Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000528/20223012022-06-21021 June 2022 NRC Examination Report 05000528/2022301, 05000529/2022301, and 05000530/2022301 IR 05000528/20193012020-01-28028 January 2020 NRC Initial Examination Report 05000528/2019301, 05000529/2019301, and 05000530/2019301 IR 05000528/20183022018-10-31031 October 2018 NRC Retake Examination Report 05000528/2018302; 05000529/2018/2018302; 05000530/2018302 IR 05000528/20183012018-06-0404 June 2018 NRC Examination Report 05000528/2018301; 05000529/2018301; 05000530/2018301 IR 05000528/20163012016-12-0505 December 2016 NRC Examination Report 05000528/2016301; 05000529/2016301; 05000530/2016301 ML15182A1192015-06-19019 June 2015 Response to Regulatory Issue Summary (RIS) 2015-05, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20153012015-06-10010 June 2015 Er 05000528/2015301; 05000529/2015301; 05000530/2015301; 04/13/2015 - 05/13/2015; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report IR 05000528/20133012013-12-17017 December 2013 Er 05000528/2013301; 05000529/2013301; 05000530/2013301; October 1 - November 20, 2013; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report IR 05000528/20123012012-05-31031 May 2012 Er 05000528-12-301, 05000529-12-301 & 05000530-12-301, March 16 - May 23, 2012, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Initial Operator Licensing Examination Report IR 05000528/20103012010-12-22022 December 2010 Er 05000528-10-301; 05000529-10-301; 05000530-10-301; November 5-17, 2010; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report IR 05000528/20093012009-12-15015 December 2009 Er 05000528-09-301, 05000529-09-301, 05000530-09-301, on November 6, 2009, Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report IR 05000528/20073012007-09-21021 September 2007 Er 05000528-07-301, 05000529-07-301, 05000530-07-301; 07/20 - 08/21/2007, Palo Verde Nuclear Generating Station Units 1, 2 and 3, Operator Licensing Initial Examination Report ML0527602712005-09-21021 September 2005 Response to RIS 2005-19, Preparation and Scheduling of Operator Licensing Examinations. ML0432300042004-11-16016 November 2004 Use of Plant Equipment for Limited Senior Operator Examinations (Examination Report 50-528/-529/-530/2004-301) ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination IR 05000528/20033012003-09-0303 September 2003 Er 05000528-03-301, 05000529-03-301, 05000530-03-301; on 7/21-24/2003; for Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examinations ML0324806192003-09-0303 September 2003 Er 05000528-03-301, 05000529-03-301, 05000530-03-301; on 7/21-24/2003; for Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examinations 2022-06-21
[Table view] |
Text
November 16, 2004 Mr. David M. Smith Plant Manager Palo Verde Nuclear Generating Station Mail Station 7602 P.O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION UNITS 1, 2, AND 3 - USE OF PLANT EQUIPMENT FOR LIMITED SENIOR OPERATOR EXAMINATIONS (EXAMINATION REPORT 50-528/-529/-530/2004-301)
Dear Mr. Smith:
This is in response to your letter of August 25, 2004, requesting approval (pursuant to 10 CFR 55.46(b)(1)) to use plant equipment (i.e., the refueling machine console, fuel transfer machine console, and spent fuel handling machine) in lieu of a plant-referenced simulator for evaluating limited senior operator applicants at Palo Verde Nuclear Generating Station, Units 1, 2, and 3.
We have reviewed your request with the Office of Nuclear Reactor Regulation and concluded, pursuant to 10 CFR 55.46(b)(2), that the proposed use of the stated plant equipment will be suitable for conducting the limited senior operator operating tests in accordance with 10 CFR 55.45(a) and (b). As confirmed in the August 19, 2004, letter from Mr. Anthony Gody, Chief, Operations Branch, your staff will prepare the examinations based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." Be advised that Section E of Examination Standard 701, Administration of Initial Examinations for Senior Operators Limited to Fuel Handling, requires the operating test to be performance-based to the maximum extent possible and encourages the actual use of plant equipment to handle dummy fuel elements, assemblies, or modules during the operating test whenever safe and feasible. Mr. Mark Haire, the Chief Examiner assigned to review and administer your December 2004 examinations, will work with your staff to develop the operating tests and coordinate the use of actual plant equipment (rather than photographs or simulations) to ensure compliance with the NUREG-1021 requirements and guidelines.
As required by Examination Standard 201, Initial Operator Licensing Examination Process, Mr. Greg Werner has reviewed your examination security procedure and briefed your staff on the NRCs examination integrity and security requirements and considerations (i.e., of ES-201).
Arizona Public Service Company This approval applies to this and all future limited senior operator examinations at Palo Verde Nuclear Generating Station, Units 1, 2, and 3. Please contact Mr. Haire at 817-860-8117 or Mr. Gody at 817-860-8159 if you have any questions regarding this matter.
Sincerely,
/RA/
Dwight D. Chamberlain, Director Division of Reactor Safety Dockets: 50-528; 50-529; 50-530 Licenses: NPF-41; NPF-51; NPF-74 cc:
Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Douglas K. Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040 M. Dwayne Carnes, Director Regulatory Affairs/Nuclear Assurance Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 Hector R. Puente Vice President, Power Generation El Paso Electric Company 310 E. Palm Lane, Suite 310 Phoenix, AZ 85004
Arizona Public Service Company Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX 79901 John W. Schumann Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100 John Taylor Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Cheryl Adams Southern California Edison Company 5000 Pacific Coast Hwy. Bldg. DIN San Clemente, CA 92672 Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ 85251 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326
Arizona Public Service Company Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
Senior Resident Inspector (NLS)
Branch Chief, DRP/D (TWP)
Senior Project Engineer, DRP/D (CJP)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (KEG)
DRS STA (DAP)
Matt Mitchell, OEDO RIV Coordinator (MAM4)
Assisting PV Site Secretary (VLH)
ADAMS: X Yes G No Initials: ______
X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive E:\Filenet\ML043230004.wpd OB C:OB D:DRS MHaire ATGody DDChamberlain
/RA/ /RA/ /RA/
11/10/04 11/16/04 11/16/04 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax