Letter Sequence Meeting |
|---|
|
|
MONTHYEARML19308D6741976-12-0909 December 1976 Requests Mod to License DPR-72,allowing Operation in Modes 1 Through 6 Up to 2,452 Mwt.Summarizes Activities to Alleviate Concerns Explicit to Limiting License to Modes 5 & 6 Project stage: Request ML19331E1421976-12-30030 December 1976 Forwards Amend 1 to License DPR-72 & Notice of Issuance & Availability Project stage: Other ML19309A0881976-12-30030 December 1976 Notice of Issuance of Amend 1 to License DPR-72 Project stage: Approval ML19331E1441976-12-30030 December 1976 Amend 1 to License DPR-72,requiring Completion of post-accident Hydrogen Purge Test Prior to Initial Criticality & Completed Review of Containment Structural Integrity Test Before Proceeding Beyond 5% Rated Power Project stage: Approval ML19319D4591977-01-12012 January 1977 Requests Details of RCS Flow Indication Mod & Installation Completion Schedule.Failure in Common Pressure Sensing Line Could Cause Reactor Operation Outside Acceptable Tech Spec Limits Project stage: Other ML19317G4551977-02-17017 February 1977 Responds to Requesting RCS Flow Indication Mod to Meet Single Failure Criterion.Requests Meeting W/Nrc & B&W Licensees to Discuss Mod.Addl 60 Days Requested to Evaluate Potential Solutions Project stage: Meeting ML19329D6481977-03-22022 March 1977 Responds to Granting Util Until 770417 to Submit RCS Design Mods.Meeting W/B&W Licensees Scheduled for 770330-31 to Discuss RCS Mods Project stage: Meeting 05000312/LER-1978-018-03, /03L-0:on 781221,while Increasing Power After Second Refueling Outage,Rcs Flow Indicator a Unusually Steady & Spurious Alarms Received.Caused by Operator Error. Transmitter Returned to Svc & Operator Instructed1979-01-15015 January 1979 /03L-0:on 781221,while Increasing Power After Second Refueling Outage,Rcs Flow Indicator a Unusually Steady & Spurious Alarms Received.Caused by Operator Error. Transmitter Returned to Svc & Operator Instructed Project stage: Other 05000312/LER-1978-018, Forwards LER 78-018/03L-01979-01-15015 January 1979 Forwards LER 78-018/03L-0 Project stage: Other ML20040A6711979-01-25025 January 1979 Discusses Div of Operating Reactors & Div of Safety Sys Review of Instrument Piping on Reactor Coolant Flow Transmitter Reactor Protection Sys.Min of Two Sys Should Be Required Per Loop.Ser Section7.0 Encl Project stage: Approval ML19273B3981979-03-12012 March 1979 Concludes That Installation of Redundant Set of Sensing Lines for Each Reactor Coolant Loop Would Be Satisfactory Mod to Reactor Coolant Flow Sensing Sys,For Single Failure Considerations.Requests Util Response Project stage: Other ML19263D3261979-03-21021 March 1979 In Response to Requesting Info Re Installation of Redundant Flow Sensing Lines During 790423 Refueling Outage, Advises That Details Will Be Submitted by 790330 Project stage: Other 1977-03-22
[Table View] |
Text
.__ - __________ _ _______ _ _
e..
4 Distribution NRC PDR Local PDR LWR-1 File ~[a ec= N Docket Fi1e ~
MAR 2 21977 DBVasst lo Docket No. 50-302
^
FJWilliams JFStolz JAngelo EHylton Florida Power Corporation ACRS (16)
ATTN: Mr. Joel T. Rodgers ELD Assistant Vice President and IE (3)
Nuclear Project Manager HSmith P. O. Box 14042 RWReid St. Petersburg, Florida 33733 CNelson bec: JRBuchanan, NSIC Gentlearn:
TBAbernathy, TIC
SUBJECT:
REACTOR COOLANT SYSTEM FLOW-INDICATION (CRYSTAL RIVER UNIT 3)
This letter is in' reply to your letter dated February 17, 1977, wherein you requested an additional 60 days in which to provide us with details of the design modification to the reactor coolant system flow indication, and to allow time to discuss the pvvblem with the NRC staff. You also requested a meeting with the staff.
We have arranged a meeting with your representatives to discuss this matter, among other items, on March 30 and 31,1977. We have
~
no objection to other BAL licensees attending this meeting, and have informed Toledo Edison Company in the matter of Davis Besse Unit 1 that this meeting has been scheduled.
l Also, we have no objection to extending the time for submittal of design modifications an additional 60 days to April 17. 1977.
3 Sincerely, Orfginal Signed by i
John F.Stols
!}
John F. Stolz, Chief N.
Light Water Reactors i; ranch No.1
.\\
Division of Project Management 4
cc: Mr. S. A. Brandisere
\\
Vice President and General Counsel
\\
P. O. Box 14042 St. Petersburg, Florida 33733 M
Mh f 8
(*LHER PM: ( l o,,,c.
aa
'n,elNk.._._JESto.
.va.* = *-f
..,. L)/Il/77
/
_3/ 2J7 2
=c== m o.m =cu m.
. y...
...... o,,,c 8003160171 f
. -.