Category:Letter
MONTHYEARML24295A0362024-10-23023 October 2024 Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a IR 05000528/20243012024-06-17017 June 2024 NRC Examination Report 05000528/2024301; 05000529/2024301; 05000530/2024301 ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24129A1482024-05-0707 May 2024 And Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 2024-09-27
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000528/20243012024-06-17017 June 2024 NRC Examination Report 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20223012022-06-21021 June 2022 NRC Examination Report 05000528/2022301, 05000529/2022301, and 05000530/2022301 IR 05000528/20193012020-01-28028 January 2020 NRC Initial Examination Report 05000528/2019301, 05000529/2019301, and 05000530/2019301 IR 05000528/20183022018-10-31031 October 2018 NRC Retake Examination Report 05000528/2018302; 05000529/2018/2018302; 05000530/2018302 IR 05000528/20183012018-06-0404 June 2018 NRC Examination Report 05000528/2018301; 05000529/2018301; 05000530/2018301 IR 05000528/20163012016-12-0505 December 2016 NRC Examination Report 05000528/2016301; 05000529/2016301; 05000530/2016301 ML15182A1192015-06-19019 June 2015 Response to Regulatory Issue Summary (RIS) 2015-05, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20153012015-06-10010 June 2015 Er 05000528/2015301; 05000529/2015301; 05000530/2015301; 04/13/2015 - 05/13/2015; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report IR 05000528/20133012013-12-17017 December 2013 Er 05000528/2013301; 05000529/2013301; 05000530/2013301; October 1 - November 20, 2013; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report IR 05000528/20123012012-05-31031 May 2012 Er 05000528-12-301, 05000529-12-301 & 05000530-12-301, March 16 - May 23, 2012, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Initial Operator Licensing Examination Report IR 05000528/20103012010-12-22022 December 2010 Er 05000528-10-301; 05000529-10-301; 05000530-10-301; November 5-17, 2010; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report IR 05000528/20093012009-12-15015 December 2009 Er 05000528-09-301, 05000529-09-301, 05000530-09-301, on November 6, 2009, Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report IR 05000528/20073012007-09-21021 September 2007 Er 05000528-07-301, 05000529-07-301, 05000530-07-301; 07/20 - 08/21/2007, Palo Verde Nuclear Generating Station Units 1, 2 and 3, Operator Licensing Initial Examination Report ML0527602712005-09-21021 September 2005 Response to RIS 2005-19, Preparation and Scheduling of Operator Licensing Examinations. ML0432300042004-11-16016 November 2004 Use of Plant Equipment for Limited Senior Operator Examinations (Examination Report 50-528/-529/-530/2004-301) ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination IR 05000528/20033012003-09-0303 September 2003 Er 05000528-03-301, 05000529-03-301, 05000530-03-301; on 7/21-24/2003; for Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examinations ML0324806192003-09-0303 September 2003 Er 05000528-03-301, 05000529-03-301, 05000530-03-301; on 7/21-24/2003; for Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examinations 2024-06-17
[Table view] |
Text
November 16, 2004 Mr. David M. Smith Plant Manager Palo Verde Nuclear Generating Station Mail Station 7602 P.O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION UNITS 1, 2, AND 3 - USE OF PLANT EQUIPMENT FOR LIMITED SENIOR OPERATOR EXAMINATIONS (EXAMINATION REPORT 50-528/-529/-530/2004-301)
Dear Mr. Smith:
This is in response to your letter of August 25, 2004, requesting approval (pursuant to 10 CFR 55.46(b)(1)) to use plant equipment (i.e., the refueling machine console, fuel transfer machine console, and spent fuel handling machine) in lieu of a plant-referenced simulator for evaluating limited senior operator applicants at Palo Verde Nuclear Generating Station, Units 1, 2, and 3.
We have reviewed your request with the Office of Nuclear Reactor Regulation and concluded, pursuant to 10 CFR 55.46(b)(2), that the proposed use of the stated plant equipment will be suitable for conducting the limited senior operator operating tests in accordance with 10 CFR 55.45(a) and (b). As confirmed in the August 19, 2004, letter from Mr. Anthony Gody, Chief, Operations Branch, your staff will prepare the examinations based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." Be advised that Section E of Examination Standard 701, Administration of Initial Examinations for Senior Operators Limited to Fuel Handling, requires the operating test to be performance-based to the maximum extent possible and encourages the actual use of plant equipment to handle dummy fuel elements, assemblies, or modules during the operating test whenever safe and feasible. Mr. Mark Haire, the Chief Examiner assigned to review and administer your December 2004 examinations, will work with your staff to develop the operating tests and coordinate the use of actual plant equipment (rather than photographs or simulations) to ensure compliance with the NUREG-1021 requirements and guidelines.
As required by Examination Standard 201, Initial Operator Licensing Examination Process, Mr. Greg Werner has reviewed your examination security procedure and briefed your staff on the NRCs examination integrity and security requirements and considerations (i.e., of ES-201).
Arizona Public Service Company This approval applies to this and all future limited senior operator examinations at Palo Verde Nuclear Generating Station, Units 1, 2, and 3. Please contact Mr. Haire at 817-860-8117 or Mr. Gody at 817-860-8159 if you have any questions regarding this matter.
Sincerely,
/RA/
Dwight D. Chamberlain, Director Division of Reactor Safety Dockets: 50-528; 50-529; 50-530 Licenses: NPF-41; NPF-51; NPF-74 cc:
Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Douglas K. Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040 M. Dwayne Carnes, Director Regulatory Affairs/Nuclear Assurance Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 Hector R. Puente Vice President, Power Generation El Paso Electric Company 310 E. Palm Lane, Suite 310 Phoenix, AZ 85004
Arizona Public Service Company Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX 79901 John W. Schumann Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100 John Taylor Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Cheryl Adams Southern California Edison Company 5000 Pacific Coast Hwy. Bldg. DIN San Clemente, CA 92672 Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ 85251 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326
Arizona Public Service Company Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
Senior Resident Inspector (NLS)
Branch Chief, DRP/D (TWP)
Senior Project Engineer, DRP/D (CJP)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (KEG)
DRS STA (DAP)
Matt Mitchell, OEDO RIV Coordinator (MAM4)
Assisting PV Site Secretary (VLH)
ADAMS: X Yes G No Initials: ______
X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive E:\Filenet\ML043230004.wpd OB C:OB D:DRS MHaire ATGody DDChamberlain
/RA/ /RA/ /RA/
11/10/04 11/16/04 11/16/04 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax