05000272/LER-1979-057-01, During IE Bulletin 79-14 Insp of Pipe Hangers on Seismic I Sys,Three Hangers Found to Hve Broken Weld,Bolt & Pipe Guide.Caused by Irregular Pulsations of Charging Pump 13,stressing Supports

From kanterella
(Redirected from ML18082B108)
Jump to navigation Jump to search
During IE Bulletin 79-14 Insp of Pipe Hangers on Seismic I Sys,Three Hangers Found to Hve Broken Weld,Bolt & Pipe Guide.Caused by Irregular Pulsations of Charging Pump 13,stressing Supports
ML18082B108
Person / Time
Site: Salem PSEG icon.png
Issue date: 09/04/1980
From: Keppler A
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18082B106 List:
References
IEB-79-14, LER-79-057-01X, LER-79-57-1X, NUDOCS 8009090591
Download: ML18082B108 (2)


LER-1979-057, During IE Bulletin 79-14 Insp of Pipe Hangers on Seismic I Sys,Three Hangers Found to Hve Broken Weld,Bolt & Pipe Guide.Caused by Irregular Pulsations of Charging Pump 13,stressing Supports
Event date:
Report date:
2721979057R01 - NRC Website

text

UPDATE REPORT -

LAST REPORT Ll(.;t:.N~t:t: t:VCN I MCt"UM I

  • SUBMITTED 9/20/79

)*

~ONTR({,L BLOCK: ~

0 (PLEASE PRIN'T; OR TY.L REQUIRED INFORMATIONI

~

I NI JI s I G I s I 1 101 0 I 0 I - I 0 I 0 I 0 I 0 I 0 I - I 0 I 0 101 4 I 1 I 1 I 1 I 1 101 I I© 7

B 9

LICENSEE CODE 14 15 L.ICENSE NUMBER 25 26 LICENSE TYPE JO 57 CAT 58

~~~~~~ L:J©I o I s I o I o Io I 2 I 1 12 101 ol 9 Io I 1 11 I 9 @I a 19 I a 14 I a I a I@

60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@

CON'T

,!TII]

  • 7 8

[))JJ I During inspection of pipe hangers on Seismic I Systems in accordance with NRC IillJ CQJI]

[ffi]

((IlJ

.III2J

[]ID Bulletin 79-14, three hangers on the SI and eve Systems were found to have a broken weld, broken bolt and a broken pipe guide.

This is the first occurrence of this type.

7 8 9

  • [£TI]

7 8

SYSTEM CODE I c IB I@

9.

10

CAUSE

CAUSE COMP.

CODE SUBCODE COMPONENTCOOE SUBCOOE W@ ~@ lslulPlolRITI@ ~@)

11 12 13 18 19 SEQUENTIAL.

OCCURRENCE REPORT

~

LE R RO ['.VENT YEft.A REPORT NO.

CODE TYPE

\\:,YN~~~~~ I 71 91 I I 10 IS 17 I 1......-1 10111 L!J 21 22 23 24 26 2 7 28 29 30 VALVE SUBCODE L!J@

20 l.:=J 31 ACTION FUTURE EFFECT SHUTDOWN r:;:::..

ATTACHMENT NPA0-4 PRIME COMP.

SUPPLIER REVISION NC. w 32 COMPONENT MANUFACTURER 80 TAKEN ACTION ON PLANT METHOD HOURS ~ SUBMITTED FOAM :.UB.

LlJ@)l.!J@

~@ LLJ I o I o I o I o I l:Ll@ W@

33 34 35 36 3 7 40 41 42 Ix I 919191@

l2J@

43*

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @

44 47 [II)) I Irregular pulsations of No. 13 Charging Pump due to an inlet poppet valve failure I

  • caused additional loading on the supports which broke the pipe guide and support weld.

The sheared stud was due to an unidentified construction problem.

The O:IIl rrm DJ))

supports were repaired and a vibration damper was installed under Design Change lECS~O.

IIill The repairs were inspected inservice and found satisfactory.

7 8

9 FACIL.ITY IJcj\\

STATUS

% POWER OTHER STft.TUS \\::::J [QI] W@

ol o I ol@I.... ___

N_A __

8 9

10 12 11 44 ACTIVITY CONTENT Q\\

RELEASED OF RELEASE AMOUNT OF ACTIVITY ~

[Ifil W@ l.LJ@I NA 7

B 9

10 11 44 PERSONNEL EXPOSURES

(.;;;\\

80 METHOD OF

~

OISCOVERY DISCOVERY DESCRIPTION L£J~~l ____

N_Rc __ I_E __ B_u_1_1_e_ti_*n __ 7_9_-_1_4 _____________ ---1 45 46 45 LOCATION OF RELEASE @

NA 80 80 NUMBER

  • ATYPE

DESCRIPTION

[Ll1'] 1010 loj~L!_J@).__ ____ N~A"----------------------'

7 8

9 11 12 13

  • . PERSONNEL. INJURIES Q\\

NUMBER DESCRIPTION~

[iJil I 0 I 0 I 0 I@

NA 8

9 11

~12~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~--i80 80

. L.OSS OF OR DAMAGE TO FACILITY 143' TYPE

DESCRIPTION

~

l2JI] ~@)!'::------------------~N~A----------_...;.--------------------------------l 8

9 10.

80 PUBLICITY Q\\

ISSUEDC\\ DESCRIPTION~

NRC USE ONLY GliJ l!1_.l6~---* _____

N_A ____________

--J I I I I I I I I I I I I Ir 8

9 10 6B 69 NAi.~E OF PREPARER ____

...;A;.;.;;... _w_._Ka-=.p..::;p_l_e _______ _

PHONE:609-365-7000, Salem Ext. 628 BO ;

0 a.

  • .-**c--

.~~-

e 79-57/0lX-l

'Report Number:

Report Date:

9/4/80 Occurrence Date:

9/7/79 Facility:

Salem Generating Station, Unit 1 Public Seryice Electric & Gas Company Hancock's Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Failed Seismic I Systems Pipe Hangers CONDITIONS PRIOR TO OCCURRENCE:

Operational Mode 5 DESCRIPTION OF OCCURRENCE:

During inspection of pipe hangers on Seismic I systems in accordance with NRC Bulletin 79-14, three hangers on the Safety Injection and Chemical and Volume Control Systems were found to have a broken weld, broken bolt and a broken pipe guide.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

The broken pipe guide and the broken hanger weld were determined to be caused by unusual pulsations from No. 13 Charging Pump due to an inlet poppet valve failure causing additional loadings on these supports.

The broken bolt was due to an unidentified construction problem..

  • ANALYSIS OF OCCURRENCE:

The piping systems in which deficiencies were found and the repairs made were evaluated and included in our response to IE Bulletin 79-14.

CORRECTIVE ACTION

An inspection of the Charging Pump identified the poppet valve failure.

  • work Orders were issued to repair the deficient supports and the poppet valve.

A vibration dampener, Design Change 1EC590, was added to the system to prevent recurrence.

The repairs have been inspected in service and found to be satisfactory.

FAILURE DATA:

Pipe Hangers:

lA-SIG-213, lA-CVCS-434 and Cl4-SIG-117 Prepared By A. W. Kapple Manager JSalem Generating Station SORC Meeting No.

66-80