ML19305C254

From kanterella
Jump to navigation Jump to search

Forwards Updated 1979-1980 Engineering & Const Schedule Re Physical Protection Sys Per Stello 781005 Request.Encl Withheld (Ref 10CFR2.790)
ML19305C254
Person / Time
Site: Rancho Seco, 07901980
Issue date: 03/19/1980
From: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
TAC-43702, NUDOCS 8003260410
Download: ML19305C254 (1)


Text

m l

JCMUD v

SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 s street, Box 15830 sacramento, California 95813; (916) 452 3211 March 19, 1980 D. G. Eisenhut, Acting Director Division of Operating Reactors Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission Washington, D. C.

20555

Dear Mr. Eisenhut:

Per Mr. Victor Stello's request in a letter dated October 5,1978, we are advising you of our construction, installation and testing schedule with respect to our physical protection system.

Attached with this letter is an updated 1979-1980 Engineering and Construction Schedule (Plant Security Modifications) dated March 14, 1980.

It is requested that as a minimum, this schedule be with-held from public disclosure pursuant to Section 9.5(a)(4) of 10CFR9 and Section 2.790(d) of 10 CFR Part 2.

Sincerely yours, b: &W J. J. Mattimoe Assistant General Manager and Chief Engineer Attachment cc:

NRC Region V (w/ attachment)

\\

TO CFI? 2.79; f.ver~r m

_cmpt ft:m p'a,;: c, n._.

F e 'g g g g g g. '+c ~ ;I o' i tN ELE;;;ic st37: 9 5 E 9. ! N i vatt T 4 4 '. i)': :

.N Tat