ML19259C283

From kanterella
Jump to navigation Jump to search
LER 79-032/03L-0 on 790514:while Performing Penetrant Test 10.1.1a,reactor Core Isolation Cooling Component Test,Ie 51-FO45 Steam Supply Did Not Work.Caused by Motor Burning Up for Unknown Reason
ML19259C283
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/12/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19259C278 List:
References
LER-79-032-03L-01, LER-79-32-3L-1, NUDOCS 7906140533
Download: ML19259C283 (2)


Text

$1 116 LICENSEE EVENT REPORT CONTROL BLOCK: l I

l l l l l lh e

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) o i N lC lB E P 'l1 14l@l150 l 0 l - l 0 lLICENSE l 0 l 0 l - 0 l 026@l264 l 1LICEN5E 0 l 0NUMBEH ] 1 l TYPE 1 l 1l@l l

$7 CAT 68 l@

7 8 9 LICENSEE " ODE JO CON'T 0 1 S$Ry lL l@l0 l5 l0 l- l0 l3 2 l5 @l M 069 l 5 lEVENT 1 l DATE 4 l 7 l 9 l@l0 l 6 REPORT 74 75 1 l2 l7 l980l@

DATE 7 8 feu 61 DOCKET NUMB E R EVENT DESCRIPTION AND P.'OBABLE CONSEQUENCES h o 2 While performing P 10.1. la, RCIC Component Test,1E 51-F045, steam supply to o 3 l RCIC, would not optrate. This makes the RCIC system inoperable. I o 4 l o s l Technical Specification 3.7.4, 6.9.1.9b l 1016 l l l o 7 j 0 8  !

7 8 9 80 SYSTE M CAUSE CAUSE C O*? P. VALVE CODE CODE SUBCODE COMPONENT CODE SU8 CODE SU8 CODE 7

o 9 8

[C El@ W@

9 10 11 12 A l @ l V l A l L. l V l 0 l P l@ 19[B l@

13 1B Z

20 l@

'EQUE NTI AL OCCURHENCE REPORT REVISION LE R 'RO EVENT YE AR HEPOR T NO. CODE TYPE NO.

h gP l7l9l l-l l0 l3 l2 l l/l l 0l 3l l Ll (--J 32 0l

_ 21 22 23 24 26 27 28 29 30 31 AKE A O O PLANT 1 T HOURS S 8 iT D FO U8. U PLI MANUFACTURER WgW@

33 34 W@ lZl@

35 30 3/

0l 0l 0j 0l 40 lN l@

41 lY 42 l@ lN @

43 44 L

Z l0 l047l@

CAUSE DESCRIPTION AND CORREC rlVE ACTIONS i o l The motor was found to have burned up for no known reason. The motor was sent out I i i [ to be rewound. The valve and operator were inspected for mechanical defects. with I none found. When the motor was returned and installed, it was found to have its l

, 3 l brush shunt leads shorted to the case. The motor was again sent out for repair, j

,, , , , ; An Engineering Work Request has been submitted to investigate recently obtained (cont'd) 1 8 9 80 ST S  % POWER O THE R ST A TUS ISCO RY DISCOVERY DESCRIPTION 1115 l Wh 0 l 9 l 8 l@l NA l l B lgl Periodic test [

ACTIVITY CON TENT RELE SED OF RELE ASE AMOUNT OF 71VITY LOCATION OF RELEASE NA l1 l6 l l 7 8 9 lh l2 10 11 44 l l 4s 80 l

PERSONNEL E XPOSURES NUMBEH l t l 7 l l 0] 0 l 0 l@lZ TYPE l @l DESCRIPTION NA l PERSONNE L INJUI IES eESCR,PTieNh ltlal

~U_ e 0l0 l0 l@l NA 2279 288 l 8 9 11 12 80 LOSS OF OR DAMAGE TO F ACillTY TYPE DE SC hip ilON NA 7

9 8 9 lZ l@l10 80 l

ISSUE ESCHiPTION

  • RTl8LN_

7 9 hl 10 NA l f8 69 lllllllllll l}

80 5 NAME OF PREPARER A. C. Tollison, Jr. pgoye 919-457-6701 _ E,

LER CONTINUATION - Ro# 1-79-32 Facility: BSEP Unit #1 Event Date May 14, 1979 vendor information on motor-operator performance. Procedures are being developed to give motors a more thorough receipt inspection prior to use or storage. The motor was returned, installed, and the valve returned to normal service.

2279 289 9