05000325/LER-1979-041-01, /01T-0 on 790525:certain Nylon Insulation Sleeve Portions of Compression Type Termination Lugs Did Not Meet Environ Qualification Tests.Each Drywell Termination Will Be Checked for Deterioration & Safety Assurance

From kanterella
(Redirected from ML19289F650)
Jump to navigation Jump to search
/01T-0 on 790525:certain Nylon Insulation Sleeve Portions of Compression Type Termination Lugs Did Not Meet Environ Qualification Tests.Each Drywell Termination Will Be Checked for Deterioration & Safety Assurance
ML19289F650
Person / Time
Site: Brunswick 
Issue date: 06/08/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19289F648 List:
References
LER-79-041-01T, LER-79-41-1T, NUDOCS 7906150241
Download: ML19289F650 (2)


LER-1979-041, /01T-0 on 790525:certain Nylon Insulation Sleeve Portions of Compression Type Termination Lugs Did Not Meet Environ Qualification Tests.Each Drywell Termination Will Be Checked for Deterioration & Safety Assurance
Event date:
Report date:
3251979041R01 - NRC Website

text

W11)

~ '

LICENSEE EVENT REPORT toni n ot. o tOCK: l l

l l_Lj @

WLEASE FRINT OR iYPE At L REQUIRED INFORMATION) 1 6

0 lg[4 1l1l1l1lgl lg lo l N.

C l B l E l P l 1 lgy 0 d 0 l 0 l 0 l 0 l 0 0

i 8 9 LICEN5EE CODE 14 15 LICENSE NUMBf H 25 26 UCENiE T YPE 30 51 CAT 58 CON'T sgoRT lX gl0l5l0l-g 3l2l5 g 0l5l2l5[7l9 g 0 6 l 0l 8l 7 l 9 l@

O i

8 60 61 DOC" F T NUUB ER s,a 67 EVENT DATE

/,1 M

RE POR T DAT E 80 EVENT DESCRIPTION AND PROBABt.E COT 5EQUENCES O'o IDuring the review of environmental qualification of electrical equipment for Unit Nos.

g lo 2

l1 and 2 as required by IE Bulletin 79-01, it was found that certain nylon insulating g

o 3

pleeve portions of the compression-type termination lugs, manufactured by AMP Special j

,n gIndustries, did not pass the environmental qualification test.

The lug in question is ;

n 3

o r,

LAMP Type PIDG for use with sizes 10 through 12 wiring.

l Technical Specifications 6.9.1.8.1.

[

[o 7

io a l l

8 9 80 SYSTE'1 CAtWF FM GE Ur.' 9 VAtVE CODE Cotw timD]DE C DYPONEN T CODE D m N5' SUBCODE io o

i II E[g {BJg [ Aj@ lX lX X lX lX lXJ@ {Q ]Q 8

9 10 11 17 13 l 'i

'J 20 er GUE N TI AL OCCUHPi*~

HEFCHT REv8SION L E R. RO EVENT YE AR h EPOi:T NO.

CODE T Y Pf-N O.

@ Rtgjgr l7 l91 L---J l0 l4 1l fl 0 l1]

[TJ g

l0 [

_ 21 22 73 74 26 21 78 Tr i'

J1 32 ACT ion FUTURE FFFECT s r!f tWN ATT ACHVENT UDD 1

' H i w r.O Y P.

CO".'PO*.F 'J T TAKEN AC TION ON PL ANT YErm;D HOURS SUBMI TT E D r

SbFPLICH MANLFAC REH X ggg lhZlg gg l0l0l0 l Y [ g

'ivrt.t;t.{Ig;glA g lA 3l 2g 33 34 li 3/

40 43 42 43 44 41 CAUSE DESCRIPTION AND CORRECTf W AcIlONS h l1 o lAn evaluation has been made of the possible problems which could result from the fail-l fure of the insulating sleeve.

It was assumed that a total _aeterioration of the sleeve I i

i i ii2I lhad taken place.

Therfore, the termination lugs were considered to be completely un. I ii 3

l insulated, which defines the worst condition. Even in an uninsulated condition, l

[ problems can only occur if the lugs were free to rotate underneath the terminal (cont.)]

i 4

1 8 9 80 F ACIll TY YE THOD CF STATUS

'6 POWER

'PICH'TATUS DISCOVi nY IWU n H / DEschtPTION 32

_15)) IC lh l 0 0lhl

_ NA l

lDl@l Vendor Notification l

0 ACTIVITY CD T f.N T RELEASED OF RE LE ASE AMOU' r -

"r1r 'rV I- 'A?h 7 OF RELEASE

@ (,Zj@

NA l

l NA l

6 8 9

'J 11 44 4'3 go

'E RSONNE L E X POSURES NU*.*R F H T Y F f*

Of SCl41 P I W \\"f ll 10 10 0 l@Lzj@l 7

NA l

unSONNd'ImunS N U'.tB E R

DESCRIPTION

10 10 0l@l NA l

i a

8 9 11 12 80 LOSS of OH DAMAGE TO F ACILIT Y TYPE D E SC HIP TION b h!

8 9 10 l

NA 9

go hl 790615094l isSUEt

)E SC RIP TION ll_[}:?

NA

__ _ __J llllll l

0 8 9 in w a 80 ;,

E N AVE OF PREP AH F H __ A. C. Tol.lisonrb P e' n

( 919 L457-6101

d LER CONTINUATION -- RO# 1-79-41 Facility: BSEP Unit No. 1 Event Date: 5/25/79 screws far enough to cause contact between adjacent lugs, rotation is not expected in the seismically qualified terminations used at Brunswick.

As an interim measure, each of the drywell terminations using the AMP sleeve is being inspected for deterioration of the existing sleeve; this inspection will also ensure that the wire is properly aligned to the terminal block cnd that the termination screw is tight. These actions provide assurance for the nearterm that plant operation may continue without undo risk to the public health and safety.

At the next refueling outage for each unit, we will implement a permanent solution to the problem. There are several possible permanent insulation devices which will be evaluated in the interim.

During the refueling outage, one of these solutions, or a combination of them, will be used to ef fect a permanent, fully qualified solution.

2229 342