05000272/LER-1980-044, Forwards LER 80-044/03L-0

From kanterella
(Redirected from ML18082B138)
Jump to navigation Jump to search
Forwards LER 80-044/03L-0
ML18082B138
Person / Time
Site: Salem 
Issue date: 09/04/1980
From: Librizzi F
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18082B139 List:
References
NUDOCS 8009120357
Download: ML18082B138 (2)


LER-1980-044, Forwards LER 80-044/03L-0
Event date:
Report date:
2721980044R00 - NRC Website

text

Public Service Electric and Gas Company 80 Park Place Newark. N.J. 07101 Phone 201 !430-7000 Mr. Boyce H. Grier Director of USNRC September 4, 1980 Off ice of-Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

LICENSE NO. DPR-70 DOCKET NO. 50-272 REPORTABLE OCCURRENCE 80-44/03L Pursuant to the requirements of Salem Generating Station Unit No. 1 Technical Specifications, Section 6.9.1, we are submitting Licensee Event Report for Reportable Occurrence 80-44/03L.

This report is required within thirty (30) days of the occurrence.

s Sincerely yours, fa,tc.~

F. P. Librq~;i General Manager -

Electric Production CC:

Director, Office of Inspection and Enforcement (30 copies)

Director, Office of Management Information and Program Control (3 copies) 95-2001 !200M) 2-78

Report Number:

Report Date:

Occurrence Date:

80-44/03L 9/4/80 8/05/80 Facility:

Salem Generating Station, Unit 1 Public Service Electric & Gas Company Hancock's Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Containment Air Lock Inoperable CONDITIONS PRIOR TO OCCURRENCE:

Mode 1 Reactor Power 85%

DESCRIPTION OF OCCURRENCE:

During a routine containment entry, it was determined a roller was broken on the 100' elevation outer door.

Action Statement 3.6.1.3 was entered at 1550 hours0.0179 days <br />0.431 hours <br />0.00256 weeks <br />5.89775e-4 months <br /> which requires with an air lock inoperable, restore the air lock to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least hot standby within the next six hours and in cold shutdown within.the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

Equipment Failure ANALYSIS OF OCCURRENCE:

over a period of time, the roller has been hit by the door latch resulting in failure of the roller.

CORRECTIVE ACTION

The roller was replaced in kind from stock and tested satisfactorily.

The Action Statement was terminated at 1720 hours0.0199 days <br />0.478 hours <br />0.00284 weeks <br />6.5446e-4 months <br />.

FAILURE DATA:

Chicago Bridge and Iron Company containment Air Lock Prepared By M. J. Murphy SORC Meeting No.

68-80 Manage

- Salem G\\:ierating Station