Forwards LER 80-010/03L-0
ML18081B158
Person / Time
Site: Salem PSEG icon.png
Issue date: 03/03/1980
From: Librizzi F
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18081B159 List:
References
NUDOCS 8003060596
Download: ML18081B158 (2)


LER-1980-010, Forwards LER 80-010/03L-0
Event date:
Report date:
2721980010R00 - NRC Website

text

PS~G Public Service Electric and Gas Company 80 Park Place Newark, N J. 07101 Phone 201 '430-7000 Mr. Boyce H. Grier Director of USNRC Office of Inspection and Enforcement Region 1 631 Park Avenue March 3, 1980 King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

LICENSE NO. DPR-70 DOCKET NO. 50-272 REPORTABLE OCCURRENCE 80-10/03L Pursuant to the requirements of Salem Generating Station Unit No. l Technical Specifications, Section 6.9.1, we are submitting Licensee Event Report for Reportable Occurrence 80-10/03L.

This report is required within thirty ( 3 0) days o*f the occurrence.

Sincerely yours,

-] !_ (,._____ ~?-.-1---y,;--*

. b

J F. P. Li r1zz1 General Manager -

Electric Production CC:

Director, Office of Inspection and Enforcement (30 copies)

Director, Office of Management Information and Program Control

( 3 copies) 11:\\llSOI su1111*1.

qi; ?nn1 1*;nnr-..11 *) 7R

Report Number:

80-10/03L Report Date:

3/3/80 Occurrence Date:

2/6/80 Facility:

Salem Generating Station Public Service Electric & Gas Company Hancock's Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Missed Manipulator Crane Surveillance (T.S. 4.9.6.1)

CONDITIONS PRIOR TO OCCURRENCE:

Mode 6 prior to Fuel Movement DESCRIPTION OF OCCURRENCE:

While reviewing Maintenance Department Procedure M2F, Manipulator Crane Pre-Operational Inspection and Operational Tests, it was noted the specification for the load test was stated as 3250 + 0 -

50 pounds.

The Technical Specification surveillance requirement is for the crane to be tested within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to the start of fuel movement at a test load of at least 3250 pounds.

A review of the surveillance performed prior to fuel movement on April 25, 1979, indicated the crane was tested to 3220 pounds, 30 pounds less than the test requirement.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

The cause appears to be a typographical error when the procedure was originally typed.

The initial review did not find the error.

The procedure should have been written 3250 -

0 + 50 pounds, not 3250 + 0 50 pounds as was written.

ANALYSIS OF OCCURRENCE:

The surveillance requirement was met with regard to the manipulator crane being tested within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> of fuel movement, but the load test was not of a sufficient weight.

The refueling evolution has been completed without incident involving the manipulator crane.

CORRECTIVE ACTION

The procedure M2F is being revised to ensure a load test of at least 3250 pounds will be completed and will be used on all subsequent load tests.

FAILURE DATA:

Not Applicable Prepared by M. J. Murphy Manage~Salem Generating Station SORC Meeting No.

13-80