|
---|
Category:Letter
MONTHYEARML23180A1512023-06-29029 June 2023 LLC, Request for Exemption to the Reporting Requirements of 10 CFR 50.46(a)(3) ML21102A3072021-04-15015 April 2021 OEDO-21-00155 - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC, Small Modular Reactor ML21050A4312021-02-19019 February 2021 LLC - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC Small Modular Reactor ML20247J5642020-09-11011 September 2020 Standard Design Approval for the NuScale Power Plant Based on the NuScale 600 Standard Plant Design Certification Application ML20231A8042020-08-28028 August 2020 Final Safety Evaluation Report for the NuScale Standard Plant Design ML20224A4602020-08-25025 August 2020 OEDO-20-00292-Response to the Advisory Committee on Reactor Safeguards Letter on NuScale Power, LLC, Report on the Safety Aspects of the NuScale Small Modular Reactor ML20231A5982020-08-25025 August 2020 OEDO-20-00285_NuScale Area of Focus - Boron Redistribution ML20210M8902020-07-29029 July 2020 Area of Focus - Boron Redistribution ML20195A5872020-07-13013 July 2020 LLC - Submittal of Draft Operator Licensing and Examination Standard for NuScale Small Modular Reactors ML20195C7662020-07-13013 July 2020 LLC Request for Standard Design Approval Based on the NuScale Standard Plant Design Certification Application ML20192A3262020-07-10010 July 2020 LLC, Submittal of Environmental Report: Revision Status ML20198M3932020-07-0202 July 2020 LLC Submittal of Revised Packing Slip for Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1, Dated June 19, 2020 ML20174A3472020-07-0101 July 2020 OEDO-20-00220 - Area of Focus - Probabilistic Risk Assessment and Emergency Core Cooling System Valve Performance ML20184A2872020-07-0101 July 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and General Design Criterion 33, PM-0720-70785, Revision 0 ML20181A4322020-06-22022 June 2020 Final SER for NuScale TR-0516-49416 NON-Loss-of-Coolant Analysis Model, Rev 3 (Letter) ML20181A2702020-06-22022 June 2020 Final SER for NuScale TR-0516-49422 Loss-of-Coolant Analysis Model, Rev 2 (Letter) ML20198M3922020-06-19019 June 2020 LLC - Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1 ML20171A7312020-06-19019 June 2020 LLC, Submittal of Riser Flow Hole Methodology and Associated Changes to Final Safety Analysis Report Incorporating Its Use ML20157A2232020-06-0303 June 2020 Letter to NuScale Requesting -A for TR-0716-50350 ML20150C5172020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled NRC Public Meeting Presentation: Boron Redistribution and Associated Design and DCA Changes, PM-0620-70336, Revision 0 ML20150E1772020-05-29029 May 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Extended Dhrs Operation and RCS Boron Redistribution (Closed Session), PM-0620-70243, Revision 0 ML20150C8812020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and Associated Design and DCA Changes, PM-0620-70244, Revision 0 ML20149M1192020-05-28028 May 2020 LLC Summary of Impacts to Erai 8930 Response and Discussion on the Exemption from General Design Criterion 33 ML20141L8082020-05-20020 May 2020 LLC Submittal of Containment Response Analysis Methodology Technical Report, TR-0516-49084, Revision 3 ML20141N0122020-05-20020 May 2020 LLC Submittal of Changes to Final Safety Analysis Report, Section 6.2, Containment Systems, Section 6.3, Emergency Core Cooling System, and Technical Report TR-0516-49084, Containment Response Analysis Methodology Technical Report ML20141M7642020-05-20020 May 2020 LLC Submittal of Nuclear Steam Supply System Advanced Sensor Technical Report, TR-0316-22048, Revision 3 ML20141L7872020-05-20020 May 2020 LLC, Submittal of Second Updates to Standard Plant Design Certification Application, Revision 4 ML20141L8162020-05-20020 May 2020 LLC, Submittal of Long-Term Cooling Methodology, TR-0916-51299, Revision 3 ML20141M1142020-05-20020 May 2020 LLC Submittal of NuScale Instrument Setpoint Methodology Technical Report, TR-0616-49121, Revision 3 ML20141L8042020-05-20020 May 2020 LLC Submittal of Technical Specifications Regulatory Conformance and Development, TR-1116-52011, Revision 4 ML20128J3162020-05-18018 May 2020 OEDO-20-00167 - Response to the ACRS Letter on Combustible Gas Monitoring ML20133K0882020-05-12012 May 2020 LLC, Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution (Closed Session), PM-0420-69512, Revision 0 ML20133J9142020-05-11011 May 2020 LLC Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0420-69511, Revision 0 ML20112F4552020-05-0101 May 2020 LLC, Design Certification Application Phases 5 and 6 Review Status ML20107F8492020-05-0101 May 2020 OEDO-2000140 - NuScale Area of Focus - Helical Tube Steam Generator Design ML20104A0792020-04-27027 April 2020 OEDO-20-00115 - Safety Evaluation Report for Topical Report TR-0516-49416, Revision 2, Non-Loss-of-Coolant Accident Analysis Methodology ML20099H0802020-04-0808 April 2020 LLC - Submittal of Presentation Materials Entitled NRC Public Meeting: Revisions to Nuscale'S EPZ Sizing Methodology Topical Report, PM-0420-69598, Revision 0 ML20098G2372020-04-0707 April 2020 Nuscale Power, LLC Submittal of Remaining Closure Items for the Emergency Core Cooling System Valve Failure Mode Effects Analysis Audit Items ML20097F1922020-04-0606 April 2020 Nuscale Power, LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: Nuscale Topic - Hydrogen/Oxygen Monitoring, PM-0420-69518, Revision 0 ML20094H6742020-04-0303 April 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation NuScale Topic-Probabilistic Risk Assessment with a Focus on Emergency Core Cooling System Analysis PM-0420-69559, Revision 0 ML20092L8992020-04-0101 April 2020 LLC - Submittal of Updates to Standard Plant Design Certification Application, Revision 4 ML20072M6682020-03-30030 March 2020 Response to NuScale Letter Dated February 24, 2020, on Planned SDA Application Content ML20072H3332020-03-0909 March 2020 LLC - Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0320-69218, Revision 0 ML20057D9002020-03-0606 March 2020 Submittal of Errata to Final SE for NuScale Power, LLC TR-1010-859-NP-A, Quality Assurance Program Description for the NuScale Power Plant ML20062F7262020-03-0505 March 2020 Request for Withholding Information from Public Disclosure for Nuscale Power, LLC Letter Public ML20069A1572020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Rod Ejection Accident Methodology, PM-0320-69146, Revision 0 ML20069A1772020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Non-Loss-of-Coolant Accident, PM-0320-69141, Revision 0 ML20069A9632020-03-0404 March 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report, Loss-of-Coolant Accident Evaluation Model, PM-0320-69138, Revision 0 ML20066G2802020-03-0303 March 2020 LLC, Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale Topic - Hydrogen Monitoring, PM-0220-69071, Revision 0 ML20066G2882020-02-28028 February 2020 LLC Submittal of Presentation Materials Titled ACRS Full Committee Presentation: NuScale - Steam Generator Design (Closed Session), PM-0220-69053, Revision 0 2023-06-29
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRAIO-0420-69855, LLC, Submittal of Corrected Response to NRC Request for Additional Information No. 284 (Erai No. 9225) on the NuScale Design Certification2020-04-30030 April 2020 LLC, Submittal of Corrected Response to NRC Request for Additional Information No. 284 (Erai No. 9225) on the NuScale Design Certification ML19332A1202019-11-27027 November 2019 LLC Supplemental Response to NRC Request for Additional Information No. 484 (Erai No. 8930) on the NuScale Design Certification Application ML19304B4712019-10-31031 October 2019 LLC Supplemental Response to NRC Request for Additional Information No. 466 (Erai No. 9482) on the NuScale Design Certification Application ML19296D8052019-10-23023 October 2019 LLC Response to NRC Request for Additional Information No. 526 (Erai No. 9719) on the NuScale Design Certification Application ML19283E5302019-10-10010 October 2019 LLC Supplemental Response to NRC Request for Additional Information No. 522 (Erai No. 9681) on the NuScale Design Certification Application ML19260G7352019-10-0707 October 2019 Summary of Public Meeting with NuScale to Discuss Response to RAI 9681 ML19266A5872019-09-23023 September 2019 LLC Supplemental Response to NRC Request for Additional Information No. 518 (Erai No. 9659) on the NuScale Design Certification Application ML19262G9742019-09-19019 September 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Tier 1, Section 3.11, Reactor Building and Section 3.13, Control Building, and Tier 2, Section 3.8.4, Design of Category I Structure and Section 14.3, Certified ... ML19262G5762019-09-19019 September 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Section 14.2, Initial Plant Test Program, Table 14.2-2, Pool Cleanup Systems Test #2, and Table 14.2-50, Module Assembly Equipment Test #50 ML19259B8102019-09-16016 September 2019 LLC Supplemental Response to NRC Request for Additional Information No. 205 (Erai No. 9044) on the NuScale Design Certification Application ML19259A0922019-09-16016 September 2019 LLC Response to NRC Request for Additional Information No. 525 (Erai No. 9705) on the NuScale Design Certification Application ML19238A3722019-08-26026 August 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19238A3662019-08-23023 August 2019 LLC - Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19215A0032019-08-0202 August 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on the NuScale Design Certification Application ML19215A0062019-08-0202 August 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 441 (Erai No. 9485) on the NuScale Design Certification Application ML19212A7622019-07-31031 July 2019 LLC Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19212A3752019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 483 (Erai No. 9516) on the NuScale Design Certification Application ML19212A7992019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application ML19212A6892019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 205 (Erai No. 9044) on the NuScale Design Certification Application ML19210D1592019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 401 (Erai No. 9447) on the NuScale Design Certification Application ML19210D7342019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 520 (Erai No. 9642) on the NuScale Design Certification Application ML19210E1462019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19207B3812019-07-26026 July 2019 LLC - Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application ML19207A5342019-07-26026 July 2019 LLC - Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19207B8522019-07-25025 July 2019 LLC Response to NRC Request for Additional Information No. 194 (Erai No. 8884) on the NuScale Design Certification Application ML19203A3152019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 325 (Erai No. 9268) on the NuScale Design Certification Application ML19203A3212019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 333 (Erai No. 9282) on the NuScale Design Certification Application ML19203A3092019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 54 (Erai No. 8837) on the NuScale Design Certification Application ML19203A3422019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 154 (Erai No. 8938) on the NuScale Design Certification Application ML19200A2482019-07-19019 July 2019 LLC Response to NRC Request for Additional Information No. 522 (Erai No. 9681) on the NuScale Design Certification Application ML19200A2082019-07-19019 July 2019 LLC - Response to NRC Request for Additional Information No. 524 (Erai No. 9691) on the NuScale Design Certification Application ML19199A1172019-07-18018 July 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 484 (Erai No. 8930) on the NuScale Design Certification Application ML19198A3252019-07-17017 July 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 249 (Erai No. 9135) on the NuScale Design Certification Application ML19196A3682019-07-15015 July 2019 LLC Response to NRC Request for Additional Information No. 516 (Erai No. 9647) on the NuScale Design Certification Application ML19191A2202019-07-10010 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19184A6152019-07-0303 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 386 (Erai No. 9316) on the NuScale Design Certification Application ML19176A5802019-06-25025 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19170A3702019-06-19019 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19168A2442019-06-17017 June 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 325 (Erai No. 9268) on the NuScale Design Certification Application ML19164A1452019-06-13013 June 2019 LLC - Submittal of Containment Response Analysis Methodology Technical Report, TR-0516 -49 08 4, Revision 1 ML19157A3262019-06-0606 June 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19154A6222019-06-0303 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on the NuScale Design Certification Application ML19154A6052019-06-0303 June 2019 LLC Response to NRC Request for Additional Information No. 514 (Erai No. 9645) on the NuScale Design Certification Application ML19151A8372019-05-31031 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 377 (Erai No. 9380) on the NuScale Design Certification Application ML19140A4592019-05-20020 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 401 (Erai No. 9447) on the NuScale Design Certification Application ML19137A2902019-05-17017 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 156 (Erai No. 9031) on the NuScale Design Certification Application ML19137A2872019-05-15015 May 2019 LLC Response to NRC Request for Additional Information No. 519 (Erai No. 9656) on the NuScale Design Certification Application ML19126A2942019-05-0606 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 26 (Erai No. 8840) on the NuScale Design Certification Application ML19122A5092019-05-0202 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 494 (Erai No. 9548)on the Design Certification Application ML19121A6002019-05-0101 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on Design Certification Application 2020-04-30
[Table view] |
Text
RAIO-0219-64549 February 14, 2019 Docket No.52-048 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738
SUBJECT:
NuScale Power, LLC Supplemental Response to NRC Request for Additional Information No. 228 (eRAI No. 9034) on the NuScale Design Certification Application
REFERENCES:
- 1. U.S. Nuclear Regulatory Commission, "Request for Additional Information No. 228 (eRAI No. 9034)," dated September 14, 2017
- 2. NuScale Power, LLC Response to NRC "Request for Additional Information No. 228 (eRAI No.9034)," dated November 13, 2017
- 3. NuScale Power, LLC Supplemental Response to "NRC Request for Additional Information No. 228 (eRAI No. 9034)" dated March 20, 2019 The purpose of this letter is to provide the NuScale Power, LLC (NuScale) supplemental response to the referenced NRC Request for Additional Information (RAI).
The Enclosure to this letter contains NuScale's supplemental response to the following RAI Question from NRC eRAI No. 9034:
16-30 This letter and the enclosed response make no new regulatory commitments and no revisions to any existing regulatory commitments.
If you have any questions on this response, please contact Carrie Fosaaen at 541-452-7126 or at cfosaaen@nuscalepower.com.
Sincerely, Zackary W. Rad Director, Regulatory Affairs NuScale Power, LLC Distribution: Gregory Cranston, NRC, OWFN-8H12 Samuel Lee, NRC, OWFN-8H12 Getachew Tesfaye, NRC, OWFN-8H12 : NuScale Supplemental Response to NRC Request for Additional Information eRAI No. 9034 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com
RAIO-0219-64549 :
NuScale Supplemental Response to NRC Request for Additional Information eRAI No. 9034 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com
Response to Request for Additional Information Docket No.52-048 eRAI No.: 9034 Date of RAI Issue: 09/14/2017 NRC Question No.: 16-30 Paragraph (a)(11) of 10 CFR 52.47 and paragraph (a)(30) of 10 CFR 52.79 state that a design certification (DC) applicant and a combined license (COL) applicant, respectively, are to propose technical specifications (TS) prepared in accordance with 10 CFR 50.36 and 50.36a.
10 CFR 50.36 sets forth requirements for TS to be included as part of the operating license for a nuclear power facility. The model standard technical specifications (STS) in the following documents provide NRC guidance on format and content of TS as acceptable means to meet 10 CFR 50.36 requirements. These documents may be accessed using the Agencywide Documents Access and Management Systems (ADAMS) by their accession numbers.
NUREG-1431, STS Westinghouse Plants, Revision 4 (ADAMS Accession Nos. ML12100A222 and ML12100A228)
NUREG-1432, STS Combustion Engineering Plants, Revision 4 (ADAMS Accession Nos. ML12102A165 and ML12102A169)
NUREG-2194, STS Westinghouse Advanced Passive 1000 (AP1000) Plants, Revision 0 (ADAMS Accession No. ML16111A132)
The NRC staff needs to evaluate technical differences in the proposed generic TS (GTS) from applicable provisions in these documents, which are referenced by the DC applicant in Design Control Document (DCD) Tier 2, Section 16.1, and the docketed rationale for each difference because conformance to STS provisions is used in the safety review as the initial point of guidance for evaluating the adequacy of the GTS to ensure adequate protection of public health and safety, and the completeness and accuracy of the GTS Bases.
NuScale Nonproprietary
Acronyms used in this comment are as follows:
LCO Limiting Condition for Operation SDM SHUTDOWN MARGIN COLR CORE OPERATING LIMITS REPORT CRAs control rod assemblies CVCS Chemical and Volume Control System CFDS Containment Flood and Drain System SFCP Surveillance Frequency Control Program SR Surveillance Requirement The following background information is provided to support the staffs questions, which are stated afterwards.
The LCO and Applicability statements of proposed Subsection 3.1.1 are:
LCO 3.1.1 SDM shall be within the limits specified in the COLR.
APPLICABILITY: MODE 1 with keff < 1.0, MODES 2, 3, and 4.
The definition of MODE 4 (Transition) in Table 1.1-1 requires (with staff recommended edits in blue) that keff be < 0.95, and by Footnote (b), that All control rod assemblies (CRAs) are incapable of withdrawal, The CVCS and CFDS connections to the MODULE are isolated, and One or more reactor vent valves are de-energized; and by Footnote (c), that All reactor vessel flange bolts are fully tensioned.
NuScale Nonproprietary
SR 3.1.1.1 states (with staff recommended edits in blue):
SR 3.1.1.1 --------------------------NOTE---------------------------
Not required to be performed in MODE 4.
Verify SDM to be within the limits specified in [ 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the COLR.
OR In accordance with the Surveillance Frequency Control Program ]
The SR section of the Bases for Subsection 3.1.1, concerning SR 3.1.1.1, states, In MODE 1 with keff < 1.0, and in MODES 2, 3, and 4, the SDM is verified by performing a reactivity balance calculation, considering the listed reactivity effects:
- a. RCS boron concentration;
- b. CRA position;
- c. RCS average temperature;
- d. Fuel burnup based on gross thermal energy generation;
- e. Xenon concentration;
- f. Samarium concentration; and
- g. Isothermal Temperature Coefficient (ITC).
The SR section of the Bases for Subsection 3.1.1 also states, SR 3.1.1.1 is modified by a Note that allows entry into MODE 4 prior to performing the SR.
NuScale Nonproprietary
GTS Section 1.4 provides no example that matches the Note for SR 3.1.1.1. The most similar example is Example 1.4-3, which has a Note that modifies the 7 day Frequency of peformance by stating:
NOTE--------------------------------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after 25% RTP.
This example states, in part
... Should the 7 day interval be exceeded while operation is < 25% RTP, this Note allows 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after power reaches 25% RTP to perform the Surveillance....
End of Background Information
- a. The staff is unable to determine whether SR 3.1.1.1 can be performed in MODE 4 (following entry from MODE 3) if the performance requires measurements of the boron concentration and temperature of the reactor coolant in the reactor vessel, since connections to the plant sampling system (PSS) presumably would be isolated.
- 1. If such measurements in MODE 4 are not necessary to perform the SDM calculation, then the calculation would need to rely on such data obtained in MODE 3, and also on an assurance that, after entry into MODE 4 until entry into MODE 5, core reactivity changes (due to changes in reactor coolant temperature, and the Xenon and Samarium distributions in the core) would not violate the MODE 4 criterion that keff be maintained < 0.95. The applicant is requested to explain how the MODE 3 boron concentration is adjusted to provide such assurance.
NuScale Nonproprietary
NuScale Response:
Supplemental Question Clarification Provided by the NRC Staff Question 16-30, Sub-question a1, the staff requested that the applicant explain how SDM limits of LCO 3.1.1 would be ensured when an NPM is being moved in the reactor pool in Mode 4, during which no neutron monitoring of the core is provided, and sampling of the reactor coolant to verify boric acid concentration is within limits to satisfy SR 3.1.1.1 is not possible. Based on the applicants response (ML17317B552), the staff understands that entry into Mode 4 will require the unit operating staff to verify by calculations and supporting analyses that the boron concentration will remain adequate to assure that reactivity stays within limits. Implementation will be by plant procedures prepared by the COL holder. The response also revised the Bases for the surveillance column Note (Not required to be performed in MODE 4.) for SR 3.1.1.1 (Verify SDM to be within limits specified in the COLR.) to clarify that (1) the SDM shall remain within limits during MODE 4 operations; (2) the reactivity calculations in the SDM verification must account for MODE 4 conditions, and (3) SR 3.0.4 requires verifying that SDM will be met in MODE 4 before entry from MODE 5, as well as before entry from MODE 3.
The staff believes the last sentence of the revised passage of the SR 3.1.1.1 Bases would be clearer with the following suggested edits, indicated by mark up:
Therefore reactivity calculations performed to verify the SDM conservatively account for passive phenomena, that may occur such as temperature changes and Xenon decay, affectsthat could may occur and affect reactivity during the MODE 4 conditions.
With the assurance that sufficient SDM is established in the reactor vessel to prevent criticality in MODE 4, prior to entry into MODE 4 from MODE 3 and also from MODE 5, and the statement in FSAR 12.3.4.1 that the area radiation monitors in the reactor building pool area satisfy 10 CFR 50.68 (b)(6), which provides assurance that abnormal radiation during module movement in the pool can be detected, the staff concludes that the proposed changes to the Bases for SR 3.1.1.1 are acceptable, provided (1) the above clarifying edits are incorporated in the Bases for SR 3.1.1.1, (2) that after filling the containment vessel using the CFDS in MODE 3 in preparation for entering MODE 4, the containment vessel water boric acid concentration will be verified by sampling (in consideration of the potential communication of reactor coolant and borated water in the containment vessel through the open RRVs), and (3) the initial response to Sub-question 16-30.a1 is revised to be consistent with the above described staff interpretation of the response. Pending resolution of these requested clarifications, Sub-question 16-30.a1 is being tracked as an open item.
NuScale Nonproprietary
In a November 6, 2018, public meeting conference call with NuScale, the applicant stated it will provide a supplemental response to 16-30a1 to address the above issues and will include response to RAI xxx-9634, Sub-question 9, concerning proposed definition of SDM.
NuScale Supplemental Response In addition to the information provided here, see the response to RAI 16-60-9 provided on January 29, 2019 by NuScale letter RAIO-0119-64281 (ML19029B572).
The bases of LCO 3.1.1.1 were modified as requested in the clarification of the RAI, item (1).
With regard to item (2), in MODE 3 when preparing to enter MODE 4, the inventory of the containment is that from, and shared with reactor coolant system (RCS) via the reactor vent valves and the reactor recirculation valves. Any additions to the containment inventory will be from the ultimate heat sink (UHS) using the core flood and drain system (CFDS).
RCS boron concentration is a closely tracked parameter throughout operations in MODES 1, 2, and 3. The boron concentration in the UHS is periodically surveilled in accordance with SR 3.5.3.3 to assure it is within the limits specified in the COLR.
Entry into MODE 4 is subject to the requirements of section 3.0 of the technical specifications and transitioning from MODE 3 to MODE 4 requires by definition that the reactivity condition (keff) be less than 0.95, and that as addressed in the response to (1) above, the reactivity condition be assured to remain less than 0.95.
Plant procedures will be developed by a COL applicant as required by COL Item 13.5-1. Those procedures will include activities required to be performed to transition between MODES of operation. Sampling of the containment contents or alternative means of assuring the reactivity condition will remain within limits will by necessity be addressed by those procedures.
With regard to item (3), RAI responses are not maintained and revised to update their contents.
RAI represent an exchange of information between the staff and the applicant. Supplementary and subsequent RAI and responses are used to address changes to the previously supplied response.
The responses to this question are provided in this submittal and the response to RAI 16-60-9 provided on January 29, 2019 by NuScale letter RAIO-0119-64281 (ML19029B572) modify and supersede that provided in the original response. No further actions are planned.
NuScale Nonproprietary
Impact on DCA:
The Technical Specifications have been been revised as described in the response above and as shown in the markup provided in this response.
NuScale Nonproprietary
SDM B 3.1.1 BASES SURVEILLANCE SR 3.1.1.1 REQUIREMENTS In MODE 1 with keff 1.0, SDM is verified by observing that the requirements of LCO 3.1.5 and LCO 3.1.6 are met. In the event that a CRA is known to be untrippable, however, SDM verification must account for the worth of the untrippable CRA as well as another CRA of maximum worth.
In MODE 1 with keff < 1.0, and in MODES 2, 3, and 4, the SDM is verified by performing a reactivity balance calculation, considering the listed reactivity effects:
- a. RCS boron concentration;
- b. CRA position;
- c. RCS average temperature;
- d. Fuel burnup based on gross thermal energy generation;
- e. Xenon concentration;
- f. Samarium concentration; and
- g. Isothermal Temperature Coefficient (ITC).
Using the ITC accounts for Doppler reactivity in this calculation because the reactor is subcritical and the fuel temperature will be changing at the same rate as the RCS.
SR 3.1.1.1 is modified by a Note that indicates the surveillance is not required to be performed in MODE 4. In MODE 4 Table 1.1-1, MODES requires the module to be isolated from control systems and process lines that could change the SDM. Verification that the SDM will be met in MODE 4 is required before entry from MODE 5, and before entry from MODE 3 in accordance with SR 3.0.4.
During module movement instrumentation is not available to measure variables that could affect the SDM. Therefore reactivity calculations performed to verify the SDM conservatively account for passive phenomena that may occur such as temperature changes and Xenon decay, effects that couldmay occur and affect reactivity during the MODE 4 conditions.
The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.
NuScale B 3.1.1-4 Draft Revision 3.0