ML19260C348

From kanterella
Jump to navigation Jump to search

Forwards Constr Installation & Testing Schedule Re Physical Protection Sys.Schedule Withheld (Ref 10CFR2.790)
ML19260C348
Person / Time
Site: Rancho Seco
Issue date: 12/14/1979
From: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
TAC-43702, NUDOCS 7912260230
Download: ML19260C348 (1)


Text

'$SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S street. Box 15830. Sacramento, California 95813; (916) 452-3211 December 14, 1979 D. G. Eisenhut, Acting Director Division of Operating Reactors Office of Nuclear Reactor Regulation U. S. Nuclear Regulatoi;' Commission Washington, D. C.

20555

Dear Mr. Eisenhut:

Per Mr. Victor Stello's request in a letter dated October 5, 1978, we are advising you of our construction, installation and testing schedule with respect to our physical protection system.

Attached with this letter is an updated 1979-1980 Engineering and Construction Schedule (Plant Security Modifications) dated December 14, 1979.

It is requested that as a minimum, this schedule be with-held from public disclosure pursuant to Section 9.5(a)(4) of 10CFR9 and Section 2.790(d) of 10 CFR Part 2.

Sincerely yours, A

J. J. Mattimoe Assistant General Manager and Chief Engineer Attachment cc:

NRC Region V (w/ attachment) 1617 070 N\\

\\

  1. D12260 1 AN ELECTRIC SV3 TEM 3 E 1/l N G MORE THAN 600,000 IN THE HEART JF O A LI F 3 R N A