph 2.C.(8) of the Facility Operating License No. DPR-72.
Based on our review, we detemined that the surveillance program will provide for a system of measurements of vertical movement of the dome and mapping of crack widths and crack patterns at periodic intervals that can determine the condition of the structure within acceptable limits. Therefore, we conclude that the proposed surveillance program is acceptable.
We request that you submit a technical specification based on the proposed surveillance program for inclusion in the Appendix A Technical Specifications of Facility Operating License No. DPR-72.
~ If you have any further questions regarding this matter, please contact us.
~ Sincerely.
Original Signed bg JohnF.Stols sj John F. Stolz, Chief Light Water Reactors Branch No. 1 4
Division of Project Management pA cc: See Page 2
- 1
' #1
_. {lo:klj o
,,e.
Anj e J
e...a oate >
NRC PORM 318 (9 76) NRCM 0240 1't us e. eovan urur pasurises orrics. teve-eas.ea4 8003160 % 8 3 h
.