05000272/LER-1980-032-03, /03L-0:on 800608,while Performing Sp 4.6.1.3 on Containment Air Lock,Leak Rate Exceeded Tech Specs.Caused by Failure of Inner Door Seals to Hold Pressure.Seals Were Reversed,Adjusted & Tested Satisfactorily

From kanterella
(Redirected from ML18082A713)
Jump to navigation Jump to search
/03L-0:on 800608,while Performing Sp 4.6.1.3 on Containment Air Lock,Leak Rate Exceeded Tech Specs.Caused by Failure of Inner Door Seals to Hold Pressure.Seals Were Reversed,Adjusted & Tested Satisfactorily
ML18082A713
Person / Time
Site: Salem 
Issue date: 07/07/1980
From: Murphy M
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18082A712 List:
References
LER-80-032-03L, LER-80-32-3L, NUDOCS 8007150517
Download: ML18082A713 (2)


LER-1980-032, /03L-0:on 800608,while Performing Sp 4.6.1.3 on Containment Air Lock,Leak Rate Exceeded Tech Specs.Caused by Failure of Inner Door Seals to Hold Pressure.Seals Were Reversed,Adjusted & Tested Satisfactorily
Event date:
Report date:
2721980032R03 - NRC Website

text

NRC FORM 366"--

(7:771

......... _.,II

- ICENSEE EVENT REPORT CONTROL BLOCK: I It;\\

1!---"---.._.......... __.......___. __ ~6\\..!/

(PLEASE PRINT OR TVPE ALL REQUIRED INFORMATIONI

~

IN I J Is* I GI sl 1 l@I o I o I -I o I o I o I o I o I - I o I o IG)l4 I i I i I i I i 101 I I© 7

8 9

LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58 CON'T ITII1 7

8

~~~~~~ L1J©I al 5 I o Io I o I 2 I 1 I 210)1 o I 6 I o I 8 I 0 I o l©I o 11 I o I 1 I a I a I 0 60 61 DOCKET NUMBER 6B 69 EVEN*- 1>.-.TE 74 75 REPORT DATE 80 EVENT DE;;,cRIPTION AND PROBABLE CONSEQUENCES@

I w~ile performing Surveillance Procedure SP(O) 4.6.1.3 on the 130' containment air lock, it was determined to exceed the appropriate Technical Specification limits.

(]JI] I Action Statement 3.6.1.3 was entered at 1320 hours0.0153 days <br />0.367 hours <br />0.00218 weeks <br />5.0226e-4 months <br /> (78-58, 78-80, 79-02, 79-31, I

[ill]

[TI[]

[ili]

[))))

79-75, 80-11).

7 8 9 80 [ill]

7 B

SYSTEM CODE Is IA I@

9 10

~

LER RO CVENT YEAR

\\:..:.,J REPORT I 8 I 0 I NUMBER 21 22

CAUSE

CAUSE CODE SUBCODE COMPONENT CODE w@ w@ IP IE IN IE IT 1R 1e 11 12 13 18 SEQUENTIAL OCCUR REN CE REPORT NO.

CODE I I I 0 13 I 2 I I......-1 1° 13 I 23 24 26 27 28 29 COMP.

SUB CODE W

19 REPORT TYPE

~

30 VALVE SUBCODE

~@

20 l=J 31 PRIME COMP.

TAKEN ACTION ON PLANT METHOD HOU.RS SUBMITTED NPRD-4 FORM :;us.

SUPPLIER REVISION

  • NC.

L£J 32 COMPONENT MANUFACTURER ACTION FUTURE EFFECT SHUTDOWN

~

ATTACHMENT

~@~@) ~@ ~@ Io 1°1° I I l!J@)

33 34 35 36 37 40 41 1c I 31 i 1 o1@

~ l::.J@

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @

42 43 44 47 IJ:l)) I The inner door seals would not maintain pressure.

The seals were reversed, tested satisfactorily and Action Statement 3.6.1.2 was terminated at 2245 hours0.026 days <br />0.624 hours <br />0.00371 weeks <br />8.542225e-4 months <br />.

r::IEJ 7

B 9

BO FACILITY tJQ\\

METHOD OF A

.... ~-~~--**

STATUS

% POWER OTHER STATUS \\;;:::J ITTIJ ~@ I 0 I 0 I 0 l@I N/A I

B 9

10 12 1'3 ___

44 7

DISCOVERY DISCOVERY DESCRIPTION ~

12:.J~~l ____ s_u_r_v_e __

i_l_l_a_n_c_e __

T_e_s_t ______________._*-_.* I 45 46 80 ACTIVITY CONTENT

~

LOCATION OF RELEASE@

N/A

~*...,._,..;.. ~**.~-.

RELEASED OF RELEASE AMOUNT OF ACTIVITY rrm ~

we1 N/A 7

8 9

10 11 44 45

.,~:?E:~tfj~~..

80 PERSONNEL EXPOSURES r:::;::..

NUMBER r;;::,, TYPE

DESCRIPTION

lTIIl I o I o I oJLl.J@

N A 7

B 9 11 12 1-3--------'""'------------------------------------------------8~0 PERSONNEL INJURIES Q

NUMBER DESCRIPTION6

~I ol ol ol@) __________

~N_,___A __________________________________________ _

7 8

9 11 12 80 LOSS OF OR DAMAGE TO FACILITY '4J\\

TYPE

DESCRIPTION

~

~

~(§)1

... 0---------------~N~A-..... _______________________________________________ -'80 NRC USE ONLY 1ssu:~,.;~;:CRIPTION@.s () 0 7 J 5 qJS'l7---..

ITliJ W~I N/A I I I I I I I I I I I 1

8 91

~o ______________..;.:...;;.;.. _______________________________

~6B 69 I I!.. ~.

80 ; *=

PHONE: __

6_0_9_-_9_3_5_-_0_9_9_8 ___ _

0 Q.

I!)

NAME OF PREPARER M. J. Murphy

I Report Number:

80-32/03L Report Date:

7/07/80 Occurrence Date:

6/08/80 Facility:

Salem Generating Station Unit 1 Public Service Electric & Gas Company Hancock's Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Containment Air Lock Inoperable CONDITIONS PRIOR TO OCCURRENCE:

Mode 3 DESCRIPTION OF OCCURRENCE:

While performing a routine surveillance of the 130' containment air lock, it was determined the leak rate exceeded its Technical Specification limit of 0.05 La at a design pressure of 47.0 psig.

At 1320 hours0.0153 days <br />0.367 hours <br />0.00218 weeks <br />5.0226e-4 months <br />, Action Statement 3.6.1.3 was entered which requires with an air lock inoperable, restore the air lock to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least Hot Standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in Cold Shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

The inner door seal would not hold pressure.

ANALYSIS OF OCCURRENCE:

Upon investigation, it was determined the inner door seal was popped out of its channel so it would not maintain pressure.

CORRECTIVE ACTION

The.seals on the inner door were reversed, adjusted and tested satisfactorily.

The Action Statement was terminated at 2245 hours0.026 days <br />0.624 hours <br />0.00371 weeks <br />8.542225e-4 months <br /> on June 8, 1980.

FAILURE DATA:

Containment Personnel Air Lock Chicago Bridge and Iron Company P.repared By M. J. Murphy SORC Meeting No.

47-80 Manager - Sal~~~on