LER 1976-036-00 Re Failure of C-D Diesel Generator to Start on Two Successive Attempts During Surveillance Test
ML18219C332
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/17/1976
From: Jurgensen R
Indiana Michigan Power Co
To: James Keppler
NRC/RGN-III
References
LER 1976-036-00
Download: ML18219C332 (8)


Text

U.S. NUCLEAR REGULATORY Co v 'SION DOCKET NUMBER NRC FORM 195

{2.7G) 50-315 FILE NUMBER NFIC DISTRIBUTION FOR PART 50 DOCKET MATERIAL INCXDENT REPORT FROM: DATE OF DOCUMENT Indiana 6 Michigan Power Company 9/17/76 Mr. J. G. Keppler Bridgman,'Michigan DATE RECEIVED R. W. Jurgensen 9/28/76 RELETTER ONOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED sfoRIGINAL $ (fUNC LASS IF IE D One signed co>.'>

OCOP Y DESCRIPTION ENCLOSURE Ltr. trans the. following: Licensee Event Report (RO 50-315/76-36) on 8/19/76 concerning the C-D diesel generator failing to start on two successive attempts AM~~'IIV A MDDU'ED while in mode 1 at 100% powei, during a surveillance test.

5 Ml KtS)N (1-P) (2-P) 4 PLANT NAME: NOTE: IF PERSONNEL EXPOSURE IS INVOLVED SEND DIRECTLY TO KREGER/J..COLLINS Cook Unit 02 FOR ACTION/INFORMATION 9 29 76 BRANCH CHIEF- Kniel W CYS FOR ACTION LIC..ASST.: Lee W / S ACRS CYS 9%6$ 3%8 S v INTERNAL DISTRIBUTION PDR MIPC SCHROEDER IPPOLITO HOUSTON NOVAK CHECK GRIMES CASE HJTLER HANAUER TEDESCO MACCARY EISENHUT SHAO VOLLIKR BUNCH KREGER J. COLLINS C'XTERNAL LPDR: St. Jose h MX.

DISTRIBUTION CONTROL NUI'v1BER TIC:

NS NRC FORM 19G I2.7G)

PP c.

A

~ =.

0 Mmemen .)I leatrla ~ ~

D N Ei' 8 N PDNER CO (p' .--.

y EC'Ei<~ O DONALD C. COOK NUCLEAR W T P.O. Box 456, Bridgman, Michiga 49106 f-~ 8"7 Huaca aECNATokr

~ g 9 September 17, 1976 i j~,,

'I 't I' ~0~

t>@wan Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement (

United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 Docket No. 50-315

Dear Mr. Keppler:

Pursuant to the requirements of Appendix A Technical Specifications and the United States Nuclear Regulatory Commission Regulatory Guide 1. 16, Revision 4, Section 2.b, the following report is submitted:

RO 50-315/76-36.

Sincerely, C

R.l . Jur ns Plant ag

/bab cc: R.S. Hunter J.E. Dolan G.E. Lien R. Kilburn R.J. Vollen BPI R.C. Callen MPSC K.R. Baker RO: III P.W. Steketee, Esq.

R. Walsh, Esq.

G. Charnoff, Esq.

G. Olson J.M. Hennigan PNSRC R.S. Keith'ir.,

IE (30 copies)

Dir., MIPC (3 copies)

f Vgt E

r.

4 -,l~VM V

It, gf r~' (M

(

LICENSEE EVENT REPORT CONTROL BLOCK: fPL 6 PRINT ALL REQLIIREO INFORMATION) 1

'ICENSEE LICENSE EVENT NAME LICENSE NUMBER TYPE TYPE I D C C 1 0 0 0 0 0 0 0 0 0 4 1 1 1 1 0 3

~

7 89 14 15 25 26 30 31 32 CATEGORY REPORT TYPE REPORT SOURCE DOCKET NUMBER 0 0 8 EVENT DATE 'EPORT 0 9 1 DATE 7 7 6

[QD1] GQN'7 I ~Q 0 5 0 3 1 5 1 9 7 6 7 8 57 58 59 60 61 68 69 74 75 80 EVENT DESCRIPTION QP2 WHILE IN MODE 1 AT 100% POWER, DURING A SURVEILLANCE TEST THE C-D DIESEL GENERATOR 7 8 9 80

~Q3 FAILED TO START ON TWO SUCCESSIVE ATTEMPTS. AN EMERGENCY JOB ORDER WAS INITIATED 7 89 80

~04 NOTING THAT THE EXCITER INVERTER HAD NO OUTP . P 7 8 9 80 foal GENERATOR WAS VERIFIED BY PERFORMING SURVEILLANCE RE UIREMENT 4.8.1.1.2a.5 AS RE UIRED 7 8 9 80 top6] BY TECHNICAL SPECIFICATION 3.8.1.1, ACTION 'EE SUPPLEMENT ( RO-50-315/76- 36 7 8 9 PRME

~ 80 SYSTEM CAUSE COMPONENT COMPONENT -

  • COMPONENT CODE SUPPUER MANUFACTURER

~e CODE CODE

[oO~j E G E N E R :L S 2 5 0 Y 7 8 9 10 11 12 17 43 44 47 48 CAUSE DESCRIPTION

~08 AN IMMEDIATE INVESTIGATION REVEALED: 1 THE IS 7 8 9 80

[OO~]

7 8 9 80

~10 WERE SHUT. THIS RESULTED IN THE DIESEL STOPPING AFTER A 10 SECOND RUN SEE SUPPLEMENT 7 8 9 80 FACIUTY METHOD OF STATUS II POWER OTHER STATUS DISCOVERY DISCOVERY DESCRIPTION Q~g E ~10 0 NA C SURVEILLANCE TEST 7 8 9 10 12 13 44 45 46 80 FORM OF ACTIVITY COATENT RELEASED OF RELEASE, AMOUNT OF ACTIVITY LOCATION OF RELEASE

[gg z z NA

. 7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION

~is ~00 0 2 NA 80 7 89 11 12 13 PERSONNEL INJURIES NUMBER DESCRIPTION 7

~14 89'1~)JJJ PROBMLE CONSEQUENCES 12 N

80 Qg NA 80 7 8 9 LOSS OR DAMAGE TO FACIUTY 7 89'0PUBLICITY BO

~i7 NA 7 89 BO ADDITIONAL FACTORS

~18 NA 7 89 80 t1i~] NA 7 89 80 NAME. J.L.RISCHL'ING GPO eb'l IIIT

g4 SUPPLEMENT TO REPORTABLE OCCURRENCE '050-'0315 76-36 SUPPLEMENT TO EVENT DESCRIPTION ITEM "a", HOWEVER, THE CONTROL ROOM OPERATOR FAILED TO COMPLETE SURVEILLANCE REQUIREMENT 4.8.1.1. la TO VERIFY CORRECT BREAKER ALIGNMENT WITHIN THE ONE HOUR TIME LIMIT.

SUPPLEMENT TO CAUSE DESCRIPTION TIME. (2) THE INVERTER FOR GOVERNOR POWER HAD FAILED. THE ISOLATION VALVES FOR XPS-228 AND XPS-229 WERE OPENED AND THE INVERTOR WAS SWITCHED TO AN ALTERNATE POWER SUPPLY. THE DIESEL WAS THEN STARTED AND RAN PROPERLY.

THESE VALVES ARE PRESUMED TO HAVE BEEN SHUT DURING A PREVIOUS CALIBRATION CHECK OF THE SPEED INDICATOR. TO PREVENT RECURRENCE, TRAINING WAS HELD WITH ALL CSI PERSONNEL INFORMING THEM OF THE CONSEQUENCES OF LEAVING INSTRUMENTS ISOLATED.

THE INVERTER WAS REPAIRED BY REPLACING AN OSCILLATOR BOARD ¹V091B, MANUFACTURERED BY SOLID STATE CONTROLS, INC. THE SURVEILLANCE TEST WAS THEN COMPLETED SATISFACTORILY.

THE COMPLETION OF THE" SURVEILLANCE REQUIREMENTS WAS IN PROGRESS AT SHIFT RELIEF TIME AND THE VERIFICATION OF CORRECT BREAKER ALIGNMENT WAS OVERLOOKED BY THE ONCOMING SHIFT UNTIL APPROXIMATELY SIX HOURS AFTER THE CD'~DIESEL GENERATOR WAS DISCOVERED INOPERABLE. THE CORRECT BREAKER 1- 4 ALIGNMENT WAS THEN IMMEDIATELY VERIFIED ALTHOUGH THE CD DIESEL GENERATOR WAS AVAILABLE AND BEING TESTED AT THIS TIME. THE IMPORTANCE OF ASSURING THAT ALL SPECIFIED SURVEILLANCE REQUIREMENTS ARE COMPLETED HAS BEEN DISCUSSED WITH THE SHIFT INVOLVED.