ML19326B249

From kanterella
Jump to navigation Jump to search
Forwards Revised Suppl 2 to Util 761014 Interim Deficiency Rept Re Reactor Bldg Dome Delamination in Response to Structural Engineering Branch Request for Addl Info
ML19326B249
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/28/1976
From: Rodgers J
FLORIDA POWER CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML19326B243 List:
References
11007, NUDOCS 8003120769
Download: ML19326B249 (1)


Text

-

nU am on

<JNM,.A.

    1. c ns

[

'x-Florida October 28, 1976 o

J Mr. John Stol:

O' gp' EO 7 Branch Chief 2

Light Water Reactors Branch I i u,%*y,

6 f,

Division of Project Management

%, 'N%

U.S. Nuclear Regulatory Commission o

4 g

Washington, D.C. 20555 g

g 8

Subject:

Crystal River Unit #3 Docket No. 50-302

Dear Mr. Stol:

On October 14, 1976 we filed Supplement No. 2 to our interim-report, " Reactor Building Dome Delamination - June 11, 1976."

,O This Supplement No. 2 provided you with our response to Struc-

!,j tural Engineering Branch (NRC) request for additional information transmitted to us on September 30, 1976.

Since October 14, 1976, we have reviewed this Supplement No. 2 and have located an assembly problem plus several typographical errors, which may cause some confusion among those reviewing the submittal.

In order to correct this problem, we are sub-mitting forty copies of a corrected version of Supplement No. 2 to our interim report.

Please insert this corrected Supplement into your copies of the report document in place of our October 14 version.

Very truly yours, J.

. Rodgers Asst. Vic President JTR/iw Enclosures.

(*opv SMNT REGION '

cc:

Mr. Norman C. Mosely y

11 t. e a,nn7 Director, Region II IEE Atlanta, Georgia

/mT

(

/

w/

80031207N General Office 3201 in,rty.tourtn street sourn. P O Bon 14042.3: Pe:ersburg. Ronda 33732 3'3 -866 5151