05000272/LER-1980-019, Forwards LER 80-019/03L-0

From kanterella
(Redirected from ML18082A397)
Jump to navigation Jump to search
Forwards LER 80-019/03L-0
ML18082A397
Person / Time
Site: Salem PSEG icon.png
Issue date: 05/12/1980
From: Librizzi F
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18082A398 List:
References
NUDOCS 8005150455
Download: ML18082A397 (3)


LER-1980-019, Forwards LER 80-019/03L-0
Event date:
Report date:
2721980019R00 - NRC Website

text

J.-~*

(-,.. PS~G

  • s u o s 1 s o -rs s

...s Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 Phone 201 430-7000 May 12, 1980 Mr. Boyce H. Grier Director of USNRC Off ice of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

LICENSE NO. DPR-70 DOCKET NO. 50-272 REPORTABLE OCCURRENCE 80-19/03L Pursuant to the requirements of Salem Generating Station Unit~No. 1 Technical Specifications, Section 6.9.1, we are submitting Licensee Event Report for Reportable Occurrence 80-19/03L.

This report is required within thirty (30) days of the occurrence.

Sincerely yours,

'J

/ft>'{LI;__

~*rv----

F. P. Librizzi General Manager -

Electric Production CC:

Director, Office of Inspection and Enforcement (30 copies)

Director, Office of Management Information and Program Control

( 3 copies) u:11csor s1:1111n:

Report Number:

Report Date:

Occurrence Date:

Facility:

80-19/03L 5/12/80 4/09/80 Salem Generating Station Public Service Electric & Gas Company Hancock's Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Missed Surveillance on Rod Position Indicators CONDITIONS PRIOR TO OCCURRENCE:

Unit operating at 100% reactor power with an electrical output of 1140 MWe gross.

DESCRIPTION OF OCCURRENCE:

At 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> on April 9, 1980, the control rod positions were not logged in accordance with Technical Specification surveillance 4.1.3.1.1.

The surveillance states that the position of each full length rod shall be determined to be within the group demand limit by verifying the individual rod positions at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> except during time intervals when the rod position deviation monitor is inoperable, then verify the group positions at least once per four hours.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

Personnel error.

During.the. routine shift activities, the control operator forgot to take the readings.

ANALYSIS OF OCCURRENCE:

Readings were taken at 0800 and 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> on April 9, 1980, with all readings within specification

(~ 12 steps).

The rod position deviation alarm was out of service for an extended period of time.

CORRECTIVE ACTION

The operators were reinstructed on the need to follow surveillance procedures.

~

The log form will be reviewed and revised where necessary to group together the readings taken that are required by Technical Specifi-cations.

Emphasis will then be placed on the readings to ensure our compliance with the Technical Specifications.

LER 80-19/03L 2 -

FAILURE DATA:

None Prepared By~~-M~*_::J~*~M~u~r~p~h~Yr__~~

Manager -

Station SORC Meeting No.

30-80

~~-=--=-=--~~~-

j