ML18200A064

From kanterella
Jump to navigation Jump to search
Annual Report for Reed College
ML18200A064
Person / Time
Site: Reed College
Issue date: 07/13/2018
From: Krahenbuhl M
Reed College
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML18200A064 (18)


Text

REED COLLEGE REACTOR FACILITY 3203 Southeast Woodstock Boulevard Portland , Oregon 97202-8199 July 13, 2018 telepho11e 503/777-7222 fax 503'777-7274 email ATTN: Document Control Desk reactor@reed.edu U.S. Nuclear Regulatory Commission web Washington, DC 20555-0001 http://reacror.reed.edu Docket: 50-288 License No: R-112 Enclosed is the annual report for Reed College.

Please contact me if you have any questions.

I declare under penalty of perjury that the foregoing is true and correct.

Executed o ~ 1 ) WI V Director, Reed Research Reactor Cc: Geoffrey A. Wertz, P.E.

Project Manager Research and Test Reactors U.S. Nuclear Regulatory Commission

REED RESEARCH REACTOR ANNUAL REPORT July 1, 2017 -- June 30, 2018 3203 Southeast Woodstock Blvd.

Portland, Oregon 97202-8199 503-777-7222 http ://reactor .reed .ed u reactor@reecl.edu

I TABLE OF CONTENTS Overview ..................................................................................................................................... 1 People .......................................................................................................................................... 2 Reactor Staff ........................................................ ............................................................................... 2 Reactor Operations Committee (ROC) ....................................................................................... 4 Facili ti es ...................................................................................................................................... 5 Reactor Facility .................................................................................................................................. 5 Rotating Specimen Rack Facility ................................................................................................. 5 Pneumatic Transfer System .......................................................................................................... 5 In-Core Facilities ............................................................................................................................ 5 In-Pool Facilities ............................................................................................................................... 5 Beam Facilities ................................................................................................................................... 5 Inspections and Audits ............................................................................................................. 6 Users ............................................................................................................................................ 7 Reactor Operations Seminar .................. ;...................................................................................... 7 Outside Users ..................................................................................................................................... 7 High School Student Project .......................................................................................................... 8 Scaler Kits ............................................................................................................................................ 9 Reed Classes ........................................................................................................................................ 9 Industrial and Commercial Applications .................................................................................. 9 Reactor Operations ............................................................................. :................................ 10 0 per a tions ......................................................................................................................................... 10 Unplanned Reactor Shutdowns .................................................................................................. 11 Reactor Maintenance .......................................................................................................... 13 Significant Maintenance ............................................................................................................... 13 Radiation Protection ........................................................................................................... 14 Personnel Dosimetry ..................................................................................................................... 14 Fixed Area Dosimetry .................................................................................................................... 14 Gaseous Releases ............................................................................................................................ 15 Liquid Waste Releases ................................................................................................................... 15 Solid Waste Disposal ...................................................................................................................... 15 Environmental Sampling .............................................................................................................. 15 Reed Research Reactor Annual Report 201 7-2018 3

IOVERVIEW This report covers the period from July 1, 2017 to June 30, 2018, and is intended to fulfill the reporting requirements of the U.S. Nuclear Regulatory Commission License No. R-11 2 , Docket 50-288 , the U.S. Department of Energy , and the Oregon Department of Energy Rule No. 345-030-010.

Reed College operates a 250 kW TRIGA- Mark I reactor. The Reed College Research Reactor has been a resource for research and educational projects in the Portland area since 1968 . The mai n uses of the Reed Research Reactor are instruction and research ,

especially in the fi eld of trace-element analysis.

During the year there were 1031 visitors from schools, colleges, universities, and special groups. Additionally , 1769 visitors were part of Reed College activities (prospective stud ents, family of students, Reed classes, etc.). Thirty members of emergency response organizations came for training. Including tours and research conducted at the facility, the Reed Research Reactor contributed to the ed ucation al programs of 37 colleges, universities and 17 K-12 schools.

During the year the reactor was taken critical 552 times on 180 days . The total energy produced was approximately 25 megawatt-hours.

The reactor staff consists of a Director, a Reactor Operations Manager, and Reed College undergraduate students who are licensed by the Nuclear Regulatory Commission as reactor operators or senior reactor operators. During the reporting period , 24 RO candidates and 5 SRO candidates received NRC licenses after passing NRC exams admini stered in October 2017 and March 201 8.

There were no radiation exposures to individuals in excess of the any limits during the year. There were no releases of liquid radi oactive material from the facility and airborne releases were well within regulatory limits.

The Nuclear Regul atory Commission conducted a regular inspection during this period.

The in spection resulting in no significant findin gs.

i PEOPLE Reactor Staff During the period July 1, 2017 to June 30, 2018, the staff consisted of:

Table 1 Supervisory Staff 2017-2018 Reactor Director: Melinda Krahenbuhl 6/11 - present Reactor Operations Manager: Ilana Novakoski 9/17 -present Christina Barrett 6/15-9/17 Radiation Safety Officer: April Karr Sams 5/16 - present Operations Supervisor: Sarah Brodesser 5/16-5/18 Colin Whitmore 5/18 - present Training Supervisor: Margie Oxley 5/16-5/18 Colin Whitmore 5/17 - 5/18 Maileen Nakashima 5/18 - present Elena McKnight 5/18 - present Requalification Supervisor: Trent Freeman 5/16-5/18 Brianna Dobson 5/18 - present Projects Supervisor . Malcolm McCarthy 5/15 - 12/17 Mark Anthony Loya 12/17 -5/18 Victoria Ellis 5/18 - present Table 2 Staff 2017-2018 Senior Reactor Operators (SRO)

Sarah Brodesser Trenton Freeman Zachary Beadle Il ana Novakoski Christina Barrett C laire Mashlan Anthony Loya Anton Zytsev Milander Victoria Ellis Maileen Malcolm McCa rth y Helen Zhan g Nakashima Matyas Szabo Melinda Colin Whitmore Bok Wai (Gabe)

Krahenbuhl Yeung Bri anna Dobso n Grayson Perez Margie Oxley Reactor Operators (RO)

Jilli an James Giolando Sophie Bender Rebecca Xie Ramirez Alex ander Matthew Parsons E lena McKni ght Kees Abrahams Benkendorfer Henry Scheffer Avantika Vivek Lorenzo Barrar Callie Burris Sh awn Owens Palak Jain Stephanie Gee Dorothy Cheng Laura Yosh id a Rhody Kaner Tenzien Sangpo Ashlee Cook Nick Egan Emmet Kahn Miriam Zitler Yu Fu Segov ia G arcia Add ison Guynn Jonathon Li Val Lim Yilian Liu Thomas Natalie Murphy Gaofei (Nemo)

Malthouse Shen 2

The list of operators includes everyone who held a license at any time during the reporting period . Reactor Operators who upgrade their licenses to Senior Reactor Operators during the reporting period are listed under Senior Reactor Operators. There are fifty licensed operators at Reed College.

Reed Research Reactor Annual Report 2017-2018 3

Reactor Operations Committee (ROC)

For the 2017 - 2018, the membership of the Reactor Operation committee is listed .

Reactor Operations Committee

  • Norm Dyer (OAR Services)
  • John Essick (Physics Faculty, Reed College)
  • Robert McCollough (Neighborhood Association)
  • April Karr Sams (Director, Reed Environmental Health and Safety)
  • Dan Gerrity - (Chemistry Faculty , Reed College)
  • Steve Reese (Radiation Center Director, Oregon State University)
  • Nigel Nicholson (Dean of the Faculty, Reed College)
  • Melinda Krahenbuhl (Director, RRR)
  • Christina Barrett/Ilana Novakoski (Reactor Operations Manager, RRR)
  • Sarah Brodesser (Supervisor, RRR) 4

i FACILITIES Reactor Facility In addition to the reactor, Reed College has a radiochemistry lab. The equipment ava il able at the reactor facility includes high purity germanium gamma spectrometers, ion chambers, beta counters, Geiger Muller tubes, and alpha detectors. These instruments are used for experiments and training in nu clear science and rad iation detection. One exit monitor is in the control room. A liquid scintillation detector serves both the reactor and broad scope license users. The reactor fac ility has several systems for performing irradiations, described below .

Rotatin2 Specimen Rack Facility The rotating specimen rack is located in a well on top of the graphite reflector surround ing the core. The rack co nsists of a circul ar array of 40 tubular receptacles, each of wh ich can acco mmodate two irradiation tubes . The rack automatically rotates during irradiatio n to ensure each sample receives th e same neutron flu x . The approximate thermal neutron flux in a rotating rack positio n at full power is 1.7 x 10 with a cadmium 02 rati o of 6.

Pneumatic Transfer System The pneumatic transfer system ("rabbit") cons ists of an irradi ation chamber in the outer F- ring of the core and its associated blower and piping. This allows samples to be transferred in and out of the reactor core very rapidly while the reactor is at power. The flux in the core terminal is approximately Sx I 0 n/cm*s when the reactor is at full power.

02 In-Core Facilities The central thimble is a water-filled irradiation chamber about 3cm in diameter. It provides the highest avai lable neutron flux , about lx10"n/cm*s .

Foil-insertion holes, 0.8cm in diameter, are drilled at various positions through the grid plates. T hese holes allow insertin g special holders containin g flu x wires into the core, to obtain neutron flux maps of the core .

In-Pool Facilities Near core, in-pool irradiation fac ilities can be arranged for larger samples. Neutron fluxes will be lower than in the rotary specimen rack and will depend on the sample location.

An iridium gamma irradiator is also in the reactor pool for gamma only irradiations.

Beam Facilities The central thimble can be evacuated with gas, producin g a vertical neutron beam. The flu x above the beam exi t is approximately 1x 10' n/cm*s when the reactor is at full power.

Reed Research Reactor Annual Report 2017-2018 5

IINSPECTIONS AND AUDITS The Nuclear Regulatory Commission conducted a routine inspection during the reporting period . The inspection resulted in no significant findings .

Two audits were completed during this period. Wayne Lei (ROC) conducted an internal audit on Dec. 6-7, 2017. Timothy Koe th and Amber Johnson (University of Maryland -

Research Reactor) conducted and external audit May 29-31, 2018.

6

jUSERS Reactor Operations Seminar The Reed Research Reactor conducts an annual seminar series. This non-credit course serves as an introduction to nuclear reactor theory, health physics, and reactor operation.

Some of the students continue with in-depth reactor operator training and subsequently apply for a Reactor Operator (RO) license. If successful, the individual may be hired to operate the reactor. In addition, existing ROs may take the NRC Senior Reactor Operator (SRO) exam to upgrade their licenses.

During the reporting period, 24 out of 26 RO candidates and 5 out 5 of SRO candidates received NRC licenses after passing NRC exams in February and May 2018.

Figure 1 is a graph of the pass rate for RO and SRO since 2000.

~ RO pass rate 120 %

100%

80 %

60 %

40 %

20 %

QO/o 0

0 0

N 0

M 0

"3" 0

LI) 0

\0 0

r,...

0 CX) 0 a,

0 0

N M

~ ...0

"'  ::: "... ~

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N N N N Figure 1 Reed Research Reactor License Exam Results Outside Users During the year there were 1,031 visitors from schools, colleges, universities, and special groups. Additionally, 1,769 individuals visited as part of Reed College activities (prospective students , family of students , Reed classes, etc .). Thirty members of emergency response organizations came for training.

Reed Research Reactor Annual Report 2017-2018 7

Figure 2 is a graph showing the history of visiting groups.

60 , - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ,

__ ..,.. __ Colleges and Uni ve rsities 50 +-----------------------< - - High Schools/ Middle Schools/ Elementary Schoo ls

- . . . - - Special Groups 40 +----------------------------------L..,,--~-----l

~

~

~o+------------------------------+----',.....__,,__,--;

Q)

.0 E

z 20

+ - - - - ~ - - - - - ---#-- ~ -"""'C..:...,.---- - - - - - - - - - f - ,1-f--+--~----l

' , ... ____j ,

0 +---,---,---,---,--,----,--~--,---,--,----,---,---,---,--,----,---,---,---i 20 00 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 20 14 2015 2016 2017 2018 Figure 2 Visiting Groups Many reactor tours include hands-on use of facility equipment to conduct experiments in radiation science, health physics , and nuclear physics. A typical lab involves determining the background of a Geiger Muller scaler system an d then determining the half-life of a sample of radioactive material.

Several special programs for gifted children use the reactor for projects. These are designed to enrich their educational program and prepare them for college. Some of the groups who use the reactor target minority and disadvantaged youth who are historically under-represented in science professions . Additional ly, several Boy Scouts of America troops have visited the facility to complete the Nuclear Science merit badge .

High School Student Projects The Reed Research Reactor continues to be used in independent science projects initiated by students from several Oregon and Washington State high schools. Each year the we host two Saturday Academy students as interns for the summer.

  • Sarah Daniels determined the fast and thermal flu x for each rotary specimen rack position.
  • John Joo used neutron activation to determine the aluminum content in his hair.
  • Bryan To used neutron activation to determ ine the uptake of heavy metals in plants.
  • Anushka Nair used gamma spectroscopy to look for heavy metals in lichen and moss .

8

Scaler Kits Through the generosity of Portland General Electric, the reactor lends out kits containing a Geiger counter, a scaler, and some small exempt sources to local high schools.

Reed Classes

  • Chemistry 101 determine composition of an unknown.

Industrial and Commercial Applications The Reed Research Reactor is available for industrial or commercial concerns when it does not conflict with our educational goals. The majority of this work is meter calibration. The facility also provides radiation protection training to interested parties and schools in the area.

Reed Research Reactor Annual Report 2017-2018 9

II REACTO R OPERATIONS Operations During the year the reactor was taken critical 552 times on 180 days. The total energy produced was approximately 25.01 megawatt-hours. Operating history by month appears in Table 3. A history of the data is shown in Figure 3 .

Table 3 Operating History 2016-2017 TIMES CRITICAL DAYS OPERATED MW-HOURS July2017 23 12 1.27 August 2017 61 18 3.37 September 201 7 41 19 2.06 October 2017 89 21 4.54 November 2017 33 15 1.27 December 201 7 17 4 0.4 January 2018 22 15 1.19 Febmary 2018 55 18 1.8 March 2018 72 21 2.78 April 2018 68 18 4.48 May2018 32 10 1.3 June 2018 39 9 0.55 Total 552 180 25.01 10

600 ,- - --;::=========;----- - - - - - - - -- - - - - - - - ,

- Times Critical

- Da ys Operated

. 500 +-----i

- Irradiations

- - MW-hrs 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 20 15 2016 2017 2018 Figure 3. Operations Unplanned Reactor Shutdowns There were 11 inadvertent reactor shutdowns (scrams) as show n in Table 4. The number of unplanned reactor shutdowns is shown in Figure 4.

Table 4 Unplanned Reactor Shutdowns DATE SCRAM CHANNEL CAUSE OF SCRAM 7/7/2017 Linear Operator error 8/25/2017 Percent Operator error 8/23/2017 Percent Operator error 9/7/2017 Percent Operator error 9/26/2017 Linear Operator error 10/6/2017 Linear and Percent Operator error l 1/9/2017 Linear Operator error 12/2/2017 Percent Operator error l/27/2018 Linear Operator error 4/9/2018 Linear and Percent Operator error 4/9/2018 Percent Operator error Reed Research Reactor Annual Report 2017-2018 11

25 20 15 10 5

0 1992 1994 1996 1998 2000 2002 2004 2006 2008 20 10 2012 2014 2016 2018 Figure 4 Unplanned Shutdowns 12

i REACTOR MAINTENANCE Significant Maintenance Reactor staff performs routine equipment checks on a daily, biweekly , bimonthly ,

semiannual (January and July) and annual (January) basis as required by facility procedures. Reed College maintenance personnel assist with routine preventative maintenance to auxiliary equipment.

Table 5 Maintenance 2017-2018 COMPONENT EXPLANATION 17-01 Water level Monitor Replaced the capacitance water level monitor with an ultrason ic water level monitor Reed Research Reactor Annual Report 2017-2018 13

iRADIATI O N P R OTECTION Personnel Dosimetry Dosimeters are changed on a calendar quarter schedule. Individuals were issued beta-gamma sensitive ring badges and whole-body badges .

There were 22 shallow doses recorded by finger badges with the highest individual shallow dose recorded was 74 rnrem. The were no recorded doses to any whole body dosimetry. All doses are reported were below occupational dose limits and no further action was required.

Fixed Area Dosimetry Radiation levels are continually monitored to provide an indication of the average radiation levels in the reactor bay and dose outside the facility. All dosimeters monitor beta and gamma radiation. Three locations also measure neutron dose.

The deep dose equivalent radiation measured by fixed dosimeters during the period April J , 20 J7 to March 31, 2018 are shown in Table 5. Dosimeters from April 1, 2018 to June 30, 2018 are currently being processed . An "M" indicates less than 1 rnrem above background during the quarter. The 20 rnrem recorded for the roof was attributed by the dosimetry vendor as fast neutrons. The reported dose was contested since there is no plausible explanation for a neutron dose to the roof when there was no work being done on the core and no open beam ports. Additionally, the outside north dosimeter was missi ng for the 2qtr 2017.

Table 6 Area Radiation Dosimeters (doses are in mrem per calendar quarter)

HE1GH1 RADlATJON APRIL 1- JUL 1 - OCT l - JAN 1-LOCATION JUNE 30 SEP 30 TOTAL (M) DETECTED DEC 31 MAR31 Reactor East Wall 1.5 p,y 4 0 4 3 11 Reactor North Wall 1.6 p,y 3 2 2 4 11 Reactor West Wall 1.0 p,y,n 13 18 5 6 42 Reactor South Wall 1.6 p,y,n 6 2 5 3 16 Reactor North Wall -

2.3 p,y 2 0 0 1 3 Hi gh Control Room 1.5 p,y 3 3 4 6 13 Outside North 2.8 p,y - M M M M Outside Roof 0.4 p,y,n M 20 M M 20 Outside East 1.5 p,y M M M M M Outside South 0.4 p,y M M M M M Co untin g Room l.5 p,y M M M M M 14

Gaseous Releases The only routine release of gaseous radioactivity is from "Ar (1 .83-hour half-life) and "N (7 .13-second half-life). These come from activation of pool water and air in the pool water and in the itTadi ation facilit ies. For the reporting period, the average gaseous activity at the site boundary was 1.7 x 10 *" J,tCi/ml, which would deliver a dose to a member of the public of approximately 0.7 mrem , well below regul atory guidelines and constraints. Figure 5 shows the gaseous releases for each year.

1.E-08 1.E-09 1.E-10 1.E-11 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 Figure 5 Gaseous Releases Activity (µCi/ml) at Site Boundary Liquid Waste Releases No liquid radioactive waste was released from the Reed Research Reactor during this report period.

Solid Waste Disposal There were no shipments of low-level radioactive waste from the facility during this reporting period .

Environmental Sampling Soil samples taken from the area surrounding the facility showed no activity above background. Water from the facility's secondary cooli ng system and the nearby canyon were sampled for activation products and tritium, but showed no activity above normal background.

Reed Research Reactor Annual Report 2017-2018 15