Forwards Pages to Be Incorporated Into Util 760611 Interim Rept Re Reactor Bldg Dome Delamination & Cover Sheet for Related Util 761210 Final Rept
ML19326B248
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/10/1976
From: Rodgers J
FLORIDA POWER CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML19326B243 List:
References
NUDOCS 8003120767
Download: ML19326B248 (4)


Text

1 b1 s

4

  • Q s

9 3

een

..........I December 10, 1976 Mr. John Stolz Branch Chief k[

i i

Light Water Reactors Branch I g IG g I,

Division of Project Management es i

U.S.

Nuclear Regulatory Commission Q

ga, J

a Washington, D.C.

20555 s

Subject:

Crystal River Unit #3 Docket No. 50-302

Dear Mr. Stolz:

We are today supplying you with our final submittal of pages to be incorporated in our interim report Reactor Building Dome Delamination - June 11, 1976.

N I

These pages when properly inserted in the original report will provide you with a single document which will after placement become our final report on the dome delamination.

In addition, we are furnishing a new cover insert to replace the original, so as to more positively identify this document as the Final Report - Reactor Building Dome Delamination -

December 10, 1976.

j With this submittal, you have in your possession the required

" final report regarding the repairs to the containment dome" called for on page 22-1, section 22 - Conclusions of the SER Supplement #2.

Very truly yours, J.8. Rodgers T

Asst. Vice President JTR/iw Attachment cc:

Mr. Norman C.

Moseley, Director w/Att.

Region II, I&C Atlanta, GA l

I, i

ps.:,3

~

00 12Q

't General Office 320s ininy founn street soum. P O Box 14042. St. Petersburg, Flenca 33733 813-866-5151

4 SHEET 1 0F 3 O

Ns FINAL REVISIONS TO THE CRYSTAL RIVER UNIT NO. 3 REACTOR BUILDING DOME DELAMINATION REPORT DATED JUNE 11, 1976 DOCKET No. 50-302 REVISION INSTRUCTION GUIDE The following listed pages of this report are to be deleted; and where appropriate, revised pages dated 12-10-76 should be inserted REMOVE PAGES INSERT PAGES Front Cover & Spine Front Cover & Spine (dated 12-10-76)

Dome Repair Schedule

  • l Table of: Contents Pages:

Table of Contents Pages:

1!

1

)

11 11 11(a) ii(a) fii 111 iv iv v

v

,vii(a) vii(a)

,viii viii v111(a) lix ix xi xi l-1 1-1 i

-la 1-2 3-2a 3-2a 3-3 3-3 3-4 3-4 l

3-5 3-5 3-Sa 3-6 3-6 3-6a i

3-6b 317 3-7 3-8 3-8 3-8a

  • Dome Repair Schedule is replaced with Figure 5-25 Dome Repair Sequence.

~ _.. _ - - _ __

f SHEET 2 0F 3

-l REVISION INSTRUCTION GUIDE (Cont'd)

' REMOVE PAGES INSERT PAGES 4

1i 3-9 3-9 i

3-10' 3-10 i

3-10a 3-11 3-11 3-18e 3-18e i

3-23 3-23 3-24 3-24 4-1 4-1 i

4-2 4-2 l

4-3 4-3 4-4 4-4 I

I 4-5 4-5 i

i 4-6 4-6

.^

4-7 4-7

)

4-8 4-8 5-1 5-1 j

5-1 5-2 5-3 5-1 1

5-4 5-4 1

5-5 5-5 5-Sa i

5-6 5-6 6-1 6-1 7-1 7-1 Figures:

Figures:

i

~

3-17 3-17 i

i 3-18 3-18 3-19 3-19 i

l 3-27A 3-27B 3-27C 3-27D 3-27E 5-22 5-22 4

5-25 j

5-26 i

l l

l l

.. _.__ u _._._. _. _. _ - _ _. _ _ _ _. _ _ _ _ _. -..... _. _ _ _ _, _ _ - - - - - _ - _... _ - _ _ _ _ _ _. _... _ _ _ _. _

SHEET 3 0F 3

e s

REVISION INSTRUCTION GUIDE (Cont'd) i REMOVE PAGES INSERT PAGES i

Appendices Aopendices Appendix C/ (Flysheet)

Appendix C (Flysheet)

/

Appendix K (Flysheet) e i

/

K-1

/

K-2

/

Suppl' aments Supplements

/

S71 S-1 5-8 S-8 Attachment for answer to Attachment for answer to ge sciun 3.3(6) question 3.3(6)

S pplement 2, Page 4 Supplement 2, Page 4 Supplement 2, Page 7 Supplement 2, Page 7 Supplement 2, Page 8 Supplement 2, Page 8 l

j J

5 i

1 s

i l

. -.,....... -.. -.