ML19317G455
| ML19317G455 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/17/1977 |
| From: | Rodgers J FLORIDA POWER CORP. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| TAC-07125, TAC-7125, NUDOCS 8003160063 | |
| Download: ML19317G455 (3) | |
Text
v.s. NuCLEAa nEcutAvomy auissioN ooCKET NuM BE P a.,., omu 195 se -a e cr NRC DISTRIBUTION con PART 50 DOCKET MATERIAL TO:
FROM: Fle:Ida Power Corporation oATE OF ooCu k W J F SW St Petersburg, Fla J T RodgerS oATE RECElvEo 2 J5LETTEn ONoTonizEn Paor NPut FORM NUMBER oF COPIES RECEtVEo oRiotN AL ENC LASSIFIE o one signed oE5calPTioN ENCLOSURE Ltr re our 1-12-77 ler.... requesting an exten sion of 60 days to respond to NRC request re reactor Coolant system flow indication.............
[DONOT REMOVE 2p l ACKNOWLEDGED Crystal River #3 SAFETY FOR ACTION /INFORMATION pwttran 2-22-77 ehf
/ ASSIGNED AD:
/ BRANCH CNT*Ft
.S f_0 / w_
nnawem r'nTvv.
/ PROJECT MANAGERr dd4[C PROJECT MANAGER:
/ LIC. ASST.
- / den LIC. ASST.
/ C. A)c is e n l
INTERNAL DISTRIBUTION fREv r uJ3 SYSTEMS SA/ETY PLANT SYSTEMS SITE SAFETY &
< - w n..
HEINEMAN
/
TspESCO ENvik0 ANATYETS
/ I & E (31 SCHROEDER
/
BENAROYA DENTON & Mf17.7TR
/ OELD
/
T.ATMAM GOSSICK & STAFF ENGINEERING
/
IPPOLITO ENVIRO TECN.
MIPC MACARRY KTRKWOOD ERNST CASE
/
BOSNAK l
BALLARD HANAUER
/
SIHWEIL OPERATING REACTORS SPANGLER HARLESS
/
PAWLICKI
/
STELLO SITE TECH.
PROJECT MANAGEMENT REACTOR SAFETY OPERATING TECH.
/
CAMMILL/r/
BOYD
/
ROSS EISENRITI STEPP P. COLLINS
/
NOVAK SHA0 HULMAN HOUSTON f
ROSZTOCZY BAER PETERSON
/
CHECK BITfLER SITE ANALYSIS iMELTZ CRIMES
/
VOLLMER HELTEMES AT & I
/
BUNCH SK07 HOLT SALTZMAN j
J. COLLINS RUTBERG KREGER EXTERNAL DISTRIBUTION CONTROL NUMBER
/LPDR: Cmf a /. P ( k NAT. 7AB:
BROOKHAVEN MAT. T.AR.
/ TIC:
REG V.IE ULRIKSON (ORNL) f.NSIC:
g
'ASLB:
CONSULTANIS: _
"4
/ ACRSlh CTS 9819TWtr/ SEPT As cF M 1/ W/^>
1 p
5 0 0 31 O u u g))
l Nec anau m rp.m
~
,~-_-a m
ene v
ee@
e
" 'I " w. ~ ~,..
j "t;.3 A$LMllH$k s
Flos'icia
% z '.,
Qg z.
~j 4t,3 w,
f:
February 17, 1977 l2 Q
- t
(%, u. &, W g, U
.,i.
e q
j Mr. John Stol:
T
- 8.-j Branch Chief Light Water Reactors Branch I
- O
'efh
-T
'y 9'
- Y;i p [d Division of Project Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 N
Subject:
Crystal River Unit #3 Docket No. 50-302
Dear Mr. Stol:
On January 17, 1977, we received your letter of January 12, 1977 requesting FPC to respond within 30 days to an NRC position requesting that the reactor coolant system flow indication for Crystal River Unit #3 be modified to meet single failure criterion.
The response was to include de-tails of any design modification proposed and the schedule for the con.pletion of the installation of the proposed modi-fication ass;' ming acceptance by NRC.
Since receipt of your letter, we have been in contact with our NSSS supplier, B6W, and other B6W licensees who have re-ceived a similar NRC position letter, in an attempt to arrive at possible solutions to your position.
As of this writing, we have not established a definite approach to the concern, but are evaluating several potential solutions which we should discuss with you.
We request the opportunity to meet with you and/or your staff to discuss this p roblem.
We also feel it would be beneficial if other B6W licensees who have received your position letter be invited to attend the meeting.
Please inform us of the possibility of such a meeting, so that this problem can be resolved and the requested modification
'). s. U General Office 3201 Thirty-fourtn street soutn. P.O. Box 14042. St Petersburg, F;orida 33733 e 813--866 5151
' s.
2-February 17, 1977 Mr. John Stolz can be effected.
To allow time for such dialogue to take place with you and formulation of our design, we request an additional 60 days in which to accomplish both activities, Very truly yours,
%D,.,dC)
,~
J. T. Rodgefs Asst. Vice President JTR/iw
=