Letter Sequence Approval |
|---|
|
|
MONTHYEARML19329D6911977-05-10010 May 1977 Forwards Proposed Surveillance Program to Monitor Containment Dome to Detect Future Delaminations Project stage: Request ML19329D6601977-05-31031 May 1977 Notifies That Proposed Containment Dome Surveillance Program Described in 770426 Rept, Containment Structural Integrity Dome Surveillance, Revision 1,has Been Reviewed & Found Acceptable Project stage: Other ML19308D6131977-11-23023 November 1977 Forwards Tech Spec Change Request 14,requesting Amend to App a of License DPR-72.Certificate of Svc Encl Project stage: Other ML19308D6151977-11-23023 November 1977 Tech Spec Change Request 14 Re Tech Specs 3.6 & 4.6,revising Surveillance Program for Monitoring Containment Dome Project stage: Other ML19319D2771978-01-0303 January 1978 Responds to Technical Assistance Request for Review of Util Tech Spec Change Request Re Containment Dome.Change Approved Project stage: Approval ML19249E9231979-09-0606 September 1979 Safety Evaluation Supporting Amend 24 to License DPR-27 Project stage: Approval ML19249E9191979-09-0606 September 1979 Forwards Amend 24 to License DPR-72,safety Evaluation & Notice of Issuance & Availability Project stage: Approval ML19249E9241979-09-0606 September 1979 Notice of Issuance & Availability of Amend 24 to License DPR-72 Project stage: Other ML19249E9221979-09-0606 September 1979 Amend 24 to License DPR-72,incorporating Approved Dome Delamination Surveillance Program,Correcting Typographical Errors & Making Tech Specs More Consistent with Current Std Tech Specs Project stage: Other ML19296D0551980-02-15015 February 1980 Tech Spec Change Request 13,Revision 1,for Amend to OL App A.Consists of Replacement Pages 3/4 6-8,3/4 6-8a,3/4 6-9,3/4 6-9a & B 3/4 6-2,allowing Testing Per Reg Guide 1.35 Re Ungrouted Tendon Inservice Insp Project stage: Other ML19296D0361980-02-15015 February 1980 Forwards Tech Spec Change Request 13,Revision 1,for Amend to OL App A.Revises Tendon Surveillance Program.Affidavit & Certificate of Svc Encl Project stage: Other ML19344D5501980-04-0303 April 1980 Safety Evaluation Supporting Amend 29 to License DPR-72 Project stage: Approval ML19344D5531980-04-0303 April 1980 Notice of Issuance of Amend 29 to License DPR-72 Project stage: Approval ML19344D5461980-04-0303 April 1980 Amend 29 to License DPR-72,revising Tech Specs Re Containment Structural Integrity,To Incorporate Guidance on Selecting Number of Tendons for Insp & Detensioning Requirements.Revised Pages Encl Project stage: Other ML19320B2691980-06-18018 June 1980 Notice of Issuance & Availability of Amend 31 to License DPR-72 Project stage: Other ML19320B2621980-06-18018 June 1980 Amend 31 to License DPR-72,deleting Requirements for Maintaining Containment Test Pressure When Inspecting Tendon End Anchorages Project stage: Other ML19320B2571980-06-18018 June 1980 Forwards Amend 31 to License DPR-72,safety Evaluation & Notice of Issuance & Availability Project stage: Approval ML19320B2651980-06-18018 June 1980 Safety Evaluation Supporting Amend 31 to License DPR-72 Project stage: Approval 1978-01-03
[Table View] |
Text
d p ctr N
4'
- (
UNITED STATES NUCLEAR REGULATORY COMMISSION 2
e o
WASHINGTON. D. C. 20555
'b
+..../
June 18, 1980
'+
Docket No. 50-302 Mr. J. A. Hancock Director, Nuclear Operations Florida Power Corporation P. O. Box 14042, Mail Stop C-4 St. Petersburg, Florida 33733
Dear Mr. Hancock:
The Commission has issued the enclosed Amendment No. 31 to Facility Operating License No. DPR-72 for the Crystal River Unit No. 3 Nuclear Generating Plant.
The amendment consists of changas to the Technical Specifications in partial response to your submittal dated Noven'.er 21, 1977, as revised and supplemen-ted February 15, 1980 and May 14, 1980.
This amendment revises Technical Specification 4.6.1.6.2 to delete require-
~
ments for maintaining a containment test pressure when inspecting tendnn end anchorages.
Copies of our Safety Evaluation and the Notice of Issuance are also enclosed.
Sincerely, Y kg ert W. Reid, Chief Operating Reactors Branch #4 Division of Licensing
Enclosures:
1.
Amendment No. 31 2.
Safety Evaluation 3.
Notice cc w/ enclosures: See next page 8 0 0 7.KS 0 ///
Crystal River-3 50-302 Florida Power Corporation cc w/ enclosure (s):
Mr. S. A. Brandimore Mr. Robert B. Borsum Yice President and General Counsel Babcock & Wilcox P. O. Box 14042 Nuclear Power Generation Division St. Petersburg, Florida 33733 Suite 420, 7735 Old Georgetown Road Bethesda, Maryland 20014 Mr. Wilbur Langely, Chairman Board of County Commissioners cc w/ enclosures & incoming Citrus County dtd: 2/15 & 5/14/80 Iverness, Florida 36250 Bureau of Intergovernmental Relations U. S. Environmental Protection Agency 660 Apalachee Parkway Region IV Office Tallahassee, Florida 32304 ATTN: EIS COORDINATOR 345 Courtland Street, N.E.
Atlanta, Georgia 30308 Mr. Barry Smith, Resident Inspe.ctor U. S. Nuclear Regulatory Comnission Director, Te'5nical Assessment P. O. Box 2082 Division Crystal River, Florida 32629 Office of Radiation Programs (AW-459)
U. S. Environmental Protection Agency Crystal Mall #2 Arlington, Virginia 20460 Crystal River Public Library Crystal River, Florida 32629 Mr. J. Shreve The Public Counsel Room 4 Holland Bldg.
Tallahassee, Florida 32304 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Attorney General Department of Legal Affairs The' Capitol Tallahassee, Florida 32304 Dr. William R. Stratton Los Alamos Scientific Lab Box 503 Los Alamos, New Mexice 87544 l
.