05000272/LER-1997-011, Forwards LER 97-011-00,re Failure to Test Isolation of SG Blowdown & Sampling Sys on Automatic Start of Afp,Per 10CFR50.73(a)(2)(ii)(A)

From kanterella
(Redirected from ML18106A217)
Jump to navigation Jump to search
Forwards LER 97-011-00,re Failure to Test Isolation of SG Blowdown & Sampling Sys on Automatic Start of Afp,Per 10CFR50.73(a)(2)(ii)(A)
ML18106A217
Person / Time
Site: Salem PSEG icon.png
Issue date: 12/19/1997
From: Bakken A
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18106A218 List:
References
LR-N970799, NUDOCS 9801050376
Download: ML18106A217 (1)


LER-1997-011, Forwards LER 97-011-00,re Failure to Test Isolation of SG Blowdown & Sampling Sys on Automatic Start of Afp,Per 10CFR50.73(a)(2)(ii)(A)
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded
2721997011R00 - NRC Website

text

.l e

OPS~G Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LER 272/97-011-00 DEC 1 9 1997 LR-N970799 SALEM GENERA TING STATION - UNIT 1 FACILITY OPERA TING LICENSE NO. DPR-70 DOCKET NO. 50-272 Gentlemen:

This Licensee Event Report entitled "Failure to Test Isolation of Steam Generator Slowdown and Sampling System on the Automatic Start of the Auxiliary Feedwater Pumps" is being submitted pursuant to the requirements of the Code of Federal Regulations 1 OCFR50.73(a)(2)(ii)(A).

C Distribution LER File 3.7 The power is in mur hands.

Sincerely, A. C. Bakken Ill General Manager -

Salem Operations I lfl/ll f I/II f llll jllllf llllf llll[lll lfl/

!/

/

I

. /

95-2168 REV. 6/94 I