05000272/LER-1980-066, Forwards LER 80-066/03L-0

From kanterella
(Redirected from ML18085A470)
Jump to navigation Jump to search
Forwards LER 80-066/03L-0
ML18085A470
Person / Time
Site: Salem 
Issue date: 01/02/1981
From: Uderitz R
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18085A472 List:
References
NUDOCS 8101090643
Download: ML18085A470 (2)


LER-1980-066, Forwards LER 80-066/03L-0
Event date:
Report date:
2721980066R00 - NRC Website

text

--~-

  • .***.ops~G:
  • Public ~~rvice Ele<;tr:ic and Gas Company 80 Park Place Newark, N.J. *07101 Phone 2011430-7000 e:;

(f) t.ri t5

. ~.*1_=*.

=-

J*anuary 2, 1981 1~

~~

l*j

-~!*~;.

{~,~~

~

~.~

co -

~;;1~~~~~

.. :::o*

er,..

Mr. Boyce H--.. Grier Director of USNRC.

. **Office of: Inspection and Enforcement*

Region l.

Dear Mr. Grier:

LICENSE NO~ DPR-7 0.

  • DOCKET NO. 50-272 REPORTABLE OCCURRENCE so:..._66/0_3L

. Pursuant to the requirements of Sa.lem Generating Station

  • This- -report. wa-8'. required within, thirty (3.0).. days

_of the* occurrence, however,~ due* to problems with the* internal:

. routing, it is; past due.

  • Measures are being taken tp correct.
  • this* deficiency.

Sincerely,

./#~~~--*

Richard ~.:Uderltz General-* Manager -:--

Nuclear ~reduction CC Director~Offica of Inspection and Enfor.ceme.nt (30 copies)'

  • _*Director, Office* of Management
Information and Program Control *
  • *,. (,3, copies).
    • ~*

,~ *_

. *~.

~ '

8rJ'0*109 C~~~- :_.' *

. s**

. \\' '.

  • -*.....:t;:
  • . *' ~
  • Rep~rt N\\lll}ber :*

Report Date:

Occurrence Date:

  • 80-66/03.

01/02/81 11/26/80 Facility:

Salem Ge erating Station, Units l and 2 Public S rvice Electric & Gas Company Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURREN E:

Exceeded Time Limit for Te :hnical Specification Surveillance CONDITIONS PRIOR TO. OCCURR '.NCE:.

Mode* 5 Cold Shutdown

- DESCRIPTION OF OCCURRENCE:

Surveillance Requirement 4 3.3.6.1 requires fire detection instruments*

to be demonstrated.operabl ! once per sixmonths by the performance of a functio::i.al test.

Survei.lance Requirement 4.3.3.6.1 requires the circuits between the fire letection instruments: and the control room to* be demonstrated operabl. ! at least once per 92 *days. *Neither of' these requirements was corr.Jleted because of an oversight by shift

.p~rsonnel~

DESIGNATION OF APPARENT CF. JSE OF OCCURRENCE:

. Personnel Error ANALYSIS OF OCCURRENCE:

Failure. to. complete the st: ~veil lance requirements could have caused a mode change delay*.

CORRECTIVE ACTION

To prevent recurrence of t 1is type of event, an entry was placed in the Night Order Log.to emf1asize *the importance of completing sur-

  • veillance tests*. in. accordc 1ce with, Technical Spec:if ication requirements. *.

FAILURE DATA:

~ot Applicable.

_Prepared _:S.y- _

  • W.. J... Stee: ~
I.<), lef~~

Manager ;,./Salem Generating Station SORC Meeting No~

I I

I