ML19326B253

From kanterella
Jump to navigation Jump to search
Forwards Amended Pages to Interim Rept Re Reactor Bldg Dome Delamination in Response to 760730 Request
ML19326B253
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/16/1976
From: Rodgers J
FLORIDA POWER CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML19326B243 List:
References
NUDOCS 8003120792
Download: ML19326B253 (4)


Text

o r

e

  • n O) k'
  • ? '

)..yJ's

, ' i))f.

^

)

y*,

E&#

(

'\\

(

) i ' ',

.);

s?[:,_l.y__, l

/4e%p

\\

' i) y Florida Pow co

  • o er a-August 16, 1976 Y

U y

g#,

Fir. John F. Stol, Chief

~$

f Light Water Reactors Branch No. 1 C

Y-Division of Project >fanagement

~

T>

f U.S. Nuclear Regulatory Commission c

f Washington, D.C. 20555 N '/ig V2 Re:

Florida Power Corporation Crystal River Unit No. 3 Docket No. 50-302

[

Dear >fr. Stol:

As you suggested.in your July 30 letter on the subject of our interim report, " Reactor Building Dome Delamination" - June 11, p) 1976, we are today filing amended pages (40 copies, plus 1 (s'

original) for insertion / replacement as appropriate.

On August 10, 1976, we tn.J cur Supplement No. 1 to this re-port containing your formal questions and our response to each.

The pages transmitted herewith and Supplement No.

1, when properly placed in the original June 11, 1976 report, provides you with a single document which reflects our present repair scheme as implemented.

It is our intent to continue to amend this report ts the re-pair program develops so as to have a single source document conveying to you the results of this program.

Please advise if this is not satisf:ictory.

Very truly yours, b

J.

Rodger Asst. Vice President JTR/iw Cop Enclosures.

pSgg

/

'\\

cc:

Str. Norman Stoseley, Director

/0 l ()

Region II ISE bN Atlanta, GA

,=; ~c 8oos1go 79g hn i

General Office 3:oi rn.rty curin sir.i soum. P O Sc.14042. St Petersouro. Porca 33733 8 3-d66 5151

l i

~,

l 1

Sheet 1 of 3 CRYSTAL RIVER UNIT No. 3 C

REACTOR BUILDING DOME DELAMINATICU REPORT i

DATED JUNE 11, 1976 e

DOCKET No. 50-302 1

REVISION INSTRUCTION CUIDE 1

The following listed pages of this report are to be deleted, anc where appropriate, revised pages dated 8-10-76 should be inserted:

1 I

f REMOVE PAGES INSERT PAGES y

Dome repair schedule which Dome repair schedule follows cover letter following cover letter i

Table of Contents Table of Contents, pages 1, j

(2 sheets) 11, & 111 j

List of Tables, page iv List of Figures, pages v thru xi 1-1 1-1 1-la 2-2 2-2 2-3 2-3 2-3a 2-6 2-6 2-6a 2-7 2-7 j

2-9 2-9 3-1 3-1 j

3-2 3-2 3-2a 3-2b 3-5 3-5 3-6 3-6 3-9 3-9 3 3-11 j

3-18a 3-18b 3-18e 3-24 3-24 Revised:

8-10-76

..g Sheet 2 of 3 l

v

-l REVISION INSTRUCTION GUIDE (Cont'd)

REMOVE PAGES INSERT PAGES 4-1 4-1 4-2 4-2 4-4 4-4 4-4a 4-5 4-5 4-Sa 4-7 4-7 5-1 thru 5-7 5-1 thru 5-3 Figure 2-2 Figure 2-2 Figure 2-16 Figure 2-16 Figure 2-17 Figure 2-17 Figure 2-20 Figure 2-20 Figure 2-22 Figure 2-22 p.

Figure 2-28 Figure 2-28 Figure 2-29 Figure 2-29 Figure 2-30 Figure 2-30 Figure 2-32 Figure 2-32

)

y Figure 3-10A Figure 3-10B Figure 3-10C sheet 1 of 2 Figure 3-10C sheet 2 of 2 Figure 3-10D Figure 3-10E Figure 3-10F Figure 3-10G Figure 3-10H Figure 3-15 Figure 3-15 Figure 3-16 Figure 3-16 Figure 3-22 Figure 3-22 Figure 3-46 Figure 3-46 Figure 4-1 Figure 4-1 Figure 4-2 Figure 4-2 Figure 4-3 Figure 4-3 Figure 4-4 Figure 4-4 Figure 4-6 Figure 4-6 Figure 4-8 Figure 4-8 Figure 4-9 Figure 4-9 Figure 4-10 Figure 4-10 Figure 4-12 Figure 4-12 Figure 4-14 Figure 4-14 Figure 4-15 Figure 4-15 Figure 4-16 Figure 4-16

)

Figure 4-18 Figure 4-18 d

Figure 4-20 Figure 4-20 Figure 4-27 Figure 4-27 Revised:

S-10-76

g Sheet 3 of 3 REVISION INSTRUCTION GUIDE (Cont'd)

REMOVE PAGES INSERT PAGES Figure 5-1 Figure 5-1 4

Figure 5-2 Figure 5-2 Figure 5-3 Figure 5-3 Figure 5-4 Figure 5-4 Figure 5-5 Figure 5-5 Figure 5-6 Figure 5-6 rigure 5-7 Figure 5-7 Figure 5-8 Figure 5-8 Figure 5-9 Figure 5-9 Figure 5-10 Figure 5-10 Figure 5-10A Figu.e 5-10B Figure 5-11 Figure 5-11 Figure 5-12 Figure 5-12 Figure 5-13 Figure 5-13 f.

Figure 5-14 Figure 5-14 Figure 5-14A Figure 5-15 Figure 5-15 Figure 5-18 Figure 5-18 Figure 5-19 Figure 5-19 Figure 5-20 Figure 5-20 Appendices Appendices C-1 C-1 C-3 C-3 C'

C-4 C-7 C-7 s

C-7a C-16 C-16 C-17 C-18 C-19 C-20 Supplement 1 (S-1 thru S-13 plus attachments total 25 sheets)

O Revised:

8-10-76

. -. - -