ML19274E254

From kanterella
Jump to navigation Jump to search
Request for Information IR 05000397/2019-405 Material Control and Accounting Inspection
ML19274E254
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/09/2019
From: Natasha Greene
Division of Nuclear Materials Safety IV
To: Wynegar R
Energy Northwest
N. Greene
References
IR 2019405
Download: ML19274E254 (3)


See also: IR 05000397/2019405

Text

Greene, Natasha

From: Greene, Natasha

Sent: Monday, September 9, 2019 4:28 PM

To: Wynegar, Richard

Cc: Carson, Louis; O'Donnell, John; Baca, Bernadette; Kolcum, Gregory; Merker, Lindsay;

Hammon-Karl, Tracy; Hedges, Tony L.

Subject: CGS Wishlist - 5678 and MCA!

Attachments: CGS2019004 2RS5678 Wishl ist.pdf; CGS2019405 71 130-11 (MCA) Wlshlist.pdf

FYI - If you received this before, there have been corrections.

Hello!

Please see the attached document req uest list (i.e., wishlist) for the upcoming radiation safety inspection

scheduled for November 4 through 8, 2019 at your site. Currently, the inspectors scheduled for this

inspection are Natasha Greene, Louis Carson, John O'Donnell, and Bernadette Baca. I am the inspection

team lead for the Public Radiation Safety inspection. The inspection will focus on Inspection Procedures (IP)

71124.05, 71124.06, 71 124.07, and 71124.08. All requested documents should be uploaded on or before

October 15, 2019.

In addition, during this period, we will perform an inspection under the Security cornerstone via IP 71130.11 for

MC&A, where Louis Carson will lead. All requested documents should be uploaded on or before October 15,

2019.

If there are any questions and/or concerns regarding these requests, please feel free to contact me

directly. When available, please inform me of the scheduled Entrance/Exit meeting time and location. We

currently expect to conduct an Entrance on Monday, late afternoon, and an Exit early on Friday morning. Also,

please inform me of any required docs/actions needed to acquire/maintain site access for the scheduled

inspectors. Thank you!

NOTE:

The information requested for an in-office review may be provided in either electronic or paper media or a

combination of these. Information provided in electronic media may be in the form of uploads to an online

secured document management service, e-mail attachments, or CD. The agency's text editing software is MS

Word; however, we have document viewing capability for Adobe Acrobat (.pdf) text files. Information

requested to be reviewed onsite during the inspection week should be paper media.

P.S. If you are not the correct contact for this inspection, please pass it on to the appropriate staff member and

'CC' me. I request in advance that these documents remain accessible for a period of at least 30 days post the

Exit meeting date.

P.S. The noted inspectors are subject to change and you will be notified accordingly, if needed.

Natasha A. Greene, PhD

Senior J{ea{tfi Pfiysicist

RIV/DNMS/RIB

l',((R_( cJlj'V}f.(')1]4 Cliairman ML19274E254

1

The following items are requested for the

Material Control & Accounting rnspection

at Columbia

Dates of Inspection: 11/04/2019 to 11/08/2019

Integrated Report; 2019-405

Material Contror and ~ccounting (MC&A) (71130.11)

NOTE:_ In an effort to keep the requested infonnation organized, please submit this

information to us using the same fettering system below. For example, all contacts and

phone numbers for the above inspector should be in a fire/folder titled 11-A, Applicable

organization charts in fire/folder 11-B, etc.

Please provide the requested information on or before Tuesday, October 15, 2019.

If you have any questions or comments, please contact Louis Carson at 817-200-1221 or via e-

mail at Louis.Carson@nrc.gov.

NOTE=

The information requested for an in-office review may be provided in either electronic or paper

media or a combination of these. Information provided in electronic media may be in the form of

a secured document management system, e-mail attachments, or CD. The agency's text

editing software is MS Word; however, we have document viewing capability for Adobe Acrobat

(.pdf) text files. Information requested to be reviewed on-site during the inspection week

should be paper media.

Date of Last Inspection: * February 29, 2016

A. Organization Charts with MC&A functions; personnel responsible for SNM, fuel and non-

fuel and their phone numbers

B. All MC&A and MC&A related procedures, including:

  • Overall control of SNM
  • Movement of Fuel
  • Reconstitution of Fuel
  • Physical Inventory
  • Oversight of Contractors
  • Movement of Non-Fuel SNM

C. Most recent Spent Fuel Pool Map including containers and rods/rod pieces locations,

and locations of non-fuel SNM. *

D. Records of the physical inventories since the date of the last inspection.

E. SNM-MC&A Audits, Assessment, & Corrective Actions Documents since the date of the

last inspection.

F. Records of loading and physical inventory of any ISFSls since the date of the last

inspection.

G. All reconstitution and fuel failure records, including final disposition of the orphaned rods

and rod pieces since the date of the last inspection.

During the inspection, we will need access to the Spent Fuel Pool including the bridge, fuel

handling equipment and personnel, and cameras to visually verify a selection of assemblies in

each spent fuel pool by serial number. Also, we want to visually verify all orphaned rods and

pieces that are in the spent fuel pool in the locations specified in the records. This can be done

viewing a video of the inventory if serial numbers of assemblies can be seen and proper pool

location identified.