ML19326B264
| ML19326B264 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/29/1976 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19326B243 | List: |
| References | |
| NUDOCS 8003120825 | |
| Download: ML19326B264 (1) | |
Text
- --
i.
d,#
- b 4
UNITED STATES C,
[
'1 NUCLEAR REGULATORY COMMISSIOh
$,.g f)/ f.S REGloN 11 4
230 PEACHT A F:" $TR EET, N. W.
S' ':TC
- t t Y, ;g, [ [
as ATLAf4T A. GEORGI A 30 3G.,
April 29, 1976 J-1 K. V. Seyfrit, Reactor Technical Assistant Branch, Office of Inspection and Enforcement, Headquarters a,d % THRU: Norman C. Moseley, Director, Office of Inspection and Enforcement,
,/ V U Region II i
FLORIDA POWER CORPORATION, CRYSTAL RIVER 3 (DN 50-302), CONTAINMENT DOME SEPARATION - REQUEST FOR TRANSFER OF LEAD RESPONSIBILITY FPC has discovered a separation of the concrete of the containment dome.
(Morning report April 19, 1976) The utility is currently investigating the extent of damage and evaluating methods for repairing the structure.
3 i
Enclosed is a copy of the preliminary notification issued by Region II on April 19, 1976, and the preliminary 50.55e report from FPC, dated April 21, 1976.
It is requested that lead responsibility for review and acceptance of the repair method be transferred to Licensing.
1 Y C kpn fv l
F. J. Long, Chief
)
Reactor Operations and Nuclear c'
l Support Branch
Enclosures:
'1.
Preliminary Notification 2.
FPC letter to NRC dated i
April 21, 1976 I
cc:
F. Jape, IE:II i
C. E. Murphy, IE:II H. D. Thornburg, IE:HQ I
1
{
1 j
8008120 h [
.. ~.
9 --
nm
.,.,1,
..,..n,.-n..
.