MONTHYEARML19308D6741976-12-0909 December 1976 Requests Mod to License DPR-72,allowing Operation in Modes 1 Through 6 Up to 2,452 Mwt.Summarizes Activities to Alleviate Concerns Explicit to Limiting License to Modes 5 & 6 Project stage: Request ML19331E1421976-12-30030 December 1976 Forwards Amend 1 to License DPR-72 & Notice of Issuance & Availability Project stage: Other ML19309A0881976-12-30030 December 1976 Notice of Issuance of Amend 1 to License DPR-72 Project stage: Approval ML19331E1441976-12-30030 December 1976 Amend 1 to License DPR-72,requiring Completion of post-accident Hydrogen Purge Test Prior to Initial Criticality & Completed Review of Containment Structural Integrity Test Before Proceeding Beyond 5% Rated Power Project stage: Approval ML19319D4591977-01-12012 January 1977 Requests Details of RCS Flow Indication Mod & Installation Completion Schedule.Failure in Common Pressure Sensing Line Could Cause Reactor Operation Outside Acceptable Tech Spec Limits Project stage: Other ML19317G4551977-02-17017 February 1977 Responds to Requesting RCS Flow Indication Mod to Meet Single Failure Criterion.Requests Meeting W/Nrc & B&W Licensees to Discuss Mod.Addl 60 Days Requested to Evaluate Potential Solutions Project stage: Meeting ML19329D6481977-03-22022 March 1977 Responds to Granting Util Until 770417 to Submit RCS Design Mods.Meeting W/B&W Licensees Scheduled for 770330-31 to Discuss RCS Mods Project stage: Meeting 05000312/LER-1978-018-03, /03L-0:on 781221,while Increasing Power After Second Refueling Outage,Rcs Flow Indicator a Unusually Steady & Spurious Alarms Received.Caused by Operator Error. Transmitter Returned to Svc & Operator Instructed1979-01-15015 January 1979 /03L-0:on 781221,while Increasing Power After Second Refueling Outage,Rcs Flow Indicator a Unusually Steady & Spurious Alarms Received.Caused by Operator Error. Transmitter Returned to Svc & Operator Instructed Project stage: Other 05000312/LER-1978-018, Forwards LER 78-018/03L-01979-01-15015 January 1979 Forwards LER 78-018/03L-0 Project stage: Other ML20040A6711979-01-25025 January 1979 Discusses Div of Operating Reactors & Div of Safety Sys Review of Instrument Piping on Reactor Coolant Flow Transmitter Reactor Protection Sys.Min of Two Sys Should Be Required Per Loop.Ser Section7.0 Encl Project stage: Approval ML19273B3981979-03-12012 March 1979 Concludes That Installation of Redundant Set of Sensing Lines for Each Reactor Coolant Loop Would Be Satisfactory Mod to Reactor Coolant Flow Sensing Sys,For Single Failure Considerations.Requests Util Response Project stage: Other ML19263D3261979-03-21021 March 1979 In Response to Requesting Info Re Installation of Redundant Flow Sensing Lines During 790423 Refueling Outage, Advises That Details Will Be Submitted by 790330 Project stage: Other 1977-03-22
[Table View] |
Text
,
4 00O O
O 8
0 oo Oo 2
400 W. P. STEWART, DIR ECTOR gf POWER PRODUCTION coaeoaavin=
March 21, 1979 Mr. Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72
Dear Mr. Reid:
In your letter of March 12, 1979, you identified a satisfactory modification to the CR #3 RC flow sensing system that would satisfy Condition 2.C.(7) of the CR #3 Operating License.
As per your March 12th request, this letter is to inform you that Florida Power Corporation intends to install a redundant set of flow sensing lines at Crystal River Unit 3.
This modification will be made during the upcoming refueling outage beginning April 23, 1979.
The specific details concerring this modification will be submitted for your review and approval on or before March 30, 1979.
Very truly yours, FLORIDA POWER CORPORATj0N W.P. Stewart WPSemhWO4 D6 cc:
File:
3-0-3-a-3 790327046 General Office 32o1 Thirty-fourth Street South e P O Box 14042, St. Petersburg Fionda 33733 e 813-866-5151
~
STATE OF FLORIDA COUNTY OF PINELLAS W.P. Stewart states that he is the Director, Power Production, of Florida Power Corporation; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information and belief.
I 1
O. '.br AOrb W. P.
Ste' wart Subscribed and sworn to before me, a Nota y Public in and for the t
State and Co nty above named, this 21st day of March, 1979.
/
/
{ ALchn
'<I-1, t
Notary Public
/