05000272/LER-1980-010-03, /03L-0:on 800206,while Reviewing Procedure,Found That,During Load Test on Manipulator Crane Prior to Fuel Movement on 790425,test of 3,220 Lbs Performed Instead of 3,250 Lbs Per Tech Spec.Procedure Will Be Revised

From kanterella
(Redirected from ML18081B160)
Jump to navigation Jump to search
/03L-0:on 800206,while Reviewing Procedure,Found That,During Load Test on Manipulator Crane Prior to Fuel Movement on 790425,test of 3,220 Lbs Performed Instead of 3,250 Lbs Per Tech Spec.Procedure Will Be Revised
ML18081B160
Person / Time
Site: Salem PSEG icon.png
Issue date: 03/03/1980
From: Murphy M
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18081B159 List:
References
LER-80-010-03L, LER-80-10-3L, NUDOCS 8003060603
Download: ML18081B160 (1)


LER-1980-010, /03L-0:on 800206,while Reviewing Procedure,Found That,During Load Test on Manipulator Crane Prior to Fuel Movement on 790425,test of 3,220 Lbs Performed Instead of 3,250 Lbs Per Tech Spec.Procedure Will Be Revised
Event date:
Report date:
2721980010R03 - NRC Website

text

(7-77.l~ _,

- LICENSEE EVENT REPORT

.____.._ _ _._______._ _ _.l _ _.l _ _.l G)

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 6 CONTROL BLOCK:

~IN IJ Is I GI sl1 101 01 ol -I ol ol ol ol ol -1 ol olG)l4 7

8 9

LICENSEE CODE 14 15 LICENSE NUMBER 25 26 I i I i I i I i 101 I I 0 LICHJSE TYPE JO 57 CAT 58 CON'T

~~:~~~ UJ©I ol 5 I o Io I o I 2 I 1 I 2 101 o I 2 I o I 6 I 8 60 61 DOCKET NUMBER 68 69 EVENT DATE fil::Q 7

8 o !©lo I 3 lo I 3 Is I a IGY 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@

~

I

- When performing a load test on the manipulator crane prior to fuel movement on April 25, 1979, a test of 3220 pounds was performed instead of 3250 as required by Technical Specification 4.9.6.1.

In reviewing the procedure used for revision, it was determined the procedure's limit did not comply with Tech. Specs.

The refueling operation was completed without incident involving the manipulator [TITI

~' __

c_r_a_n_e_. __

(_7_6_-_0_3_,_._7_8_- 21, 7 8-81)

[ill]

7 8

9 SYSTE.\\1

CAUSE

COOE CODE 02]

I Fl nl@ LE.J@

B 9

10 11 LER RJ CVENT YE.A.A REPORT I 8 I 0 I l.=.l NU~*'BEP 21 22 23

CAUSE

SUBCODE

~@

12 13 SEQUENTIAL REPORT NO.

lo I ii o I 24 26 COMPONENT CODE Pl EjN IE IT !RI~

18 OCCURRENCE CODE I 01 3 I 27 28 29 CO~'P.

VALVE SUB CODE SUBCODE

~@ ~@

19 20 REPORT TYPE LlJ 1=J 30 31 ACTION FUTURE EFFECT SHUTDOWN

(.:;:;\\

ATrACHMENT NPRD-4 PRIME C0~1P.

SUPPL! ER REVIS IOI*,

NC.

L2J 32 cor.. 1Por..:E~..:T MANUFACTURER BO TAKE'*

ACTION ON PLANT METHOD HOURS ~ SUBMITTED FORM ~UB.

w@w@ L!J@

~ 10101010 1 ~@ l2'.J 33 34 35 36 3 7 40 41 42

~@ I s1 3 I 9 I 21@

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @

43 44 47 J

The procedure used for load testing did not correctly specify the load test requirements.

The procedure required a test to a load of 3250 + 0 -

50 pounds, instead of at least 3250 pounds.

The procedure will be revised prior to any [IE]

,8 9

80 F.ACILITY STATUS OTHER STATUS METHOD OF

(':;:)\\

[QI] lli.J@ I 0 l 0 l 0 '~I __

N_,_/A __

DISCOVERY DISCOVERY DESCRIPTION 0

~GJ)~l __ P_r_o_c_e_d_u_r_e_R_e_v_i_e_w ____________ _,

8 9

10 12 13 44 ACTIVITY CONTENT

(.;';;-\\

RELEASED OF RELEASE AMOUNT OF ACTIVITY~

~

~ 0 W§.._I _____

N-'-/_A __

8 9

10 11 44 PERSONNEL EXPOSURES

(.;;:\\

45 46 45 LOCATION OF RELEASE@

N/A 80 80 [i]2J NUMBER r:;:;-., TYPE

DESCRIPTION

ol ol oj(0~@).__ __ ~N~A=------------------------'

8 9

11 12 13 80 PERSONNEL INJURIES

(;';\\

NUMBER DESCRIPTION~

[2:]Z]

ol ol ol@).__ ____ ~N~A'-'-------------------------'

8 9

11 12 LOSS OF OR DAMAGE TO FACILITY f'4:3\\

TYPE

DESCRIPTION

~

80 N A EE]~@

8 91

~0:----------------'----------------------------------....... BO.

PUBLICITY Q\\

8 0 ISSUEDQ DESCRIPTION~

0 3 ij ~o. 6 0 3 NRC USE ONL y I2TIJ w~

N A u

l 1 1 1 1 1 1 1 1 1 1 1 1 ~

8 9

10 6 8 6 9 80 c;;

NAME OF PREPAR.ER ___

M_._J_. _M_u_r=.p_h.,;.y _________ _

PHONE:~~-6_0_9_-_9_3_5_-_0_9_9_8~~~~

0

0.

\\!)