ML18142B838
ML18142B838 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 05/22/2018 |
From: | Jamnes Cameron Reactor Projects Region 3 Branch 4 |
To: | Craven R Point Beach |
References | |
IR 2018010 | |
Download: ML18142B838 (9) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, ILLINOIS 60532-4352 May 22, 2018 Mr. Robert Craven Site Director NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION AT POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
Dear Mr. Craven:
This letter is to request information to support our scheduled problem identification and resolution (PI&R) inspection beginning August 13, 2018, at Point Beach Nuclear Plant, Units 1 and 2. This inspection will be performed in accordance with the Nuclear Regulatory Commission (NRC) baseline Inspection Procedure 71152.
Experience has shown that these inspections are very resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents requested for the inspection.
The documents requested are copies of condition reports (CRs) and lists of information necessary to ensure the inspection team is adequately prepared for the inspection. The information requested prior to the inspection may be provided in electronic format by either a CD, DVD, or a website and should be provided for NRC review by July 23, 2018.
Mr. Robert Ruiz, of our office, will contact your staff to determine the best method of providing the requested information.
If there are any questions about the material requested, or the inspection in general, please contact Mr. Ruiz at 630-829-9732 or robert.ruiz@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.
R. Craven The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA Kenneth Riemer Acting for/
Jamnes L. Cameron, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27
Enclosure:
Requested Information to Support PI&R Inspection cc: Distribution via LISTSERV
R. Craven Letter to Robert Craven from Jamnes L. Cameron dated May 22, 2018
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION AT POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 DISTRIBUTION:
Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMPointBeach RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML18142B838 OFFICE RIII RIII NAME RRuiz:lg KRiemer for JCameron DATE 5/22/2018 5/22/2018 OFFICIAL RECORD COPY
Requested Information to Support Problem Identification and Resolution (PI&R) Inspection Inspection Report 05000266-05000301/2018010 If not provided via an accessible website, please provide the information on a disc (one for the team lead, one for the Resident Inspector Office, and one for each of the two other scheduled inspectors). Unless otherwise specified, the time frame for requested information is for the period of September 1, 2016, through the time the data request is answered. For requested lists please provide the information, if possible, in a sortable Excel spreadsheet format. If lists are provided in a sortable format the sort preference in the following items is not required as long as all of the requested information is provided.
In addition, inspectors will require computer access to the corrective action program (CAP) database while on site and, if possible, Wifi wireless internet access.
PROGRAM DOCUMENTS
- 1. A current copy of administrative procedure(s) for the corrective action program (CAP),
quality assurance audit program, self-assessment program, corrective action effectiveness review program, trending program, industry operating experience review program, maintenance rule program and top-level documents for the work control programs, work scheduling programs, and aging management program(s). Include a copy of the current top-level QA program/QA topical report document.
- 2. A current copy of the Employee Concerns Program/Ombudsman administrative procedure(s).
- 3. Description of any substantive changes made to the corrective action program philosophy or operation since the last biennial PI&R Inspection in November 2016.
Please include with each listed substantive change the effective date of the change.
Administrative and non-substantive changes do not need to be listed.
ASSESSMENTS
- 4. A copy of Quality Assurance (QA) audits of the CAP and self-assessment process and, if done, audits of the QA program.
- 5. A list of all other QA audits completed with a brief description of areas audited. Indicate where findings requiring corrective action were identified.
- 6. A copy of completed assessments of the CAP program, the QA program, and the self-assessment program.
- 7. A copy of your schedule for future assessments, out to no more than two years. Include the plan/schedule for future self-assessments of the CAP, QA program, and assessment process.
Enclosure
- 8. A list of all other self-assessments completed, with a brief description. Indicate which assessments resulted in CRs for adverse findings. Please include, if appropriate, the CR number for the assessments.
CORRECTIVE ACTION DOCUMENTS
- 9. A copy of completed root cause evaluations, with a brief description of the issue and open date and date of latest status. Provide status (i.e. open, closed, deferred, etc.), if not part of the root cause package, of any actions developed as part of the evaluations and a reference to the documents and/or CRs directing and tracking the actions.
- 10. A list of completed apparent/common cause evaluations completed with a brief description of the issue and open date and date of latest status. Provide status of any actions developed (i.e. open, closed, deferred, etc.), if not part of the apparent/common cause package, and a reference, to the documents and/or CRs directing and tracking the actions. Please identify if the cause evaluations were common or, as appropriate, apparent full/detailed/in-depth or limited-scope evaluations.
- 11. A list of all open CRs sorted by significance level and then initiation date. Include each reports identification number, the date initiated, a brief description/title of the issue, system affected if any, significance level, priority level, assigned organization, and anticipated completion date, if available. Indicate if the CR was associated with a refueling outage activity.
- 12. A list of CRs closed since May 1, 2018, sorted by significance level and then initiation date. Include each documents identification number, a brief description/title, the significance level, the priority level, the date initiated and closed, assigned organization, cause codes assigned, and whether there was an associated formal operability evaluation.
- 13. A list of CRs generated by the corporate office that involve or affect Point Beachs operation, sorted by significance level. Include the date initiated, a brief description/title of the issue, other site(s) affected, system affected, significance level, status, assigned organization, and closure date or anticipated completion date, if available.
- 14. A list of completed effectiveness reviews of CR-developed remedial and corrective actions. Include a descriptive title for the review(s). Include a cross-reference to the CR(s) for which the effectiveness review was conducted and, if applicable, CR numbers documenting any additional follow-up actions.
- 15. A list of CRs initiated for identified inadequate or ineffective corrective or remedial actions. Include the date initiated, a brief description, status (i.e. open, closed, deferred, etc.), significance level of the issue, system affected, assigned organization, priority level to correct, completion/closure date or, if applicable, anticipated completion date, if available. Include a cross-reference to the CR or evaluation that generated the original corrective action.
- 16. A copy of any performance reports or indicators used to track the corrective action program effectiveness since 2016. The most recent data and 2016 and 2017 end-of-year data will suffice; monthly or quarterly reports are not required.
2
TRENDS
- 17. A list of initiated CRs that identify trends of conditions adverse to quality. Include the date initiated, a brief description, significance level, priority level for each item, and date closed or anticipated closure date.
- 18. Copies of any completed trend reports that are associated with overall CAP performance and/or effectiveness. If done on a periodic basis, provide the most recent report and end of year 2016 and 2017 reports.
OPERATING EXPERIENCE
- 19. A copy of the most recent operating experience program effectiveness review and/or assessment and/or QA audit.
- 20. A list of operating experience documents reviewed (after initial preliminary screening) and any associated resulting CRs generated. Please provide identification of the originating organization, the initiating organizations document/reference number, your identification number if different than the originators, a brief description/title of the issue, and status of the review and any developed follow-up actions. Indicate the initiation date and the closure date or the anticipated closure date if available.
SYSTEMS AND COMPONENTS
- 21. A list of the top ten risk significant systems and top ten risk significant components.
- 22. A list of operability determinations/evaluations. Include a brief description/title of the issue, date initiated, date closed or date anticipated to be closed. Include any operability evaluations that are still open.
- 23. A listing of systems and components considered Maintenance Rule (a)(1) at any time since September 1, 2016. Provide copies of the applicable maintenance rule action plans for those systems and the status of those action plans. Include dates when system/components entered (a)(1) status and, if applicable, returned to (a)(2) status.
- 24. A list of test failures (IST or Technical Specifications surveillances) with a brief description of component/system failed. Indicate if the failure was a maintenance preventable failure. Include any failures of test equipment calibrations that necessitated a review of past surveillances and/or tests. Include in the listing the CR number(s) applicable to the failures.
- 25. A list of temporary modifications with a brief description of the modification, installation date, and date closed or anticipated closure date. Include any currently open temporary modifications. Temporary modifications specific to a refueling outage and presently closed are not needed in the listing.
- 26. A list of rework items and repeat failures. Include cross-references to applicable Work Orders and CRs.
- 27. A list of plant trips, unplanned downpowers (greater than 20 percent), unplanned LCO entries (not scheduled), and any associated LERs, including dates of these events.
3
- 28. A list of open work orders/equipment work requests with a brief description. Identify the work order as outage or non-outage, the date of initiation and scheduled or anticipated closure date, if available. Also provide the classification of the work orders with the recent industry classification scheme. Provide an explanation of the classification scheme and the procedure governing the classification. Work requests/work orders not associated with a degraded equipment condition (e.g. work orders for voluntary plant upgrades or regularly scheduled surveillances and preventive maintenance) do not have to be included in the list.
- 29. A copy of any trend reports for work orders including status of preventive maintenance scheduling and deferrals. Provide the most recent trend reports and those that existed at the end-of-year 2016 and 2017; copies of monthly reports are not required. Include a copy of a recent (within two months of the data submittal) graph or document showing the status of work week planning of work activities.
- 30. A list of open procedure change requests showing initiation date, title of change or procedure title (whichever is more relevant), status, responsible department, procedure number, priority assigned, and your identification number. Please provide an explanation of your priority system for procedures and from that priority, if applicable, when the request might be completed.
- 31. A list of procedure change requests that were completed, canceled, or otherwise dispositioned since March 1, 2018. Please indicate the action taken on those requests.
Please include title, your tracking number, and the date initiated and the date closed or otherwise dispositioned.
SAFETY CONSCIOUS WORK ENVIRONMENT
- 32. Copy of the results of safety culture and/or safety conscious work environment (SCWE) surveys or self-assessments. Include any organizational effectiveness surveys conducted by internal or external organizations. Include a listing of any action(s) resulting from the survey(s) and the status of the action(s).
- 33. Safety conscious work environment issues identified through alternate avenues, such as the employee concerns programs. If issue(s) are considered sensitive, in lieu of describing issue in the data package, provide a paper copy to the lead inspector at the start of the inspection.
REGULATORY ISSUES
- 34. Copies of all causal analyses (apparent, common and/or root cause evaluations, etc.) or other evaluations initiated to address identified adverse human performance trends or safety culture adverse trends.
- 35. Copies of CRs, causal analyses (ACE, RCE or other), and corrective actions taken for issues identified in NRC findings documented in and since the fourth quarter of 2016.
Identify the status of the corrective actions and any effectiveness reviews completed or scheduled if not already included in the documents provided. Include a copy of any effectiveness reviews that were done. Include a cross-reference to the NRC identification number (report number and item number).
4
ADMIN
- 36. A copy of the latest Point Beach site organizational chart (showing names, including contractors) and a phone listing.
- 37. A list of the dates, times, and location for all scheduled meetings associated with the implementation of the CAP. Include any work order screening meetings. Please also provide the time and location of work group morning briefing meetings.
5-YEAR REVIEW
- NOTE: Requests in Items 38 through 41 refer to items and reports associated with the 125 Volt DC distribution system (batteries and chargers).
- 38. An Excel spreadsheet or equivalent sortable list of CRs associated with the above listed item(s) going back to August 1, 2013. Please indicate in the list the status of the CR (e.g. open, closed, working, etc.), initiation date, closure date, number of developed corrective actions and indication if any remain open, the classification/priority, and a descriptive title of the CR.
- 39. A copy of site performance indicators (PIs), if any, associated with the above listed item(s) going back to 2013. Only need to provide a copy of any recurring PIs for end of year documents for 2017, 2016, etc. Also include a copy of the latest PI data.
- 40. A copy of the System Health report sections, or equivalent documents, for the above listed system(s), as they were presented in the fourth quarter reports/end-of-year of each year starting in 2013 until the current date. Provide a copy of the most recent report.
- 41. A copy of any Maintenance Rule Action plans (a)(1) action plans with completion status for the above listed items, that were developed since August 1, 2013.
Documents requested to be available on-site during the inspection in either paper or electronic, with search capability (preferred) format:
- b. Technical Specifications/Bases.
- c. Procedures and procedure index.
- d. Copies of any self-assessments and associated CRs generated in preparation for this inspection.
- e. A copy of the QA manual/QA Topical Report (if not already provided as part of the data package).
- f. A list of issues brought to the ECP/ombudsman and the actions taken for resolution.
- g. A list of the codes used in the CAP and Work Orders system(s).
5
- h. A copy of the most recent monthly performance indicator document and the system health report or the equivalent documents and a copy of the equivalent documents from the end of 2017.
- i. A copy of the latest independent/offsite organization review of safety culture/safety conscious work environment and organizational effectiveness and internal equivalent assessments if not provided as part of the requested data package.
- j. A copy of the maintenance rule scoping document containing licensee-established system and/or component performance goals and criteria for moving an item into maintenance rule (a)(1) status.
OTHER On the first day of the inspection, or early on the second day, please provide the inspection team a briefing of your CAP including an overview of your actions, if any, associated with recent industry efforts to improve the efficiency of the CAP (e.g. cumulative effects/delivering nuclear promise initiative(s)/CAP2). Include your expectations for personnel using the CAP and how the work order system fits into the overall scheme for addressing identified issues. Also please demonstrate how to use a computer to access CAP data.
The lead inspector will also request to talk to/interview approximately 20 to 40 personnel, in groups of 4 to 8 individuals, to seek information about the plants SCWE. The lead inspector will randomly choose, from your furnished organization charts, people he would like to interview and provide those names and groupings to you and ask you to set up times and locations. For this the inspector will need access to organizations charts showing position titles and names. The inspector will provide his selections at least one day prior to a suggested interview date. Each interview session will last about 40 to 70 minutes; the inspector will ask you to schedule the interview sessions at least 90 minutes apart.
The inspector will ask you to refrain from debriefing personnel after the interviews; your briefing of personnel prior to the sessions is acceptable but not required. Also other team members may be talking to personnel at random throughout the plant about their perception of the sites SCWE and CAP effectiveness.
6