05000272/LER-1979-013-04, /04L on 790102:non-radioactive Waste Effluent Total Suspended Solids Exceeded Tech Specs.Caused by Abnormally High Number of Demineralized Regenerations Supporting Initial Flushes for Startup Preparation

From kanterella
(Redirected from ML18078A795)
Jump to navigation Jump to search
/04L on 790102:non-radioactive Waste Effluent Total Suspended Solids Exceeded Tech Specs.Caused by Abnormally High Number of Demineralized Regenerations Supporting Initial Flushes for Startup Preparation
ML18078A795
Person / Time
Site: Salem 
Issue date: 01/31/1979
From: Kapple A
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18078A793 List:
References
LER-79-013-04L, LER-79-13-4L, NUDOCS 7902020221
Download: ML18078A795 (1)


LER-1979-013, /04L on 790102:non-radioactive Waste Effluent Total Suspended Solids Exceeded Tech Specs.Caused by Abnormally High Number of Demineralized Regenerations Supporting Initial Flushes for Startup Preparation
Event date:
Report date:
2721979013R04 - NRC Website

text

---.lr.1 i

i Report Number:

79-13/04L Report Date:

01-31-79 Occurrence Date:

1-02-79 Facility:

Salem Generating Station Public Service Electric & Gas Company Hancock's Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Non-Radioactive W~ste Effluent Total Suspended Solids Exceeded Environ-mental Technical Specification Limit CONDITIONS PRIOR TO OCCURRENCE:

- Not Applicable DESCRIPTION OF OCCURRENCE:

During preparation of the annual non-radioactive environmental operating report, the average annual (1978) suspended solids concentration in the discharge from the non-r~dioactive waste basin was calculated to be 34.7 mg/l.

This exceeds the Environmental Technical Specification limit of 25 mg/l.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE: ~

The cause of this occurrence was ~ramlly hi~n number of demin-eralized regenerations necessary o support the~~initial flushes required for Unit 2 startup preparation and service water quench for steam genera tor bl.owdown which was used for part of 19 7 8.

ANALYSIS OF OCCURRENCE.:

Not Applicable

CORRECTIVE ACTION

During 1979, a clarifier will be in operation in the station deminer-alizer system which will reduce the number of regeneration cycles.

Design change has been submitted to modify the non-radioactive waste retention basin to allow more suspended solids to settle out before the waste water enters the treatment basin.

FAILURE DATA:

Not Applicable Prepared by A. W. Kapple Manager -,,Salem Generating Station SORC Meeting No.

6-79 79020202~l

- 1