LER-1980-034, Forwards LER 80-034/03L-0
Event date:
Report date:
2721980034R00 - NRC Website

text

PS~G Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 Phone 201/430-7000 Mr. Boyce H. Grier Director of USNRC July 2, 1980 Off ice of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

LICENSE NO. DPR-70 DOCKET NO. 50-272 REPORTABLE OCCURRENCE 80-34/03L Pursuant to the requirements of Salem Generating Station Unit No. 1 Technical Specifications, Section 6.9.1, we are submitting Licensee Event Report for-Reportable Occurrence 80-34/03L.

This report is required within thirty (30) days of the occurrence.

Sincerely yours,

)>z,~-

F. P. Librizzi General Manager -

Electric Production CC:

Director, Office of Inspection and Enforcement (30 copies)

Director, Office of Management Information and Program Control (3 copies) 80011001'11 s

h

.(

95-2001 1200MI 2-78

Report Number:

Report Date:

Occurrence Date:

Facility:

I 80-34/03L 7/2/80 June 4, 1980 and June 6, 1980 Salem Generating Station Public Service Electric & Gas Hancock's Bridge, New Jersey IDENTIFICATION OF OCCURRENCE:

Failure of Meteorological Instruments CONDITIONS PRIOR TO OCCURRENCE:

Mode 1 Reactor Power 100%

DESCRIPTION OF OCCURRENCE:

Company 08038 During routin~ operations, it was determined that the 150'-33' Air Temperature ~T* had failed and Action Statement 3.3.3.4(a) was entered at 0040 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />.

With one or more required meteorological monitoring channels inoperable for more than seven days, prepared and submit a special report to the Commission.

At 1605 hours0.0186 days <br />0.446 hours <br />0.00265 weeks <br />6.107025e-4 months <br />, the Action Statement was terminated since no problem could be found and the instrument operated properly.

On June 6, 1980, the same instrument failed a second time and it was determined the sensor had failed and the Action Statement entered at 0720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br />.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

Equipment Failure.

The ~T sensor failed after extended use.

ANALYSIS OF OCCURRENCE:

Apparently the sensor failed oh June 4, 1980 and then gave indications of proper operation so that no cause for the instrument failure could be determined.

When troubleshooting the failure on June 6, 1980, it was determined the sensor had failed and needed replacement.

CORRECTIVE ACTION

On June 9, 1980, the service representative replaced all meteorological instrument sensors and they were tested satisfactorily.

The Action Statement was terminated on June 9, 1980 at approximately 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br />.

An inspection order has been submitted to have all the sensors replaced on an annual basis in the future.

LER 80-34/03L FAILURE DATA:

Climet Sensor Model 015-3X3 I

Prepared J?y M. J. Murphy SORC Meeting No.

45-80 2 -