|
---|
Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000528/20223012022-06-21021 June 2022 NRC Examination Report 05000528/2022301, 05000529/2022301, and 05000530/2022301 IR 05000528/20193012020-01-28028 January 2020 NRC Initial Examination Report 05000528/2019301, 05000529/2019301, and 05000530/2019301 IR 05000528/20183022018-10-31031 October 2018 NRC Retake Examination Report 05000528/2018302; 05000529/2018/2018302; 05000530/2018302 IR 05000528/20183012018-06-0404 June 2018 NRC Examination Report 05000528/2018301; 05000529/2018301; 05000530/2018301 IR 05000528/20163012016-12-0505 December 2016 NRC Examination Report 05000528/2016301; 05000529/2016301; 05000530/2016301 ML15182A1192015-06-19019 June 2015 Response to Regulatory Issue Summary (RIS) 2015-05, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20153012015-06-10010 June 2015 Er 05000528/2015301; 05000529/2015301; 05000530/2015301; 04/13/2015 - 05/13/2015; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report IR 05000528/20133012013-12-17017 December 2013 Er 05000528/2013301; 05000529/2013301; 05000530/2013301; October 1 - November 20, 2013; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report IR 05000528/20123012012-05-31031 May 2012 Er 05000528-12-301, 05000529-12-301 & 05000530-12-301, March 16 - May 23, 2012, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Initial Operator Licensing Examination Report IR 05000528/20103012010-12-22022 December 2010 Er 05000528-10-301; 05000529-10-301; 05000530-10-301; November 5-17, 2010; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report IR 05000528/20093012009-12-15015 December 2009 Er 05000528-09-301, 05000529-09-301, 05000530-09-301, on November 6, 2009, Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report IR 05000528/20073012007-09-21021 September 2007 Er 05000528-07-301, 05000529-07-301, 05000530-07-301; 07/20 - 08/21/2007, Palo Verde Nuclear Generating Station Units 1, 2 and 3, Operator Licensing Initial Examination Report ML0527602712005-09-21021 September 2005 Response to RIS 2005-19, Preparation and Scheduling of Operator Licensing Examinations. ML0432300042004-11-16016 November 2004 Use of Plant Equipment for Limited Senior Operator Examinations (Examination Report 50-528/-529/-530/2004-301) ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination IR 05000528/20033012003-09-0303 September 2003 Er 05000528-03-301, 05000529-03-301, 05000530-03-301; on 7/21-24/2003; for Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examinations ML0324806192003-09-0303 September 2003 Er 05000528-03-301, 05000529-03-301, 05000530-03-301; on 7/21-24/2003; for Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examinations 2022-06-21
[Table view] |
Text
une 4, 2018
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
NRC EXAMINATION REPORT 05000528/2018301; 05000529/2018301; 05000530/2018301
Dear Mr. Bement:
On April 20, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on April 20, 2018, with yourself and other members of your staff. A telephonic exit meeting was conducted on May 21, 2018, with Mr. J. Allison, Simulator Support Section Leader, who was provided the NRC licensing decisions.
The examination included the evaluation of nine applicants for reactor operator licenses, eight applicants for instant senior reactor operator licenses, and seven applicants for upgrade senior reactor operator licenses. The license examiners determined that all of the applicants for reactor operator licenses, seven of the applicants for instant senior reactor operator licenses, and six of the applicants for upgrade senior reactor operator licenses satisfied the requirements of Title 10 of the Code of Federal Regulations (CFR) Part 55, and the appropriate licenses have been issued. There were no post examination comments submitted by your staff. The Enclosure contains details of this report.
No findings were identified during this examination.
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-528, 50-529, and 50-530 License Nos. NPF-41, NPF-51, and NPF-74
Enclosure:
Examination Report 05000528/2018301; 05000529/2018301; 05000530/2018301 w/Attachment: Supplemental Information
REGION IV==
Docket: 05000528; 05000529; 05000530 License: NPF-41; NPF-51; NPF-74 Report: 05000528/2018301; 05000529/2018301; 05000530/2018301 Licensee: Arizona Public Service Company Facility: Palo Verde Nuclear Generating Station Location: Tonopah, Arizona Dates: April 13 through May 21, 2018 Inspectors: C. Osterholtz, Chief Examiner, Senior Operations Engineer G. Callaway, Senior Reactor Technology Instructor J. Drake, Senior Reactor Inspector T. Farina, Senior Operations Engineer M. Hayes, Operations Engineer J. Kellum, Senior Reactor Engineer J. Kirkland, Senior Operations Engineer B. Larson, Senior Operations Engineer Approved By: Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Enclosure
SUMMARY
Examination Report 05000528/2018301; 05000529/2018301; 05000530/2018301; 04/13/2018 to 05/21/2018; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report.
NRC examiners evaluated the competency of nine applicants for reactor operator licenses, eight applicants for instant senior reactor operator licenses, and seven applicants for upgrade senior reactor operator licenses at Palo Verde Nuclear Generating Station, Units 1, 2, and 3.
The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The written examination was administered by the licensee on April 13, 2018. NRC examiners administered the operating tests on April 16 through April 20, 2018.
The examiners determined that all of the applicants for reactor operator licenses, seven of the applicants for instant senior reactor operator licenses, and six of the applicants for upgrade senior reactor operator licenses satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
NRC-Identified
and Self-Revealed Findings None.
Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications
a. Scope
NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. Examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identified.
.2 Examination Development
a. Scope
NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an onsite validation of the operating tests.
b. Findings
NRC examiners provided outline, proposed examination, and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
NRC examiners determined the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
.3 Operator Knowledge and Performance
a. Scope
On April 13, 2018, the licensee proctored the administration of the written examinations to all 24 applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on April 27, 2018.
The NRC examination team administered the various portions of the operating tests to all applicants on April 16 through April 20, 2018.
b. Findings
No findings were identified.
All applicants passed the written examination. All the reactor operator applicants, seven of the instant senior reactor operator applicants, and six of the upgrade senior reactor operator applicants passed the operating tests. The final written examinations, operating tests, and post examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post examination comments as indicated in the licensee submittal.
The examination team noted one generic weakness associated with applicant performance on the dynamic scenario section of the operating tests:
- The ability of senior reactor operator applicants to identify applicable technical specifications associated with a failure of the B train motor driven auxiliary feedwater pump. This deficiency has been entered into the licensees corrective action program as Condition Report PCR-40AL-9ES2B.
Copies of all individual examination reports were sent to the facility training manager for evaluation and determination of appropriate remedial training.
.4 Simulation Facility Performance
a. Scope
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Scope
The NRC examiners reviewed examination security during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
Exit Meeting The chief examiner presented the preliminary examination results to yourself and other members of your staff on April 20, 2018. A telephonic exit was conducted on May 21, 2018, between Mr. C. Osterholtz, Chief Examiner, and Mr. J. Allison, Simulator Support Section Leader.
The licensee did not identify any information or materials used during the examination as proprietary.
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- R. Bement, EVP, Chief Nuclear Officer
- J. Allison, Section Leader, Simulator Support
- P. Bury, Director, Nuclear Training
- J. Cadogan, SVP, Site Operations
- S. Franquero, Sect Leader, Ops Training
- K. Gil, Dept Leader, Long Range Planning
- Z. Goldwasser, Dept Leader, Ops Training
- M. Harkins, Ops Training Instructor
- T. Horton, Director, Operations
- C. Kharrl, VP, Site Operations/Gen Plant Mgr
- M. Lacal, SVP, Regulatory and Oversight
- D. Lowdermilk, Nuclear Ops Coordinator, Licensing
- D. Oliver, Sect Leader, Ops Training
- D. Radosevic, Ops Training Instructor
- J. Rodgers, Ops Training Instructor
- J. Shaver, Sect Leader, Ops Training
- C. Shields, Mgr, Emergency Preparedness
- S. Zerkel, Ops Training Instructor
NRC Personnel
- C. Peabody, Senior Resident Inspector
ADAMS DOCUMENTS REFERENCED