ML19326B246
| ML19326B246 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/29/1976 |
| From: | Sihweil I Office of Nuclear Reactor Regulation |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19326B243 | List: |
| References | |
| NUDOCS 8003120759 | |
| Download: ML19326B246 (1) | |
Text
^
pn Rtov UNITED STATES h, ?
,...UCLEAR REGULATORY COMMISSION
-D) y g( i g wAsHiNoToN. o. c.20sss 0
Docket No. 50-302 MEMORANDUM FOR:
J. Stolz, Chief, Light Water Reactors Branch #1, Division of Project Management FROM:
I. Sihweil, Chief, Structural Engineering Branch, Division of Systems Safety
SUBJECT:
. CRYSTAL RIVER UNIT NO. 3 - SER SUPPLEMENT (SEB:1104)
REFERENCES:
1.
Reactor Building Dome Delamination Interim Report dated June 11, 1976 2.
Supplement ;io.1 to Reference No.1, dated August 10, 1976 -
3.
Supplement No. 2 to Reference No.1, dated Oct. 28, 1976 4.
Structural Integrity Test Preliminary Report, dated November 4, 1976 The Structural Engineering Branch has reviewed and evaluated the infonnation as provided by the applicant in the references listed above.
Our evaluation of the repaired containment structure is contained in the enclosure as a supplement to Safety Evaluation Report. The evaluation was made by C. P. Tan of Section B, with the assistance of A. Gluckmann.
I. Sihweil, Chief Structural Engineering Branch Division of Systems Safety
Enclosure:
As Stated cc w/o enc 1:
R. Boyd W. Mcdonald cc w/ enc 1:
R. Heineman A. Gluckmann J. Knight C. Tan p
L. Engle V) r vK. Seyfrit R. Shacaker K. Kapur q
- r. chan 8003120 /
.