ML19254D695

From kanterella
Jump to navigation Jump to search
LER 79-079/01T-0:on 791010,pipe Support Associated W/Emergency Svc Water Sys B Was Considered Inoperable Per Tech Specs.Cause Not Stated.Existing Support Was Upgraded
ML19254D695
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/23/1979
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19254D691 List:
References
LER-79-079-01T, LER-79-79-1T, NUDOCS 7910290348
Download: ML19254D695 (2)


Text

- - ' n es gr.pyg LICENSEE EVENT REPORT CONTROL BLOCK: l 1

l l l l l lh 6

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 7 o i 8

l9 N lLICENSEE Y l JCOOE l A l F l 1 lgl 0 l 0 l- LICENSE le 15 l 0 l0NUM8EHl 0 l 0 l- l0 l0 l 0 gl4 l1 l1 l1 lI lgl 25 26 LICENSE TYPE JO l

57 CAT 58 gg CON'T goj,l 7 8 R

,EPOy l L gl 0 l 5 l 0 l 0 60 61 0 l 3 l 3 l 3 gl 1 l 0 l 1 l0l7l9 gjll0;2l3j7l9 g DOCKET NUMBER 68 63 74 75 EVENT DATE REPOR T DATE 80 EVE'NT DESCRIPTION AND PROBABLE CONSEQUENCES h O 2 i Please See Attachment EI ~

l Io l41 l l O s I '

I O 6 l l

0 7 1 l

0 a l l 7 8 9 80 C DE CODE SU8CO E COMPONENT CODE SUSC O'E SU E 7

O 9 8

lW l Bl@ l]@ l C l@ lS lU lP l0 lR [T lg 9 10 il 12 13 18 19 g 20 g

_ SEQUE NTI A L OCCURRENCE REPORT REVISION LEA RO EVENT YEAR R EPORT NO. CODE TYPE

@ yu aE g l7l9l l-l l0l7l9l l/l l0 1 lTl [_j l N .l

_ 21 22 23 24 26 27 28 M 30 31 32 KEN A T ON ON PL ANT 1 TH HOURS 22 SB IT D FORP b S. SUP IER MANUFACTURER l33Fl@l34Z l@ l Z lg 35 [6Zl@

3 l0l0l0l 31 40 l gg 43

{g 42 43 g 44 Sl4l2lOJ( 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS lil0l l Please See Attachment  ;

li fil l i Ii12I I 11 131 l I l i l41 l l 7 8 9 80 SYA S  % POWER OTHE R STATUS DIS O RY DISCOVERY DESCRIPTION l1 l5 l l E l@ d l7" lhl" NA l l" D l@l A-E l

ACTIVITY COSTENT "

RELEASED OF RELE ASE AMOUNT OF ACTIVITY LOCATION OF RELEASE NA NA l1l6l8 [Z_]

7 9 @ l10Zl@ l 13 44 l l 45 l

PERSONNEL EXPOSURES 80 NUMBER TYPE DESCRIPTION lil7j l0l0l0l@lZl@l A l

' ' ' ,ERt M 'l~2u' RIES '

NUMeER oES: R,PTiON@

lilallololol@l 7 8 9 11 12 NA 80 l

' " ^ "' '

'fvi'E ESC 7iPAO~ '' " @

l i l 91 l Z l@l10 NA j yL3 338 7 8 9 l

80 DESCRIPTION

  • NA 2 O ISSUE @l l lllllllllll l-7 8 3 10 68 69 80 NAME OF PREPARER N' v0IUO bbIIdS PHONE.

3I5-342-3840 ,

~ 7 910 2 9 03y p

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333 ATTACHMENT TO LER 79-079/0lT-0 Page 1 of 1 During normal operation on October 10, 1979, as a result of the pipe stress re-analysis being conducted by the Architect Engineer, the plant staff was notified that a pipe support associated with the "B" Emergency Service Water System was considered inoperable in accordance with the requirements of the August 14, 1979 letter lif ting the Show Cause Order of March 13, 1979 and Technical Specifications Appendix A, Paragraph 3. ll .D.2. Specifically, support H15-7 was considered in-operable as set forth in the August 14, 1979 l e t te r.

Based on preliminary load information received September 28, 1979, the exist-ing support was upgraded. Since final loads are less than or equal to the pre-liminary loads, the support, as modified, is fully acceptable and the system is currently operable.

Modification was completed prior to receipt of the final loads therefore no surveillance testing of redundant components was required by Technical Specifica-tions and the event did not represent any significant hazard to the public health and safety.

1223 339