IR 05000458/2019410

From kanterella
(Redirected from ML19228A142)
Jump to navigation Jump to search
NRC Security Inspection Report 05000458/2019410
ML19228A142
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/15/2019
From: Ray Kellar
Plant Support Branch-1
To: Vercelli S
Entergy Operations
References
IR 2019410
Download: ML19228A142 (3)


Text

ust 15, 2019

SUBJECT:

RIVER BEND STATION - NRC SECURITY INSPECTION REPORT 05000458/2019410

Dear Mr. Vercelli:

On July 2, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your River Bend Station. On June 14, 2019, the NRC inspectors discussed the results of the Access Control inspection with Mr. Scott Kent and other members of your staff. On July 2, 2019, the NRC inspectors discussed the results of the Review of Target Set inspection with Mr.

Keith Crissman, Senior Manager, Projects and Maintenance Support. The results of this inspection are documented in the enclosed report.

The NRC inspectors documented two findings of very low security significance (Green) in this report. The two findings involved violations of NRC requirements. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at the River Bend Station.

One cross-cutting aspect was assigned to a finding in the area of Human Performance, Avoid Complacency, [H.12]. If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at the River Bend Station. This letter will be available electronically for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Ray L. Kellar P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-458 License No. NPF-47 Enclosure:

Inspection Report 05000458/2019410 cc: Mr. Todd Kauffman Manager Security Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775 ML19227A354 Entire Report: ML19227A354 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: NRC-002 By: JLarsen Yes No Publicly Available Sensitive MD 3.4, A.3 Cover Letter Only: ML19228A142 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: JLarsen Yes No Publicly Available Sensitive OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:DRP C:PSB1 NAME JLarsen RLanfear JGroom CYoung RKellar SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/

DATE 08/01/2019 08/01/19 8/02/19 08/14/19 08/15/19