..........I December 10, 1976 Mr. John Stolz Branch Chief k[
i i
Light Water Reactors Branch I g IG g I,
Division of Project Management es i
U.S.
Nuclear Regulatory Commission Q
ga, J
a Washington, D.C.
20555 s
Subject:
Crystal River Unit #3 Docket No. 50-302
Dear Mr. Stolz:
We are today supplying you with our final submittal of pages to be incorporated in our interim report Reactor Building Dome Delamination - June 11, 1976.
N I
These pages when properly inserted in the original report will provide you with a single document which will after placement become our final report on the dome delamination.
In addition, we are furnishing a new cover insert to replace the original, so as to more positively identify this document as the Final Report - Reactor Building Dome Delamination -
December 10, 1976.
j With this submittal, you have in your possession the required
" final report regarding the repairs to the containment dome" called for on page 22-1, section 22 - Conclusions of the SER Supplement #2.
Very truly yours, J.8. Rodgers T
Asst. Vice President JTR/iw Attachment cc:
Mr. Norman C.
Moseley, Director w/Att.
Region II, I&C Atlanta, GA l
I, i
ps.:,3
~
00 12Q
't General Office 320s ininy founn street soum. P O Box 14042. St. Petersburg, Flenca 33733 813-866-5151
4 SHEET 1 0F 3 O
Ns FINAL REVISIONS TO THE CRYSTAL RIVER UNIT NO. 3 REACTOR BUILDING DOME DELAMINATION REPORT DATED JUNE 11, 1976 DOCKET No. 50-302 REVISION INSTRUCTION GUIDE The following listed pages of this report are to be deleted; and where appropriate, revised pages dated 12-10-76 should be inserted REMOVE PAGES INSERT PAGES Front Cover & Spine Front Cover & Spine (dated 12-10-76)
Dome Repair Schedule
- l Table of: Contents Pages:
Table of Contents Pages:
1!
1
)
11 11 11(a) ii(a) fii 111 iv iv v
v
,vii(a) vii(a)
,viii viii v111(a) lix ix xi xi l-1 1-1 i
-la 1-2 3-2a 3-2a 3-3 3-3 3-4 3-4 l
3-5 3-5 3-Sa 3-6 3-6 3-6a i
3-6b 317 3-7 3-8 3-8 3-8a
- Dome Repair Schedule is replaced with Figure 5-25 Dome Repair Sequence.
~ _.. _ - - _ __
f SHEET 2 0F 3
-l REVISION INSTRUCTION GUIDE (Cont'd)
' REMOVE PAGES INSERT PAGES 4
1i 3-9 3-9 i
3-10' 3-10 i
3-10a 3-11 3-11 3-18e 3-18e i
3-23 3-23 3-24 3-24 4-1 4-1 i
4-2 4-2 l
4-3 4-3 4-4 4-4 I
I 4-5 4-5 i
i 4-6 4-6
.^
4-7 4-7
)
4-8 4-8 5-1 5-1 j
5-1 5-2 5-3 5-1 1
5-4 5-4 1
5-5 5-5 5-Sa i
5-6 5-6 6-1 6-1 7-1 7-1 Figures:
Figures:
i
~
3-17 3-17 i
i 3-18 3-18 3-19 3-19 i
l 3-27A 3-27B 3-27C 3-27D 3-27E 5-22 5-22 4
5-25 j
5-26 i
l l
l l
.. _.__ u _._._. _. _. _ - _ _. _ _ _ _. _ _ _ _ _. -..... _. _ _ _ _, _ _ - - - - - _ - _... _ - _ _ _ _ _ _. _... _ _ _ _. _
SHEET 3 0F 3
- e s
REVISION INSTRUCTION GUIDE (Cont'd) i REMOVE PAGES INSERT PAGES i
Appendices Aopendices Appendix C/ (Flysheet)
Appendix C (Flysheet)
/
Appendix K (Flysheet) e i
/
K-1
/
K-2
/
Suppl' aments Supplements
/
S71 S-1 5-8 S-8 Attachment for answer to Attachment for answer to ge sciun 3.3(6) question 3.3(6)
S pplement 2, Page 4 Supplement 2, Page 4 Supplement 2, Page 7 Supplement 2, Page 7 Supplement 2, Page 8 Supplement 2, Page 8 l
j J
5 i
1 s
i l
. -.,....... -.. -.