NRC-006C United States Nuclear Regulatory Commission Official Hearing Exhibit

          • In the Matter of: NORTHWEST MEDICAL ISOTOPES, LLC (Medical Radioisotope Production Facility)

Commission Mandatory Hearing

~ ~:

. *. * . * . NORTHWEST MEDICAL ISOTOPES Docket #: 05000609 Exhibit #: NRC-006C-MA-CM01 Identified: 1/23/2018 Admitted: 1/23/2018 Withdrawn:

Chapter 3.0 - Design of Structures, Systems, and Components Rejected: Stricken:

Construction Permit Application for Other:

Radioisotope Production Facility NWMl-2013-021, Rev. 3 September 2017 Prepared by:

Northwest Medical Isotopes, LLC 815 NW gth Ave , Suite 256 Corvallis, Oregon 97330

This page intentionally left blank.

.**.* ....*.*. NWMI

        • ~

~* *~ NOmfWUT MfOICAL ISOTOPES NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures , Systems and Components Chapter 3.0 - Design of Structures, Systems, and Components Construction Permit Application for Radioisotope Production Facility NWMl-2013-021, Rev. 3 Date Published:

September 5, 2017 Document Number. NWMl-2013-021 I Revision Number. 3

Title:

Chapter 3.0 - Design of Structures, Systems and Components Construction Permit Application for Radioisotope Production Facility Approved by: Carolyn Haass Signature:

c~41+- (_ -;/~

NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components This page intentionally left blank.

  • ~~..::...NWMI
~
    • *
  • NOlmfWEST MEDtCAl lSOTOf"ES NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components REVISION HISTORY Rev Date Reason for Revision Revised By 0 6/29/2015 Initial Application Not required 1 6/26/2017 Incorporate changes based on responses to NRC C. Haass Requests for Additional Information 2 8/5/2017 Modifications based on ACRS input C. Haass Incorporate final comments from NRC Staff and ACRS ;

3 9/5/2017 C. Haass full document revision

  • i*~~";' NWMI NWMl-2013-021 , Rev. 3

~** ~ . NORTMWEST MEOtcAL tSOlDPH Chapter 3.0 - Design of Structures, Systems and Components This page intentionally left blank.

  • ~*:~°:' NWM I

...... NWMl-2013-021, Rev . 3 Chapter 3.0 - Design of Structures, Systems and Components

~* * ~ . NORTHWUT MEDICAi. ISOTOPES CONTENTS 3.0 DESIGN OF STRUCTURES, SYSTEMS, AND COMPONENTS ............... .. ... .. .. .. .... .... ........ .... 3-1 3 .1 Design Criteria ........... ........................................................................... .... ...... ........... .... .. .. 3-4 3.1.1 Radioisotope Production Facility Structures, Systems, and Components ... ..... .... 3-4 3.1 .2 Code of Federal Regulations ........... .. ............ .. .. ... ........... ..................................... 3-8 3.1 .3 U.S . Nuclear Regulatory Commission ....................................................... .. ........ 3-8 3.1.4 Other Federal Regulations, Guidelines, and Standards ........ ..... ........ .. .. ... ..... ..... 3-10 3.1.5 Local Government Documents ..... ...... .. .............. ............. .... ............ ..... ........... .. 3-10 3.1.6 Discovery Ridge/University of Missouri ........ ........ ...... .............. ....................... 3-11 3 .1 .7 Codes and Standards ... .. ........ ....... ............... ......... ................... .......... .. ..... ... .... ... 3-12 3.2 Meteorological Damage .. .... .... ... ..... ............ .. ..................... .............. ..... ....... .. ... .. ... ... .... ... 3-24 3.2.l CombinationsofLoads ......... ....... ... ....... ... ............................... ... .. ... ... ............ ... 3-25 3.2.1.1 Nuclear Safety-Related Structures, Systems, and Components ....... . 3-26 3.2.1 .2 Commercial and Nuclear Non-Safety-Related Structures, Systems, and Components .. .. ................... ........................................ . 3-26 3.2.2 Combinations for Serviceability Based Acceptance Criteria .. .... ....................... 3-27 3.2.3 Normal Loads ......... ...................................................................... .. .......... ........ .. 3-27 3.2.4 Wind Loading ...... .............. .. ........ .......... .... ....... ...... .. ... .... ............ ............. ...... ... 3-30 3.2.4.1 Wind Load ... ...... ...... ............ ........ ... ... ............ ................................. ... 3-30 3.2.4.2 Tornado Loading .................. ... ........ ... .. .... .... ... ..... .. .. ........ ... ........... .. . 3-30 3.2.4.3 Effect of Failure of Structures, Systems, or Components Not Designed for Tornado Loads... .... ..... ...... .... ..... .. ... ....... ....... ... .... ... .... ... 3-32 3.2.5 Rain, Snow, and Ice Loading ..... ................ .. ... ..... .... ...... .. ...................... ..... .. ... .. 3-33 3.2.5 .1 Rain Loads ........ ....... .... ... .................................... ... ....... ... ... ... .... .... ... 3-33 3.2.5.2 Snow Load ..... .. ........ ................. .... ...... .. ................. ... ...... .... .... .......... 3-33 3.2.5.3 Atmospheric Ice Load .......................... ............. .. ... ............ .. ... .......... 3-35 3.2.6 Operating Thermal/Self-Straining Loads ........... .. ..... .... ....... ... .. .. ... .................... 3-35 3.2.7 Operating Pipe Reaction Loads ................. ........ ..... ... ....... .... ... ...... ...... ..... .. ... .. ... 3-35 3.2. 8 External Hazards ...... ............. .............. .. ..... .. ... .... ....................... ... .... .. ........ .... ... 3-35 3.3 Water Damage ....... .... .. .... .. ..... .......... .. ... ..... ........ .. .. .............................. ... ... ....... ... ... .. ..... .. 3-36 3.3. J Flood Protection .................................. ... ...... ..... ..... ... .... ... ... ............................ .. . 3-36 3.3.1.1 Flood Protection Measures for Structures, Systems, and Components ...... ........................... ....... ... ...... .... .... ... ... .. ..... .............. .. . 3-36 3.3.1.2 Flood Protection from External Sources ... .... ................................... .. 3-37 3.3.1 .3 Compartment Flooding from Fire Protection Discharge ..... ..... .......... 3-38 3.3.1.4 Compartment Flooding from Postulated Component Failures ... .. .... .. 3-38 3 .3 .1 .5 Permanent Dewatering System ... ............................. .. .... .... .. .... ... ... .... 3-3 8 3.3.1.6 Structural Design for Flooding .... .................... ......................... .. .. ..... 3-38 3.4 Seismic Damage .......................................... .. ......... ..... ... ... ........ ..... .................. .. .. .......... .. 3-39 3.4. l Seismic Input ..... .... .............. .. .......... ......... ........ .... ...... .. ........ ........ .. ... ...... .. ... ... ... 3-39 3.4.1 .1 Design Response Spectra ...... ..... ..... ............ .. ......... ... .......... .. ...... ... .. . 3-39 3 .4.1 .2 Method of Analysis .. ... ................... .. ... ............ .. .. .................... ... .. ... .. 3-40 3.4.2 Seismic Qualification of Subsystems and Equipment .......... .................. ... .. ... ... . 3-41 3.4.2.1 Qualification by Analysis ........ ... .. .......... .. .... ... ..... .. ............ .. ... .. ... .. ... 3-41 3 .4.2.2 Qualification by Testing ................ .. .... .. ....... .. ... .. ... ... .............. .......... 3-42 3 .4.3 Seismic Instrumentation ......... ... ... .......... ....... ... ... .................. .. ... ... .. .. .. .. ....... ...... 3-42 3.4.3.1 Location and Description ..................... ........ .. .. ... .......... .. ....... ... .. ...... 3-43 3.4.3.2 Operability and Characteristics ......... .. ..... .. ... ........... ..... ... ......... ........ 3-43 3-i

  • i*:~*:* NWM I

..*... NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

' ~* *~ . NOITHWUT MEOtCAl ISOTOP£S 3.5 Systems and Components ............. .............................. .. ........ .. .... .... ...... ............. ............ ... 3-44 3.5.1 General Design Basis Information .................. .. ................. ... .............. ...... ...... .... 3-44 3.5.1 .1 Classification of Systems and Components Important to Safety ..... ... 3-44 3 .5 .1 .2 Classification Definitions .................................. .. ...... ........ .. ........ .... .. 3-44 3 .5 .1 .3 Nuclear Safety Classifications for Structures, Systems, and Components ....... ... ........... .. .. ... ....................... ............ ........................ 3-45 3.5.2 Radioisotope Production Facility ........ ..................................................... .......... 3-47 3.5.2.1 System Classification ........................................................................ 3-53 3.5.2.2 Classification of Systems and Components Important to Safety ...... 3-53 3.5.2.3 Design Basis Functions, Values, and Criteria ................................... 3-55 3.5.2.4 System Functions/Safety Functions .................................................. 3-55 3.5.2.5 Systems and Components ................................................................. 3-55 3.5.2.6 Qualification Methods ....................................................................... 3-56 3.5 .2.7 Radioisotope Production Facility Specific System Design Basis Functions and Values ........................................ ................................ 3-56 3.6 References .............. .............. ......... ...... ..................... .. ......... .... ... .... .... .... ...... ... .... ... ....... ... 3-67 3-ii

......  ; NWMI

        • Chapter 3.0 - Design of Structures, Systems and Components NWMl-2013-021, Rev. 3

' ~* *~ . NOflTHWUT MEOtCAl ISOTOPH TABLES Table 3-1. List of System and Associated Systems and Construction Permit Application Crosswalk (2 pages) ... .... ................... ....... ... .. ......... ... .. ..... ... ... ... ... ... .... .............. .. ... .. ..... ... 3-4 Table 3-2. Summary of Items Relied on for Safety Identified by Accident Analyses (3 pages) ..... .... .. ........ ... .. .... ... ............. .......... ... .... ...... ..... .... ... .. ... ... ... .. .. .. .............. ...... ....... 3-5 Table 3-3. Relevant U.S. Nuclear Regulatory Commission Guidance (3 pages) ... ..... ... .. ......... ... ... .. 3-8 Table 3-4. Other Federal Regulations, Guidelines, and Standards .. .............. ..... .. ..... .. ... .. ... .. ......... . 3-10 Table 3-5. Local Government Documents (2 pages) ............... ..... ... ......... ........ ... ..... ...... ........ ....... .. 3-11 Table 3-6. Discovery Ridge/University of Missouri Requirements ..... .. .... ... .... ...... ........... ...... ..... .. 3-11 Table 3-7. Design Codes and Standards ( 12 pages) ....... ..... ... ..... .. ....... ... ... .. ........ .. ..... ........ .... .... .... 3-12 Table 3-8. Load Symbol Definitions (2 pages) .... .. ....... .. ........... .... ...... .. .... ....... ...... ...... ... ...... .... ..... 3-24 Table 3-9. Load Combinations for Strength Based Acceptance Criteria, Nuclear Safety-Related .... ... .. ....... .......... ............. ..... .. .. .. .. ............ ....... ........... .... .. ..... .. .............. .............. 3-26 Table 3-10. Load Combinations for Strength Base Acceptance Criteria, Commercial ........ ............ 3-27 Table 3-11. Load Combinations for Serviceability Based Acceptance Criteria .. ... ....... .. ....... .. .. ..... .. 3-27 Table 3-12. Lateral Earth Pressure Loads ........ .... .. ..... ............... ..... ... ... ... .... .... ... ... ...... .. ........ .. ...... ... 3-28 Table 3-13. Floor Live Loads .... .... ... ...... .... ..... ......... .... .. .............. ......... ...... ........ ....... .. .... ... .... .. ....... . 3-29 Table 3-14. Crane Load Criteria ... .. ........ ........ ...... ..... ..... .. .. ... ... ..... .... .... ........... .... ........ ..... ... ............ 3-29 Table 3-15. Wind Loading Criteria ..... .... ....... .. .... ............ .... .. .... .. ... ... ................. ... ... .... ... ...... .... .... ... 3-30 Table 3-16. Design-Basis Tornado Field Characteristics ..... .... .. ...... .......... ..... ...... .... .... .. .. ........... .. ... 3-31 Table 3-17. Design-Basis Tornado Missile Spectrum ... ....... .............................. .. ................. ........ .. .. 3-32 Table 3-18. Rain Load Criteria ........ .. .. ... .......................................... ............. ... .. ... ... ..... .. ... .. .... ..... .. . 3-33 Table 3-19. Snow Load Criteria .... ...... ............. ... ..... ....... .. ...... ...... ...... ... .. ... ...... .. ... ... .. ....... ... ... ....... .. 3-34 Table 3-20. Extreme Winter Precipitation Load Criteria ........ ..... ...... .. ... ....... ........ ... ............ ..... ..... .. 3-34 Table 3-21. Atmospheric Ice Load Criteria ...................... ...... ... .. ....... ... .... ... .. .. ........ ... ....... .. .... ... .... .. 3-35 Table 3-22. Design Criteria Requirements (4 pages) .... ......... .. .. ..... .... ... ...... ...... .. ................. .... ........ 3-48 Table 3-23. System Classifications ...... ... ................ ... .......... ........... .. .. ..... .... ... .. .... ........ .... .......... .. .... 3-53 Table 3-24. System Safety and Seismic Classification and Associated Quality Level Group (2 pages) ..... ..... .................................. .... .......... .. .. .. ... .. .. ..... .. ............. ............. ... ......... ..... 3-53 Table 3-25. Likelihood Index Limit Guidelines .. .......... ........ ..... .... ...... ................. .... ........... ... .. ... ..... 3-54 3-iii

...NWMI

~ * *! NOmfWUT MlDlCAL lSOTOPU NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components TERMS Acronyms and Abbreviations 99 Mo molybdenum-99 AASHTO American Association of State Highway and Transportation Officials ACGIH American Conference on Governmental Industrial Hygienists ACI American Concrete Institute AHRI Air Conditioning, Heating and Refrigeration Institute AISC American Institute of Steel Construction ALARA as low as reasonably achievable AMCA Air Movement and Control Association ANS American Nuclear Society ANSI American National Standards Institute ASCE American Society of Civil Engineers ASHRAE American Society of Heating, Refrigeration, and Air-Conditioning Engineers ASME American Society of Mechanical Engineers ASNT American Society for Nondestructive Testing ASTM American Society for Testing and Materials AWS American Welding Society BMS building management system CDC Centers for Disease Control and Prevention CFR Code of Federal Regulations CRR Collected Rules and Regulations CSR Missouri Code of State Regulations Discovery Ridge Discovery Ridge Research Park DBE design basis event DBEQ design basis earthquake DOE U.S. Department of Energy EIA Electronic Industries Alliance ESF engineered safety feature FEMA Federal Emergency Management Agency FPC facility process control FSAR final safety analysis report Hz hydrogen gas HR hydrometeorological report HV AC heating, ventilation, and air conditioning l&C instrumentation and control IAEA International Atomic Energy Agency IBC International Building Code ICC International Code Council ICC-ES International Code Council Evaluation Service IEEE Institute of Electrical and Electronics Engineers IES Illuminating Engineering Society IFC International Fire Code IROFS items relied on for safety ISA International Society of Automation ISG Interim Staff Guidance IX ion exchange LEU low enriched uranium MDNR Missouri Department of Natural Resources Mo molybdenum 3-iv

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components MO DOT Mi ssouri Department of Transportation MRI mean recurrence interval MU University of Missouri MURR University of Missouri Research Reactor NECA National Electrical Contractors Association NEMA National Electrical Manufacturers Association NEP normal electrical power NESHAP National Emissions Standards for Hazardous Air Pollutants NETA InterNational Electrical Testing Association NFPA National Fire Protection Association NIOSH National Institute for Occupational Safety and Health NOAA National Oceanic and Atmospheric Administration NRC U.S. Nuclear Regulatory Commission NS non-seismic NSR non-safety-related NWMI Northwest Medical Isotopes, LLC NWS National Weather Service PMF probable maximum flood PMP probable maximum precipitation PMWP probable maximum winter precipitation QA quality assurance QAPP quality assurance program plan RCA radiologically controlled area RPF Radioisotope Production Facility SEP standby electrical power SMACNA Sheet Metal and Air Conditioning Contractors National Association SNM special nuclear material SR safety related SSC structures, systems and components TIA Telecommunications Industry Association U.S . United States UL Underwriters Laboratory UPS uninterruptible power supply USGS U.S. Geological Survey Units oc degrees Celsius Of degrees Fahrenheit

µ micron cm centimeter cm 2 square centimeters ft feet ft 2 square feet ft 3 cubic feet g acceleration of gravity gal gallon hp horsepower hr hour

m. inch in. 2 square inch kg kilogram 3-v

....;:..NWMI

  • * ~~.*-~
  • NOfl111WHT MEDICAL lSOTDP£S NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components kip thousand pounds-force km kilometer kW kilowatt L liter lb pound

!bf pound-force m meter m2 square meter nu mile mi 2 square mile mm minute MT metric ton rad absorbed radiation dose sec second 3-vi

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components 3.0 DESIGN OF STRUCTURES, SYSTEMS, AND COMPONENTS This chapter identifies and describes the principal architectural and engineering design criteria for the facility structures, systems and components (SSC) for the Northwest Medical Isotopes, LLC (NWMI)

Radioisotope Production Facility (RPF). The information presented emphasizes the safety and protective functions and related design features that help provide defense-in-depth against the uncontrolled release of radioactive material to the environment. The bases for the design criteria for some of the systems discussed in this chapter are developed in other chapters of the Construction Permit Application and are appropriately cross-referenced, when required.

NWMI's RPF design is based on applicable standards, guides, codes, and criteria and provides reasonable assurance that the RPF SSCs, including electromechanical systems, are:

  • Built and will function as designed and required by the analyses in Chapter 13.0, "Accident Analysis"
  • Built to have acceptable protection of the publi c health and safety and environment from radiological risks (e.g., radioactive materials, exposure) resulting from operations
  • Protected against potential meteorological damage
  • Protected against potential hydrological (water) damage
  • Protected against seismic damage
  • Provided surveillance activities and technical specifications required to respond to or mitigate consequences of seismic damage
  • Based on technical specifications developed to ensure that safety-related functions of electromechanical systems and components will be operable and protect the health and safety of workers, the public, and environment The design of the RPF and SSCs are based on defense-in-depth practices.

The NRC defines design-in-depth as the following:

An approach to designing and operating nuclear facilities that prevents and mitigates accidents that release radiation or hazardous materials. The key is creating multiple independent and redundant layers of defense to compensate for potential human and mechanical failures so that no single layer, no matter how robust, is exclusively relied upon.

Defense in depth includes the use of access controls, physical barriers, redundant and diverse key safety functions, and emergency response measures.

Defense-in-depth is a design philosophy, applied from the outset and through completion of the design, that is based on providing successive levels of protection such that health and safety are not wholly dependent on any single element of the design, construction, maintenance, or operation of the facility.

The net effect of incorporating defense-in-depth practices is a conservatively designed facility and systems that exhibit higher tolerances to failures and external challenges. The risk insights obtained through performance of accident analysis can then be used to supplement the final design by focusing attention on the prevention and mitigation of the higher risk potential accidents.

3-1

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures , Systems and Components This application to the U.S. Nuclear Regulatory Commission (NRC) seeks to obtain a license for a production facility under Title 10, Code of Federal Regulations (CFR), Part 50 (10 CFR 50), "Domestic Licensing of Production and Utilization Facilities ." Embedded in the 10 CFR 50-licensed facility will be several activities subject to 10 CFR 70, "Domestic Licensing of Special Nuclear Material," to receive, possess, use, and transfer special nuclear material (SNM) and 10 CFR 30, "Rules of General Applicability to Domestic Licensing of Byproduct Material," to process and transport molybdenum-99 (99 Mo) for medical applications.

Thjs IO CFR 50 li cense application for the RPF follows the guidance in NUREG-1537, Guidelines for Preparing and Reviewing Applications for the Licensing of Non Power Reactors - Format and Content, that encompasses activities regulated under different NRC requirements (e.g., l 0 CFR 70 and 10 CFR 30), in accordance with 10 CFR 50.31 , "Combining Applications," and 10 CFR 50.32, "Elimination of Repetition."

The NRC has determjned that a radioisotope separation and processing facility, which also conducts separation of SNM, will be considered a production facility and as such, will be subject to licensing under 10 CFR 50. The operation of the NWMI RPF will primarily be focused on the disassembly of irradiated low-enriched uranium (LEU) targets, separation and purification of fission product 99 Mo, and the recycle of LEU that is licensed under I 0 CFR 50.

RPF operations will also include the fabrication of LEU targets, which will be licensed under 10 CFR 70.

These targets will be shipped to NWMI's network of research or test reactors for irradiation (considered a connected action) and returned to the RPF for processing. The LEU used for the production of LEU target materials will be obtained from the U.S. Department of Energy (DOE) and from LEU reclaimed from processing the irradiated targets.

NWMI's licensing approach for the RPF defines the following unit processes and areas that fall under the following NRC regulations:

  • I 0 CFR 50, "Domestic Licensing of Production and Utilization Facilities" Target receipt and di sassembly system Target dissolution system Molybdenum (Mo) recovery and purification system Uranium recovery and recycle system Waste management system Associated laboratory and support areas
  • I 0 CFR 70, "Domestic Licensing of Special Nuclear Material" Target fabrication system Fresh LEU (from DOE) receipt area Associated laboratory and support areas
  • 10 CFR 30, "Rules of General Applicability to Domestic Licensing of Byproduct Material" Any byproduct materials produced or extracted in the RPF Design information for the complete range of normal operating conditions for various facility systems is provided throughout the Construction Perrrut Appli cation, and includes the following.
  • RPF-specific design criteria (e.g., codes and standards, NRC guidelines) for SSCs are provided in Sections 3.1.
  • NRC general design criteria and associated applicability to the RPF SSCs are addressed in Section 3.5.

3-2

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

  • RPF description is presented in Chapter 4.0, " Radioi sotope Production Facility Description."
  • Postulated initiating events and credible accidents that form the design basis for the SSCs are discussed in Chapter 13 .0.
  • Potential hazards and credible accidents that could be encountered in the RPF during operations involving SNM, irradiated and unirrradiated, Mo recovery and purification, uranium recovery and recycle, waste management, and/or the use of hazardous chemicals relative to these radiochemical processes that form the bases for the SSCs located in the RPF, are discussed in Chapter 13 .0.
  • Design redundancy ofSSCs to protect against unsafe conditions with respect to single failures of engineered safety features (ESF) and control systems are described in Chapter 6.0, "Engineered Safety Features," and Chapter 7.0, "Instrumentation and Control System," respectively.
  • ESFs are described in Chapter 6.0, and the administrative controls are discussed in Chapter 14.0, "Technical Specifications."
  • Quality standards commensurate with the safety functions and potential ri sks that were used in the design of the SS Cs are described in Table 3-7 (Section 3 .1. 7).
  • Hydrological design bases describing the most severe predicted hydrological events during the life of the facility are provided in Chapter 2.0, " Site Characteristics," Section 2.4.
  • Design criteria for facility SSCs to withstand the most severe predicted hydrological events during the lifetime of the facility are provided in Section 3.3.
  • Seismic design bases for the facility are provided in Chapter 2.0, Section 2.5. Seismic design criteria for the facility SSCs are provided in Section 3.4.
  • Analyses concerning function, reliability, and maintainability of SSCs are described throughout the Construction Permit Application .
  • Meteorological design bases describing the most severe weather extremes predicted to occur during the life of the facility are provided in Chapter 2.0, Section 2.3 . Design criteria for facility SSCs to withstand the most severe weather extremes predicted to occur during the life of the facility are provided in Section 3.2 .
  • Potential conditions or other items that will be probable subjects of technical specifications associated with the RPF structures and design features are discussed in Chapter 14.0.

3-3

..... NWMI

        • NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

' ~ *.* ~ ' NCNITNWUT MEOtCAUSOTOP'f.S 3.1 DESIGN CRITERIA Section 3.1 describes the design criteria applied to the RPF and SSCs within the facility. The principal design criteria for a production facility establish the necessary design, fabrication , construction, testing, and performance requirements for SSCs important to safety (i .e., those that provide reasonable assurance that the facility can be operated without undue risk to the health and safety of workers and the public).

The systems associated with the RPF are identified. Those items relied on for safety (IROFS) are identified in Chapters 6.0 and 13 .0. Requirements are derived from:

  • Code of Federal Regulations
  • U.S. Nuclear Regulatory Commission
  • Federal regulations, guidelines, and standards
  • Local government regulations and requirements
  • Discovery Ridge Research Park (Discovery Ridge) covenants
  • University of Missouri System (MU) requirements
  • Other codes and standards 3.1.1 Radioisotope Production Facility Structures, Systems, and Components Table 3-1 lists the RPF systems and identifies the RPF material accountability area and the Construction Permit Application reference chapter that provides the associated detailed system descriptions.

Table 3-1. List of System and Associated Systems and Construction Permit Application Crosswalk (2 pages)

Construction Permit Application reference Primary structure and associated systems (primary references)

Radioisotope Production Facility (RPF - primary structure)

IO CFR 70" Target fabrication Chapter 4.0, Sections 4.l.3.1and4.4 10 CFR sob Target receipt and disassembly Chapter 4.0, Section 4. l .3.2, 4.3.2, and 4.3.3 Target dissolution Chapter 4.0, Sections 4.1.3.3 and 4.3.4 Molybdenum recovery and purification Chapter 4.0, Sections 4.1.3.4 and 4.3.5 Uranium recovery and recycle Chapter 4.0, Sections 4.1.3.5 and 4.3.6 Waste handling Chapter 4.0, Section 4.l.3 .6; Chapter 9.0, Section 9.7.2 Criticality accident alarm Chapter 6.0, Section 6.3.3.1; Chapter 7.0, Section 7.3.7 Radiation monitoring Chapter 7.0, Section 7.6; Chapter 11 .0, Section 11 .1.4 Normal electrical power Chapter 8.0, Section 8.1 Standby electrical power Chapter 8.0, Section 8.2 Process vessel ventilation Chapter 9.0, Section 9.1 Facility ventilation Chapter 9.0, Section 9.1 Fire protection Chapter 9.0, Section 9.3 Plant and instrument air Chapter 9.0, Section 9.7.l Emergency purge gas Chapter 6.0, Section 6.2.1.7.5 Gas supply Chapter 9.0, Section 9.7.1 3-4

.....*.......;... NWMI NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures , Systems and Components

  • ~* * ~ NO<<THWUTMEl>>CALISOTOf'U Table 3-1. List of System and Associated Systems and Construction Permit Application Crosswalk (2 pages)

Construction Permit Application reference Primary structure and associated systems (primary references)

Process chilled water Chapter 9.0, Section 9.7.1 Facility chilled water Chapter 9.0, Section 9.7.1 Facility heated water Chapter 9.0, Section 9.7 .1 Process stream Chapter 9.0, Section 9.7.1 Demineralized water Chapter 9.0, Section 9.7.1 Chemical supply Chapter 9.0, Section 9.7.4 Biological shield Chapter 4.0, Section 4.2 Facility process control Chapter 7.0, Section 7.2.3

b 10 CFR 50, "Domestic Licensing of Production and Utili zation Facilities," Code of Federal Regulations, Office of th e Federal Register, as amended.

In addition to Table 3-2, NWMI-2015-LIST-003, NWMI Radioisotope Production Facility Master Equipment List, provides a summary of the RPF systems, components, and equipment used in the RPF design .

Table 3-2 provides a summary of the IROFS identified by the accident analyses in Chapter 13.0, and a crosswalk to where the IROFS are described in the Construction Permit Application. Chapter 13.0 also provides the associated detailed descriptions. Table 3-2 also identifies whether the IROFS are considered ESFs or administrative controls. Additional IROFS may be identified (or the current IROFS modified) during the RPF final design and development of the Operating License Application.

Table 3-2. Summary of Items Relied on for Safety Identified by Accident Analyses (3 pages)

IROFS Construction Permit Application designator Descriptor ESF AC crosswalk (primary references)

RS-01 Hot cell liquid confinement boundary ,/ Chapter 6.0, Sections 6.2. 1.1 - 6.2.1.6 Chapter 13.0, Section 13 .2.2.8 RS-02 Reserved*

RS-03 Hot cell secondary confinement boundary ,/ Chapter 6.0, Sections 6.2.1. 1 - 6.2 .1 .6 Chapter 13.0, Sections 13 .2.2 .8, 13.2.3.8 RS-04 Hot cell shielding boundary ,/ Chapter 6.0, Sections 6.2.1.1 - 6.2.1 .6 Chapter 13.0, Sections 13 .2.2.8, 13.2.4.8 RS-05 Reserved*

RS-06 Reserved*

RS -07 Reserved*

RS-08 Sample and analysis of low-dose waste tank Chapter 13.0, Section 13.2.7.1 dose rate prior to transfer outside the hot cell shielded boundary 3-5

.....*.........:*.NWMI

' ~ * *! . NORTHWUT MfDfCAl tsOTOf'fJ NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Table 3-2. Summary of Items Relied on for Safety Identified by Accident Analyses (3 pages)

IROFS Construction Permit Application designator Descriptor ESF AC crosswalk (primary references)

RS-09 Primary offgas relief system ./ Chapter 6. 0, Secti on 6.2. 1.7 Chapter 13 .0, Section 13 .2.3 .8 RS-10 Active radiation monitoring and isolation of ./ Chapter 6.0, Section 6.2.1.7 low-dose waste transfer Chapter 13 .0, Section 13 .2.7.1 RS- 11 Reserved*

RS-12 Cask containment sampling prior to closure ./ Chapter 13 .0, Section 13.2.7.1 lid removal RS- 13 Cask local ventilation during closure lid ./ Chapter 6.0, Section 6.2. 1.7 removal and docking preparations Chapter 13.0, Section 13.2.7.1 RS-14 Reserved*

RS- 15 Cask docking port enabling sensor Chapter 6. 0, Section 6. 2. 1.7 Chapter 13.0, Section 13.2. 7.1 CS-01 Reserved*

CS-02 Mass and batch handling limits for uranium Chapter 13.0, Section 13.2. 7.2 metal, ura nium oxides, ta rgets, and laboratory sample outside process systems CS-03 Interaction control spacing provided by ./ Chapter 13 .0, Section 13.2.7.2 administrative control CS-04 Interaction control spaci ng provided by ./ Chapter 6. 0, Section 6.3. 1.2 passively designed fi xtures and workstation Chapter 13.0, Section 13.2.7. 2 placement CS-05 Container batch volume limit ./ Chapter 13.0, Section 13 .2.7.2 CS-06 Pencil tank, vessel, or piping safe geometry ./ Chapter 6.0, Section 6.3.1.2 confine ment using the diameter of tanks, Chapter 13.0, Section 13.2.4.8 vessels, or piping CS-07 Pencil tank and vessel spacing control using ./ Chapter 6.0, Section 6.3 .1.2 fixed interaction spacing of individual tanks Chapter 13.0, Section 13.2.2.8 or vessels CS-08 Floor and sump geometry control of slab ./ Chapter 6. 0, Section 6.3. 1.2 depth, sump diameter or depth for fl oor spill Chapter 13.0, Section 13.2.2.8 containment berms CS-09 Double-wall piping ./ Chapter 6.0, Section 6.2. l. 7 Chapter 13.0, Section 13.2.2.8 CS- IO Closed safe geometry heating or cooling loop ./ Chapter 6.0, Section 6.3. 1.2 with moni toring and alarm Chapter 13.0, Section 13.2.4.8 CS-11 Simple overflow to normally empty safe ./ Chapter 6.0, Section 6.3.1.2 geometry tank with level alarm Chapter 13 .0, Section 13.2.7.2 CS-12 Condensing pot or seal pot in ventilation vent ./ Chapter 6. 0, Section 6.3.1.2 line Chapter 13 .0, Section 13.2.7.2 CS-13 Simple overflow to normally empty safe ./ Chapter 6.0, Section 6.3 .1.2 geometry floor with level alarm in the hot cell Chapter 13.0, Section 13 .2.7.2 containment boundary 3-6

......  ;.*.NWMI

' ~* *!

  • NOITHWESTMEDtCAllSOTOHI NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Table 3-2. Summary of Items Relied on for Safety Identified by Accident Analyses (3 pages)

IROFS Construction Permit Application designator Descriptor ESF AC crosswalk (primary references)

CS-14 Active discharge monitoring and isolation ,/ Chapter 6.0, Section 6.3.1 .2 Chapter 13.0, Section 13.2.7.2 CS-15 Independent active discharge monitoring and ,/ Chapter 6.0, Section 6.3.1.2 isolation Chapter 13.0, Section 13.2.7.2 CS-16 Sampling and analysis of uranium mass or ,/ Chapter 13.0, Section 13.2.7.2 concentration prior to discharge or disposal CS-17 Independent sampling and analysis of ,/ Chapter 13.0, Section 13 .2.7.2 uranium concentration prior to discharge or disposal CS-18 Backflow prevention device ,/ Chapter 6.0, Sections 6.2.1. 7 and 6.3 .1.2 Chapter 13 .0, Section 13 .2.4.8 CS-19 Safe-geometry day tanks ,/ Chapter 6.0, Section 6.3.1.2 Chapter 13.0, Section 13.2.4.8 CS-20 Evaporator or concentrator condensate ,/ Chapter 6.0, Section 6.3.1.2 monitoring Chapter 13 .0, Section 13 .2.4.8 CS-21 Visual inspection of accessible surfaces for ,/ Chapter 13.0, Section 13.2.7.2 foreign debris CS-22 Gram estimator survey of accessible surfaces ,/ Chapter 13 .0, Section 13.2.7.2 for gamma activity CS-23 Nondestructive assay of items with ,/ Chapter 13.0, Section 13.2.7.2 inaccessible surfaces CS-24 Independent nondestructive assay of items ,/ Chapter 13.0, Section 13 .2.7.2 with inaccessible surfaces CS-25 Target housing weighing prior to disposal ,/ Chapter 13.0, Section 13 .2.7.2 CS-26 Processing component safe volume ,/ Chapter 6.0, Section 6.3.1.2 confinement Chapter 13.0, Section 13.2.7.2 CS-27 Closed heating or cooling loop with ,/ Chapter 6.0, Section 6.3.1.2 monitoring and alarm Chapter 13.0, Section 13 .2.4.8 FS-01 Enhanced lift procedure ,/ Chapter 13 .0, Section 13 .2.2.8 and 13 .2.7. 1 FS-02 Overhead cranes ,/ Chapter 13.0, Section 13.2.7.3 FS-03 Process vessel emergency purge system ,/ Chapter 6.0, Section 6.2. 1. 7 Chapter 13 .0, Section 13 .2.7.3 FS-04 Irradiated target cask lifting fixture ,/ Chapter 6.0, Section 6.2.1. 7 Chapter 13.0, Section 13.2.6.5 FS-05 Exhaust stack height ,/ Chapter 6.0, Section 6.2.1.7 Chapter 13 .0, Section 13.2.7.3

  • Reserved - IROFS designator currently unassigned.

AC administrative control. IROFS items relied on for safety.

ESF = engineered safety feature.

3-7

.*ii*:~";"

....NWM I

~* * ~ . NOtmfWEST MEDICAL tsOTOPH NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components 3.1.2 Code of Federal Regulations NWMI-DRD-2013-030, NWMI Radioisotope Production Facility Design Requirements Document, summarizes the CFR design inputs (in whole or in part) for the RPF, which include the following:

  • 10 CFR 20, " Standards for Protection Against Radiation"
  • 10 CFR 30, " Rules of General Applicability to Domestic Licensing of Byproduct Material"
  • 10 CFR 50, " Domestic Licensing of Production and Utilization Facilities"
  • 10 CFR 71 , "Energy: Packaging and Transportation of Radioactive Material"
  • I 0 CFR 851 , "Worker Safety and Health Program"
  • 21 CFR 210, "Current Good Manufacturing Practice in Manufacturing, Processing, Packaging, or Holding of Drugs'
  • 21 CFR 211 , "Current Good Manufacturing Practice for Finished Pharmaceuticals"
  • 29 CFR 1910, "Occupational Safety and Health Standards"
  • 40 CFR 61 , "National Emissions Standards for Hazardous Air Pollutants (NESHAP)"
  • 40 CFR 63 , "NESHAP for Source Categories"
  • 40 CFR 141 , "National Primary Drinking Water Regulations" 3.1.3 U.S. Nuclear Regulatory Commission Table 3-3 lists the NRC design inputs for the RPF identified in NWMI-DRD-2013-030. The RPF system design descriptions identify the specific requirements for that system produced by each applicable reference.

Table 3-3. Relevant U.S. Nuclear Regulatory Commission Guidance (3 pages)

CFRa Title Docket Number: Final Interim Staff Guidance Augmenting NUREG-153 7, "Guidelines fo r Preparing and NRC-2011-0135 Reviewing Applications for the Licensing of Non-Power Reactors, " Parts 1 and 2,for (NRC, 2012) Licensing Radioisotope Production Facilities and Aqueous Homogeneous Reactors NRC Regulatory Guides - Power Reactors (Division 1)

Regulatory Guide 1.29 Seismic Design Classification Regulatory Guide 1.53 Application of the Single-Failure Criterion to Safety Systems, 2003 (R2011)

Regulatory Guide 1.60 Design Response Spectra for Seismic Design of Nuclear Power Plants, 2014 Regulatory Guide 1.61 Damping Values of Seismic Design ofNuclear Power Plants Regulatory Guide 1.76 Design Basis Tornado and Tornado Missiles for Nuclear Power Plants , 2007 Regulatory Guide 1.92 Combining Modal Responses and Spatial Components in Seismic Response Analysis Regulatory Guide 1.97 Criteria for Accident Monitoring Instrumentation for Nuclear Power Plants, 2006 (R2013)

Regulatory Guide 1.100 Seismic Qualification of Electrical and Active Mechanical Equipment and Functional Qualification ofActive Mechanical Equipment for Nuclear Power Plants, 2009 Regulatory Guide I . I 02 Flood Protection for Nuclear Power Plants Regulatory Guide 1.122 Development ofFloor Design Response Spectra for Seismic Design ofFloor-Supported Equipment or Components 3-8

....;....*. NWMI NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

' ~** ~ . NORTHWEST MEDICAl. ISOTOPE.S Table 3-3. Relevant U.S. Nuclear Regulatory Commission Guidance (3 pages)

CFR 3 Title Regulatory Guide 1.152 Criteria for Use of Computers in Safety Systems of Nuclear Power Plants, 2011 Regulatory Guide 1.166 Pre-Earthquake Planning and Immediate Nuclear Power Plant Operator Post Earthquake Actions, 1997 Regulatory Guide 1.167 Restart of a Nuclear Power Plant Shut down by a Seismic Event, 1997 Regulatory Guide 1.208 Performance Based Approach to Define the Site-Specific Earthquake Ground Motion, 2007 NRC Regulatory Guides - Fuels and Materials Facilities (Division 3)

Regulatory Guide 3.3 Quality Assurance Program Requirements for Fuel Reprocessing Plants and for Plutonium Processing and Fuel Fabrication Plants, 1974 (R2013)

Regulatory Guide 3.6 Content of Technical Specification for Fuel Reprocessing Plants, 1973 (R2013)

Regulatory Guide 3. JO Liquid Waste Treatment System Design Guide for Plutonium Processing and Fuel Fabrication Plants, 1973 (R2013)

Regulatory Guide 3 .18 Confinement Barriers and Systems for Fuel Reprocessing Plants, 1974 (R2013)

Regulatory Guide 3.20 Process Offgas Systems for Fuel Reprocessing Plants, 1974 (R2013)

Regulatory Guide 3.71 Nuclear Criticality Safety Standards for Fuels and Materials Facilities, 2010 NRC Regulatory Guides - Materials and Plant Protection (Division 5)

Regulatory Guide 5.7 Entry/Exit Control for Protected Areas, Vital Areas, and Material Access Areas, May 1980 (R2010)

Regulatory Guide 5 .12 General Use ofLocks in the Protection and Control ofFacilities and Special Nuclear Materials, 1973 (R2010)

Regulatory Guide 5.27 Special Nuclear Material Doorway Monitors, 1974 Regulatory Guide 5.44 Perimeter Intrusion Alarm Systems, 1997 (R2010)

Regulatory Guide 5.57 Shipping and Receiving Control of Strategic Special Nuclear Material, 1980 Regulatory Guide 5.65 Vital Area Access Control, Protection of Physical Security Equipment, and Key and Lock Controls, 1986 (R2010)

Regulatory Guide 5.71 Cyber Security Programs for Nuclear Facilities, 2010 NUREG-0700, Human-System Interface Design Review Guidelines NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants, LWR Edition Section 2.3.l "Regional Climatology," Rev. 3, March 2007 Section 2.3 .2 "Local Climatology," Rev. 3, March 2007 Section 3.3 .1 "Wind Loading," Rev. 3, March 2007 Section 3.3.2 "Tornado Loading," Rev. 3, March 2007 Section 3.7.1 "Seismic Design Parameters," March 2007 Section 3.7.2 "Seismic System Analysis," Rev. 4, September 2013 Section 3.7.3 "Seismic Subsystem Analysis," Rev. 4, September 2013 NUREG-1513, Integrated Safety Analysis Guidance Document NUREG-1520, Standard Review Plan for the Review of a License Application for a Fuel Cycle Facility Part 3, Appendix D Natural Hazard Phenomena" NUREG-1537, Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors

- Format and Content, Part 1 3-9

...*.....;:.NWMI

  • ~~~!!* *

. f!K>fl0fWfSTMEOICALtsOTOP£S NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Table 3-3. Relevant U.S. Nuclear Regulatory Commission Guidance (3 pages)

CFR 3 Title NUREGICR-4604, Statistical Methods for Nuclear Material Management NUREGICR-6410, Nuclear Fuel Cycle Facility Accident Analysis Handbook Process hazard analysis "Development of Quantitative Risk Analyses" NUREGICR-6463, Review Guidelines on Software Languages for Use in Nuclear Power Plant Safety Systems -

Final Report NUREGICR-6698, Guide for Validation of Nuclear Criticality Safety Calculational Methodology

  • Complete references are provided in Section 3.6.

3.1.4 Other Federal Regulations, Guidelines, and Standards Table 3-4 lists other Federal design inputs for the RPF (NWMI-DRD-2013-030). The RPF system design descriptions identify the specific requirements for that system produced by each applicable reference.

Table 3-4. Other Federal Regulations, Guidelines, and Standards Reference* Title Federal Emergency Management Agency (FEMA)

NI A "National Flood Insurance Program, Flood Insurance Rate Map, Boone County, Missouri and Incorporated Areas" National Oceanic and Atmospheric Administration (NOAA)

Hydrometeorological Probable Maximum Precipitation Estimates, United States East of the 105th Meridian Report No. 51 Hydrometeorological Application ofProbable Maximum Precipitation Estimates, United States East of the J05th Report No. 52 Meridian Hydrometeorological Seasonal Variation of JO-Square-Mile Probable Maximum Precipitation Estimates, United Report No. 53 States East of the 105th Meridian U.S. Geological Survey (USGS)

NIA "2008 U .S. Geological Survey National Seismic Hazard Maps" Open-File Report Documentation for the 2008 Update of the United States National Seismic Hazard Maps 2008-1128 Centers for Disease Control and Prevention (CDC)

NIOSH 2003-136 Guidance for Filtration and Air-Cleaning Systems to Protect Building Environments from Airborne Chemical, Biological, and Radiological Attacks

NIOSH National Institute for Occupational Safety and USGS U.S. Geological Survey.

Health.

3.1.5 Local Government Documents Table 3-5 lists the design inputs for the RPF from the State of Missouri, City of Columbia, and Boone County government sources (NWMI-DRD-20 13-030). The RPF system design descriptions identify the specific requirements for that system produced by each applicable reference.

3-10

NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures , Systems and Components Table 3-5. Local Government Documents (2 pages)

Referencea Title Missouri Code of State Regulations (CSR), Title 10 10 CSR 10-6.01 Ambient Air Quality Standards Missouri CSR, Title 20 20 CSR 2030-2.040(1) Evaluation Criteria for Building Design Missouri Department of Transportation (MODOT) Standards and Specifications Missouri Department of Natural Resources (MDNR)

Missouri State Adopted International Code Council (ICC) Building Code Set 2012 Boone County Building Code City of Columbia, Missouri, Code of Ordinances Article II - Building and Fire Codes Section 6- 16, Adopted Building Code Section 6-17, Amendments Building Code Section 9-21 Fire Code Section 9-22 Fire Code

  • Complete references are provided in Section 3.6 CSR Code of State Regulations. MDNR Missouri Department of atural Resources.

ICC = International Code Council. MO DOT Missouri Department of Transportation.

3.1.6 Discovery Ridge/University of Missouri Table 3-6 lists the MU system requirements and Di scovery Ridge covenants design inputs for the RPF identified in NWMI-DRD-2013-030 . The RPF system design descriptions identify the specific requirements for that system produced by each applicable reference .

Table 3-6. Discovery Ridge/University of Missouri Requirements Requirements Reference section/requirementa Civi l Design and construction of the civil system is regulated by the NRC as required by Di scovery Ridge/MU.

Collected Rules and Regulations (CRR)

Structural CRR Section 70.060.1 , "Codes and Standards" - Adopts ICC codes University of Missouri, Consultant Procedures and Design Guidelines Electrical Section 2.4.2, " Building Codes and Standards for Univers ity Facilities" HV AC CPDG Division 23 , "Heating, Ventilating, and Air-Conditioning (HVAC)"

Instrumentation Section 2.4.2, "Building Codes and Standards for Un iversity Facilities" and Controls Planning CPDG Section 2.4, "Planning, Design and Contract Document Development Guidelines for Master Construction Delivery Method" Plumbing CPDG Division 22, " Plumbing" Process Section 2.4.2, "Building Codes and Standards for University Facilities" University of Missouri, Facilities Management Policy and Procedures Manual Electrical Chapter 2, "Design and Construction Policy" 3-11

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Table 3-6. Discovery Ridge/University of Missouri Requirements Requirements Reference section/requirement*

Instrumentation Chapter 2, "Design and Construction Policy" and Controls Structural Section 3.A, Refers to CRR 70.060 for the Basic Building Code Section 3.0, Refers to the University Building Adopted Codes for currently adopted codes University Building Adopted Codes IMC-2012 International Mechanical Code Structural Adopts IBC 2012

  • Complete references are provided in Section 3.6 CRR Collected Rules and Regulations. MU University of Missouri.

!BC International Building Code. NRC U.S. Nuclear Regul atory Commission.

ICC = International Code Council.

3.1.7 Codes and Standards Table 3-7 lists design inputs for the RPF identified in NWMI-DRD-2013-030. The RPF system design descriptions identify the specific requirements for that system produced by each applicable reference.

The Construction Pennit Application and associated preliminary design documents identify codes, standards, and other referenced documents that may be applicable to the RPF. The specific RPF design codes, standards, and other referenced documents, including exceptions or exemptions to the identified requirements, will be finalized in the RPF final design and provided to the NRC. In addition, the codes, standards, and referenced documents for the RPF safety SSCs that are needed to demonstrate compliance with regulatory requirements will be identified and committed to in the Operating License Application .

Table 3-7. Design Codes and Standards (12 pages)

Document number" Document title American Concrete Institute (ACI)

ACI 349 Code Requirements fo r Nuclear Safety-Related Concrete Structures and Commentm y, 201 3 American Institute of Steel Construction (AISC)

ANSU AISC N690 Specification for Safety -Related Steel Structures for Nuclear Facilities, 201 2 Air Movement and Control Association (AMCA)

AMCA Publication 201 Fans and Systems, 2002 (R201 l)

AMCA Publication 203 Field Performance Measurement ofFan Systems, 1990 (R201 l)

ANSI/AMCA 210 Laboratory Methods for Testing Fans for Aerodynamic Performance Rating, 2007 AMCA Publication 211 Certified Ratings Program - Product Rating Manual for Fan Air Performance, 2013 AMCA Publication 311 Certified Ratings Program - Product Rating Manual for Fan Sound Performance, 2006 (R2010)

American Conference on Governmental Industrial Hygienists (ACGIH)

ACGIH 2097 Industrial Ventilation : A Manual ofRecommended Practice for Design, 2013 American National Standards Institute (ANSI)

ANSI/ITSDF B56. I Safety Standard for Low lift and High Lift Trucks 3-12

.*. NWMI

' ~~.* ! . NORTIIWEST llEOICAl. ISOTOH:S NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Table 3-7. Design Codes and Standards (12 pages)

Document number" Document title ANSI/IEEE C2 2012 National Electrical Safety Code (NESC), 2012 ANSI C84. l American National Standard for Electric Power Systems and Equipment - Voltage Ratings (60 Hertz), 2011 ANSI Nl3 series Addresses radiation monitoring equipment ANSI N 13 .1 Sampling and Monitoring Releases ofAirborne Radioactive Substances from the Stacks and Ducts of Nuclear Facilities 2011 ANSI N323D American National Standard for Installed Radiation Protection Instrumentation ,

2002 ANSI/AIHA/ASSE Z9.5 Laboratory Ventilation, 2012 ANSI/NEMA Z535 . I Safety Colors, 2006 (R201 I)

ANSI/NEMA Z535.2 Environmental and Facility Safety Signs, 2011 ANSI/NEMA Z535 .3 Criteria for Safety Symbols, 2011 ANSI/NEMA Z535.4 Product Safety Signs and Labels, 2011 ANSI/AMCA 204 Balance Quality and Vibration Levels for Fans, 2005 (R20 12)

ANSI/AMCA 210 Laboratory Methods of Testing Fans for Aerodynamic Performance Rating, 2007 ANSI/ARRI Standard 390 Performance Rating of Single Package Vertical Air-Conditioners and Heat Pumps ,

2003 ANSI/ARRI Standard 410 Forced-Circulation Air-Cooling and Air-Heating Coils, 2001 ANSI/ARRI Standard 430 Performance Rating of Central Station Air-Handling Units, 2009 ANSI/ARRI Standard 850 Performance Rating of Commercial and Industrial Air Filter Equipment, 2013 ANSI/HI 3.1-3.5 Rotary Pumps, 2008 ANSI N42. l 7B American National Standard Performance Specifications for Health Physics Instrumentation - Occupational Airborne Radioactivity Monitoring Instrumentation, 1989 ANSI N42 . l 8 Specification and Performance of On-Site instrumentation for Continuously Monitoring Radioactivity in Effluents , 2004 ANSI/IEEE N320 American National Standard Performance Specifications for Reactor Emergency Radiological Monitoring Instrumentation , 1979 American Nuclear Society (ANS)

ANSI/ANS-2.3 Estimating Tornado, Hurricane, and Extreme Straight Line Wind Characteristics at Nuclear Facility Sites, 2011 ANSI/ ANS-2.26 Categorization of Nuclear Facility Structures, Systems, and Components for Seismic Design, 2004 (R2010)

ANSI/ANS-2.27 Criteria for Investigations ofNuclear Facility Sites for Seismic Hazard Assessments, 2008 ANSI/ANS-2.29 Probabilistic Seismic Hazard Analysis, 2008 ANSI/ANS-6.4 Nuclear Analysis and Design of Concrete Radiation Shielding for Nuclear Power Plants, 2006 3-13

....  ;..:.NWMI

' ~~: !

  • NOATKWESTMEDICAUSOTOf'ES NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Table 3-7. Design Codes and Standards (12 pages)

Document number* Document title ANSI/ANS-6.4.2 Specification for Radiation Shielding Materials , 2006 ANSI/ ANS-8.1 Nuclear Criticality Safety in Operations with Fissionable Materials Outside Reactors, 1998 (R2007) (W2014)

ANSl/ANS-8.3 Critically Accident A !arm System, 1997 (R20 I 2)

ANSI/ANS-8. 7 Nuclear Criticality Safety in the Storage of Fissile Materials, 1998 (R2007)

ANSI/ANS-8 .10 Criteria for Nuclear Criticality Control in Operations with Shielding and Confinement, 1983 (R2005)

ANSI/ ANS-8.19 Administrative Practices for Nuclear Criticality Safety, 1996 (R2014)

ANSI/ANS-8.20 Nuclear Criticality Safety Training , 1991 (R2005)

ANSI/ANS-8.21 Use ofFixed Neutron Absorbers in Nuclear Facilities Outside Reactors, 1995 (R2011)

ANSI/ ANS-8.24 Validation of Neutron Transport Methods for Nuclear Criticality Safety Calculations, 2007 (R2012)

ANSl/ANS-10.4 Verification and Validation of Non-Safety-Related Scientific and Engineering Computer Programs for the Nuclear Industry, 2008 ANSI/ ANS-10.5 Accommodating User Needs in Computer Program Development, 2006 (R2011)

ANSl/ANS-15 .17 Fire Protection Program Criteria for Research Reactors, 1981 (R2000) (W2010)

ANSI/ANS-40.3 7 Mobile Low-Level Radioactive Waste Processing Systems, 2009 ANSl/ANS-55.1 Solid Radioactive Waste Processing System for Light Water Cooled Reactor Plants, 1992 (R2009)

ANSI/ ANS-55.4 Gaseous Radioactive Waste Processing Systems for light Water Reactor Plants ,

1993 (R2007)

ANSl/ANS-55 .6 Liquid Radioactive Waste Processing System for Light Water Reactor Plants, 1993 (R2007)

ANSI/ANS-58 .3 Physical Protection for Nuclear Safety-Related Systems and Components, 1992 (R2008)

ANSI/ANS-58.8 Time Response Design Criteria for Safety-Related Operator Actions, 1994 (R2008)

ANSI/ ANS-59.3 Nuclear Safety Criteria for Control Air Systems, 1992 (R2002) (W2012)

Design Guides for Radioactive Material Handling Facilities and Equipment, Remote Systems Technology Division, 1988, Air Conditioning, Heating and Refrigeration Institute (AHRI)

ANSl/AHRI Standard 365 Performance Rating of Commercial and Industrial Unitary Air-Conditioning Condensing Units , 2009 ANSI/AHRI Standard 410 Forced-Circulation Air-Conditioning and Air-Heating Coils, 2001 American Society of Civil Engineers (ASCE)

ASCE4 Seismic Analysis of Safety-Related Nuclear Structures and Commentary, 2000 ASCE 7 Minimum Design Loads for Buildings and Other Structures , 2005 (R2010)

ASCE43 Seismic Design Criteria for Structures, Systems, and Components in Nuclear Facilities, 2005 3-14

-.;*.. NWMI

' ! ~.. ~

  • NOfUlfWESTMEOICALISOTOPES NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Table 3-7. Design Codes and Standards (12 pages)

Document number" Document title ASCE Manual of Practice Design and Construction of Sanitary and Storm Sewers , 1969 37 American Society of Heating, Refrigeration and Air-Conditioning Engineers (ASHRAE)

ANSI/ASHRAE Standard Safety Standard for Refrigeration Systems, 2013 15 ANSI/ASHRAE 51-07 Laboratory Methods of Testing Fans for Certified Aerodynamic Peiformance Rating, 2007 ANSI/ ASHRAE Standard Method for Testing General Ventilation Air Cleaning Devices for Removal 52.2 Efficiency by Particle Size, 2007 ANSI/ASHRAE Standard Thermal Environmental Conditions for Human Occupancy, 2013 55 ANSI/ ASHRAE Standard Ventilation for Acceptable Indoor Air Quality, 2010 62.1 ASHRAE Standard 70 Method of Testing the Performance ofAir Outlets and Air Inlets, 2011 ANSl/ASHRAE/IES Energy Standard for Buildings Except Low-Rise Residential Buildings, 2010 Standard 90.1 ANSl/ASHRAE 110 Method of Testing Performance ofLaboratory Fume Hoods, 1995 ANSI/ ASHRAE 111 Measurement, Testing, Adjusting and Balancing ofBuilding Heating, Ventilation, Air-Conditioning and Refrigeration Systems , 2008 American Society of Mechanical Engineers (ASME)

ASME A 17 .1 Safety Code for Elevators and Escalators, 201 3 ASME AG-1 Code on Nuclear Air and Gas Treatment, 2012 ASME Bl6.5 Pipe Flanges and Flanged Fittings: NPW ~ through 24, 2003 ASMEB20.l Safety Standard for Conveyors and Related Equipment, 2012 ASME B30.17 Overheard and Gantry Cranes (Top Running Bridge, Single Girder, Underhung Hoist), 2006 ASMEB30.20 Below-the-Hook Lifting Devices, 2013 ASME B31.3 Process Piping, 2014 ASME B31.9 Building Services Piping, 2011/2014 ASME B31.12 Hydrogen Piping and Pipelines , 2014 ASMEB40.100 Pressure Gauges and Gauge Attachments, 2013 ASME B40.200 Thermometers, Direct Reading and Remote Reading, 2013 ASME Boiler and Pressure Section VIII Division 1, 2010/2013 Vessel Code Section IX ASMEHST-1 Performance Standard for Electric Chain Hoists, 2012 ASMEN509 Nuclear Power Plant Air-Cleaning Units and Components, 2002 (R2008)

ASMEN510 Testing of Nuclear Air-Treatment Systems, 2007 ASMENQA-1 Quality Assurance Requirements for Nuclear Facility Applications, 2008 with NQA-la-2009 addenda 3-15

......*.....;... NWMI

. ' !~ * ~ . NORTHWHTMEDICALISOTO..U NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Table 3-7. Design Codes and Standards (12 pages)

Document number" Document title ASME QME-1 Qualification ofActive Mechanical Equipment Used in Nuclear Power Plants, 2012 American Society for Nondestructive Testing (ASNT)

SNT-TC-lA Recommended Practice No. SNT-TC-JA: Personnel Qualification and Certification in Nondestructive Testing, 2011 American Society for Testing and Materials (ASTM)

ASTM Cl055 Standard Guide for Heated System Surface Conditions that Produce Contact Burn Injuries, 2003 (2014)

ASTM Cl217 Standard Guide for Design ofEquipment for Processing Nuclear and Radioactive Materials, 2000 ASTM Cl533 Standard Guide for General Design Considerations for Hot Cell Equipment, 2015 ASTM Cl554 Standard Guide for Materials Handling Equipment for Hot Cells, 2011 ASTM Cl572 Standard Guide for Dry Lead Glass and Oil-Filled Lead Glass Radiation Shielding Window Components for Remotely Operated Facilities, 20 I 0 ASTM Cl615 Standard Guide for Mechanical Drive Systems for Remote Operation in Hot Cell Facilities, 2010 ASTM Cl661 Standard Guide for Viewing Systems for Remotely Operated Facilities, 2013 ASTME493 Standard Practice for Leaks Using the Mass Spectrometer Leak Detector in the Inside-Out Testing Mode, 2011 ASTM Fl471 Standard Test Method for Air Cleaning Performance of High-Efficiency Particulate Air-Filter System, 2009 American Welding Society (A WS)

AWS B2. l/B2. JM Specification for Welding Procedure and Performance Qualification, 2009 AWS D 1.1I D 1.1 M Structural Welding Code - Steel, 2010 AWS Dl.3/Dl .3M Structural Welding Code - Sheet Steel, 2008 AWS Dl.6/Dl.6M Structural Welding Code - Stainless Steel, 2007 AWS D9.l/ D9.IM Sheet Metal Welding Code, 2006 AWSQCI Standard for A WS Certification of Welding Inspectors, 2007 Centers for Disease Control and Prevention (CDC) - National Institute for Occupational Safety and Health (NIOSH)

DHHS (NIOSH) Publication Guidance for Filtration and Air Cleaning Systems to Protect Building Environments No. 2003-136 from Airborne Chemical, Biological, and Radiological Attacks, 2003 Electronic Industries Alliance (EIA)/Telecommunications Industry Association (TIA)

ANSl/TIA-568-C. l Commercial Building Telecommunications Cabling Standard, 2012 ANSl/TIA-568-C.2 Balanced Twisted-Pair Telecommunications Cabling and Components Standards, 2014 ANSl/TIA-568-C.3 Optical Fiber Cabling and Components Standard, 2011 ANSl/TIA-569 Telecommunications Pathways and Spaces, 2013 ANSl/TIA-606 Administration Standard for Commercial Telecommunications Infrastructure, 2012 3-16

  • ..; NWMI
    • ~**::.
    • *
  • NOflTHWEST MEDICAL lSOlOPES NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Table 3-7. Design Codes and Standards (12 pages)

Document numbera Document title ANSI/TIA-607 Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications, 2013 ANSI/TIA-758-A Customer-Owned Outside Plant Telecommunications Infrastructure Standard, 2004 International Code Council ICCA117.l Accessible and Usable Buildings and Facilities Standard, 2009 IECC 20i 2 International Energy Conservation Code, May 2011 IMC 20i 2 In ternational Mechanical Code, June 2011 IPC International Plumbing Code, April 2011 Institute of Electrical and Electronics Engineers (IEEE)

IEEE 7-4.3 .2 Standard Criteria fo r Digital Computers in Safety Systems of Nuclear Power Generating Stations, 2003 IEEE 141 Recommended Practice for Electric Power Distribution for Industrial Plants (Red Book), 1993 (R1999)

IEEE 142 Recommended Practice for Grounding of Indu trial and Commercial Power Systems (Green Book), 2007 IEEE 24 1 Recommended Practice fo r Electric Power Systems in Com mercial Buildings (Gray Book) , 1990 (R1997)

IEEE 242 Recommended Practice f or Protection and Coordination of Industrial and Commercial Power Systems (Buff Book), 200 1 IEEE 308 Standard Criteria for Class JE Power Systems for Nuclear Power Generating Stations, 2012 IEEE 315 Graphic Symbols for Electrical and Electronics Diagrams, 1975 (RI 993)

IEEE 323 Standard for Qualifying Class i E Equipment for Nuclear Power Generating Stations, 2003 IEEE 336 Recommended Practice f or installation, In sp ection, and Testing /o r Class IE Power, Instrumentation, and Control Equipment at Nuclear Facilities, 2010 IEEE 338 Standard for Criteria for the Periodic Surveillance Testing ofNuclear Power Generating Station Safety Systems, 2012 IEEE 344 Recommended Practice fo r Seismic Qualification of Class i E Equipment for Nuclear Power Generating Stations, 2013 IEEE 379 Standard Application of the Single-Failure Criterion to Nuclear Power Generating Station Safety Systems, 2014 IEEE 384 Standard Criteria for independence of Class i E Equipment and Circuits, 2008 IEEE 399 Recommended Practice for Power Systems Analysis (Brown Book), 1997 IEEE 446 Recommended Practice f or Emergency and Standby Power Systems for Industrial and Commercial Applications (Orange Book), 1995 (R2000)

IEEE 493 Recommended Practice for the Design ofReliable Industrial and Commercial Power Systems (Gold Book), 2007 3-17

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures , Systems and Components Table 3-7. Design Codes and Standards (12 pages)

Document number* Document title IEEE 497 Standard Criteria for Accident Monitoring Instrumentation for Nuclear Power Generating Stations, 2010 IEEE 5I9 Recommended Practice and Requirements for Harmonic Control in Electrical Power Systems, 20I4 IEEE 535 Standard for Qualification of Class 1E Lead Storage Batteries for Nuclear Power Generating Stations, 2013 IEEE 577 Standard Requirements for Reliability Analysis in the Design and Operation of Safety Systems for Nuclear Facilities, 20I2 IEEE 603 Standard Criteria for Safety Systems for Nuclear Power Generating Stations, 2009 IEEE 650 Standard for Qualification of Class IE Static Battery Chargers and Inverters for Nuclear Power Generating Stations, 2006 IEEE 739 Recommended Practice for Energy Management in Industrial and Commercial Facilities (Bronze Book), 1995 (R2000)

IEEE 828 Standard for Configuration Management in Systems and Software Engineering, 20I2 IEEE 829 Standard for Software and System Test Documentation , 2008 IEEE 902 Guide for Maintenance, Operation, and Safety of Industrial and Commercial Power Systems (Yellow Book), I 998 IEEE 946 Generating Stations, 2004 IEEE I012 Standard Criteria for Software Verification and Validation, 20I2 IEEE 1015 Recommended Practice Applying Low-Voltage Circuit Breakers Used in Industrial and Commercial Power Systems (Blue Book), 2006 (C2007)

IEEE 1023 Guide for the Application of Human Factors Engineering to Systems, Equipment, and Faci/ities ofNuclear Power Generating Stations, 2004 (R20 I 0)

IEEE 1028 Standard for Software Reviews and Audits, 2008 IEEE 1046 Application Guide for Distributed Digital Control and Monitoring/or Power Plants, 1991 (Rl996)

IEEE 1050 Guide for Instrumentation and Control Equipment Grounding in Generating Stations, 2004 IEEE I 100 Recommended Practice for Powering and Grounding Electronic Equipment (Emerald Book), 2005 IEEE I289 Guide for the Application ofHuman Factors Engineering in the Design of Computer-Based Monitoring and Control Displays for Nuclear Power Generating Stations, 1998 (R2004)

IEEE 1584 IEEE Guide for Performing Arc-Flash Hazard Calculations, 2002 ANSI/IEEE C2 201 2 National Electrical Safety Code (NESC), 2012 Illuminating Engineering Society of North America (IES)

IES-20 I I The Lighting Handbook, 2011 ANSI/JES RP-I-I 2 American National Standard Practice for Office Lighting, 2012 3-18

.....****~

......*.* NWMI

' ~ * *! ' NORTHWEST MEDtCAL ISOTOKS NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Table 3-7. Design Codes and Standards (12 pages)

Document number" Document title IES RP-7 American National Standard Practice for Lighting Industrial Facilities , 1991 (W2001)

International Society of Automation (ISA)

ANSI/ISA-5.1-2009 Instrumentation Symbols and Identification , 2009 ISA-5 .3-1983 Graphic Symbols for Distributed Control/Shared Display Instrumentation, Logic, and Computer Systems, 1983 ISA-5.4-1991 Instrument Loop Diagrams, 1991 ISA-5.5-1985 Graphic Symbols for Process Displays, 1985 ANSI/ISA-5.06.01-2007 Functional Requirements Documentation f or Control Software Applications, 2007 ANSI/ISA 7.0.01-1996 Quality Standard for Instrument Air ANSl/ISA-12.01 .01-2013 Definitions and Information Pertaining to Electrical Equipment in Hazardous (Classified) Locations, 2013 ISA-18.1-1979 Annunciator Sequences and Specifications, 1979 (R2004)

ISA-TR20.00.0l-2007 Specification Forms fo r Process Measurement and Control Instruments Part 1:

General Considerations Updated with 27 new specification form s in 2004-2006 and updated with 11 new specification f orms in 200 7 ISA-RP60.l-1990 Control Center Facilities, 1990 ISA-67 .01.01-2002 Tran sducer and Tran smitter In stallation for Nuclear Safety Applications , 2002 (R2007)

ANSl/ISA-67.04.01-2006 Setpoints for Nuclear Safety-Related Instrumentation , 2006 (R2011) 1SA-RP67.04.02-2010 Methodologies for the Determination of Setpoints f or Nuclear Safety-Related Instrumentation, 2010 ANSI/ISA-75.05.01-2000 Control Valve Terminology, 2000 (R2005)

ANSI/TSA-82 .03 - 1988 Safety Standard f or Electrical and Electronic Test, Measuring, Controlling, and Related Equipment, 1988 ISA-TR84.00.04-201 l Part 1 Guideline for the Implementation ofANSI/ISA-84.00.01-2004 (/EC 61511),

2011 ISA-TR84.00.09-201 3 Security Countermeasures Related to Safety instrumented Systems (SIS}, 2013 ISA-TR9 l.00.02-2003 Criticality Classification Guideline for Instrumentation, 2003 ANSl/JSA-TR99 .00.0l- Security Technologies fo r Industrial Automation and Control Systems , 2007 2007 International Atomic Energy Agency (IAEA)

IAEA-TECDOC-1 250 Seismic Design Considerations ofNuclear Fuel Cycle Facilities , 2001 IAEA-TECDOC-1347 Consideration ofExternal Events in the Design of Nuclear Facilities Other Than Nuclear Power Plants, With Emphasis on Earthquakes, 2003 IAEA-TECDOC-1430 Radioisotope Handling Facilities and Automation of Radioisotope Production , 2004 International Code Council (ICC)

IBC 2012 International Building Code, 201 2 IFC 2012 International Fire Code, 2012 3-19

NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Table 3-7. Design Codes and Standards (12 pages)

Document number" Document title IMC 2012 International Mechanical Code, 2012 International Code Council Evaluation Service (ICC-ES)

ICC-ES AC156 "Acceptance Criteria for Seismic Certification by Shake-Table Testing of Nonstructural Components," 2010 National Electrical Contractors Association (NECA)

NECA I Standard Practice of Good Workman ship in Electrical Construction, 2010 NECA90 Recommended Practice for Commissioning Building Electrical Systems (ANSI),

2009 NECA 100 Symbols f or Electrical Construction Drawings (ANSI) , 2013 NECA 101 Standard for Installing Steel Conduits (Rigid, IMC, EMT) (ANSI), 2013 NECA/AA 104 Standard for Installing Aluminum Building Wire and Cable (ANSI), 2012 NECA/NEMA 105 Standard for Installing Metal Cable Tray Systems (ANSI) , 2007 NECA 111 Standard for Installing Nonmetallic Raceways (RNC, ENT, LFNC) (ANSI) , 2003 NECA 120 Standard for Installing Armored Cable (Type AC) and Metal-Clad Cable (Type MC)

(ANSI), 2013 NECA202 Standard for Installing and Maintaining Industrial Heat Tracing Systems (ANS!) ,

2013 NECA230 Standard for Selecting, Installing, and Maintaining Electric Motors and Motor Controllers (ANSI), 2010 NECAIFOA 301 Standard for Installing and Testing Fiber Optics, 2009 NECA 331 Standard for Building and Service Entrance Grounding and Bonding, 2009 NECA400 Standard for Installing and Maintaining Switchboards (ANS!) , 2007 NECA402 Standard for Installing and Maintaining Motor Control Centers (ANSI), 2007 NECA/EGSA 404 Standard for Installing Generator Sets (ANSI) , 2014 NECA407 Recommended Practice for Installing and Maintaining Pane/boards (ANSI), 2009 NECA408 Standard for Installing and Maintaining Busways (A NSI) , 2009 NECA409 Standard for Installing and Maintaining Dry-Type Transformers (ANSI), 2009 NECA 410 Standard for Installing and Maintaining Liquid-Filled Transf ormers (ANSI) , 201 3 NECA 411 Standard for Installing and Maintaining Uninterruptible Power Supplies (UPS)

(ANSI), 2006 NECA420 Standard for Fuse Applications (ANSI) , 2014 NECA430 Standard for Installing Medium- Voltage Metal-Clad Switchgear (ANSI), 2006 NECA/IESNA 500 Recommended Practice for Installing Indoor Lighting Systems (ANSI) , 2006 NECA/IESNA 501 Recommended Practice for Installing Exterior Lighting Systems (ANSI), 2006 NECA/IESNA 502 Recommended Practice for Installing Industrial Lighting Systems (ANSI), 2006 NECAIBICSI 568 Standard for Installing Building Telecommunications Cabling (ANSI), 2006 3-20

0

        • ~
  • NWMI
  • ~~~~*
  • NOllTMWmM£0fW ISOTOPES NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Table 3-7. Design Codes and Standards (12 pages)

Document number" Document title NECA/NCSCB 600 Recommended Practice for Installing and Maintaining Medium-Voltage Cable (ANSI), 2014 NECAINEMA 605 Installing Underground Nonmetallic Utility Duct (ANSI), 2005 National Electrical Manufacturers Association (NEMA)

NEMAMG-1 Motors and Generators, 2009 InterNational Electrical Testing Association (NETA)

ANSI/NETA ATS-2013 Standard for Acceptance Testing Specifications for Electrical Power Distribution Equipment and Systems, 2013 ANSI/NET A ETT-20 I 0 Standard for Certification of Electrical Testing Technicians, 20 I 0 ANSI/NET A MTS-2011 Maintenance Testing Specifications for Electrical Power Distribution Equipment and Systems, 2011 National Fire Protection Association (NFPA)

NFPA I Fire Code, 2015 NFPA2 Hydrogen Technologies Code, 20 I I NFPA4 Standard for Integrated Fire Protection and Life Safety System Testing, 2015 NFPA 10 Standard for Portable Fire Extinguishers, 2013 NFPA 13 Standard for the Installation of Sprinkler Systems, 2013 NFPA 14 Standard for the Installation of Standpipe and Hose Systems, 2013 NFPA20 Standard for the Installation of Stationary Pumps for Fire Protection, 2013 NFPA22 Standard for Water Tanks for Private Fire Protection, 2013 NFPA24 Standard for the Installation of Private Fire Service Mains and Their Appurtenances, 2013 NFPA 25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, 2014 NFPA30 Flammable and Combustible Liquids Code, 2015 NFPA 37 Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines, 2015 NFPA45 Standard on Fire Protection for Laboratories Using Chemicals, 2015 NFPA 55 Compressed Gases and Cryogenic Fluids Code, 2013 NFPA68 Standard on Explosion Protection by Dejlagration Venting, 2013 NFPA 69 Standard on Explosion Prevention Systems, 2014 NFPA 70 National Electrical Code (NEC), 2014 NFPA 70B Recommended Practice for Electrical Equipment Maintenance, 2013 NFPA 70E Standard for Electrical Safety in the Workplace, 2015 NFPA 72 National Fire Alarm and Signaling Code, 2013 NFPA 75 Standard for the Fire Protection ofInformation Technology Equipment, 2013 NFPA 79 Electrical Standard for Industrial Machinery, 2015 NFPA80 Standard for Fire Doors and Other Opening Protectives, 2013 3-21

...;. NWMI

        • NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

' ~~ * ~

  • NORTHWEST MEOtcAl lSOTOftES Table 3-7. Design Codes and Standards (12 pages)

Document number* Document title NFPA 80A Recommended Practice for Protection of Buildings from Exterior Fire Exposures ,

2012 NFPA 86 Standard/or Ovens and Furnaces, 2015 NFPA 86C Standard/or Industrial Furnaces Using a Special Processing Atmosphere, 1999 NFPA90A Standard/or the Installation ofAir-Conditioning and Ventilating System, 2015 NFPA 90B Standard/or the Installation of Warm Air Heating and Air-Conditioning Systems, 2015 NFPA 91 Standard/or Exhaust Systems for Air Conveying of Vapors, Gases, Mists, and Noncombustible Particulate Solids, 2015 NFPA 92 Standard for Smoke Control Systems, 2012 NFPA92A Standard for Smoke-Control Systems Utilizing Barriers and Pressure Differences, 2009 NFPA 92B Standard for Smoke Management Systems in Malls, Atria, and Large Spaces , 2009 NFPA lOIB Code for Means of Egress for Buildings and Structures , 2002 (W-Next Edition)

NFPA 105 Standard for the Installation of Smoke Door Assemblies and Other Opening Protectives, 2013 NFPA 110 Standard for Emergency and Standby Power Systems, 2013 NFPAlll Standard on Stored Electrical Energy Emergency and Standby Power Systems, 2013 NFPA 170 Standard for Fire Safety and Emergency Symbols, 2012 NFPA 204 Standard/or Smoke and Heat Venting, 2012 NFPA220 Standard on Types ofBuilding Construction, 2015 NFPA 221 Standard for High Challenge Fire Walls, Fire Walls, and Fire Barrier Walls , 2015 NFPA262 Standard Method of Test for Flame Travel and Smoke of Wires and Cables for Use in Air-Handling Spaces, 2015 NFPA 297 Guide on Principles and Practices/or Communications Systems, 1995 NFPA329 Recommended Practice for Handling Releases ofFlammable and Combustible Liquids and Gases, 2015 NFPA400 Hazardous Materials Code, 2013 NFPA496 Standard for Purged and Pressurized Enclosures for Electrical Equipment, 2013 NFPA497 Recommended Practice for the Classification of Flammable Liquids, Gases, or Vapors and of Hazardous (Classified) Locations for Electrical In stallations in Chemical Process Areas, 2012 NFPA 704 Standard System for the Identification of the Hazards of Materials for Emergency Response, 2012 NFPA 730 Guide for Premises Security, 2014 NFPA 731 Standard for the Installation of Electronic Premises Security Systems, 2015 NFPA 780 Standard for the Installation of Lightning Protection Systems, 2014 NFPA 791 Recommended Practice and Procedures for Unlabeled Electrical Equipment Evaluation, 201 3-22

....; NWMI

      • . NWMl-2013-021, Rev. 3 Chapter 3. 0 - Design of Structures, Systems and Components

~* *~ . NORllfWUT MEDICAL tsOTOffS Table 3-7. Design Codes and Standards (12 pages)

Document number* Document title NFPA 801 Standard for Fire Protection for Facilities Handling Radioactive Materials, 2014 Sheet Metal and Air Conditioning Contractors National Association (SMACNA)

National Oceanic and Atmospheric Administration (NOAA)

NOAA Atlas 14 Precipitation-Frequency Atlas of the United States, Vol. 8 Version 2.0, 2013 SMACNA 1143 HVAC Air Duct Leakage Test, 1985 SMACNA 1520 Round Industrial Duct Construction Standard, 1999 SMACNA 1922 Rectangular Industrial Duct Construction Standard, 2004 SMACNA 1966 HVAC Duct Construction Standard -Metal and Flexible, 2006 SMACNA-2006 HVAC Systems Duct Design , 2006 ANSUSMACNA 001-2008 Seismic Restraint Manual: Guidelines for Mechanical Systems, 2008 U.S. Weather Bureau Technical Paper No. 40 Rainfall Frequency Atlas of the United States for Durations from 30 Minutes to 24 Hours and Return Periods from 1 to JOO Years, 1963 Underwriters Laboratory, Inc. (UL) Federal Specifications UL 181 Standard for Factory-Made Air Ducts and Connectors, 2013 UL499 Standard for Electric Heating Appliances, 2014 UL555 Standard for Fire Dampers, 2006 UL 586 Standard for High Efficiency, Particulate, Air Filter Units, 2009 UL900 Standard for Air Filter Units, 2004 UL 1995 Heating and Cooling Equipment, 2011

  • Complete references are provided in Section 3.6 ACGIH American Conference on Governmental IAEA International Atomic Energy Agency.

Industrial Hygienists. ICC international Code Council.

ACI American Co ncrete Institute. ICC-ES International Code Council Evaluation Service.

AHRI Air Conditioning, Heating and Refrigerati on IEEE Institute of Electrical and Electronics Engineers.

Institute. JES llluminating Engineering Society.

AISC American Institute of Steel Construction . ISA International Society of Automation .

AMCA Air Movement and Control Association. NECA National Electrical Contractors Association.

ANS American Nuclear Society. NEMA National Electrical Manufacturers Association .

ANSI American National Standards Institute. NETA InterNational Electrical Testing Association.

ASCE American Society of Civil Engineers. NFPA National Fire Protection Association.

ASHRAE American Society of Heating, Refrigerati on NIOSH National Institute for Occupational Safety and and Air-Conditioning Engineers. Health.

ASME American Society of Mechanical Engineers. NOAA National Oceanic and Atmospheric ASNT American Society for Nondestructive Administration Testing. SMACNA Sheet Metal and Air Conditioning Contractors ASTM American Society for Testing and Materials. National Association.

AWS American Welding Society. TIA Telecommunications Industry Association.

CDC Centers for Disease Control and Prevention. UL Underwriters Laboratory.

EIA Electronic Industries Alliance.

3-23

........;...NWMI

' ~ * .* ~ . NOmlWEIHIEOtCAl ISOTOl'l.S NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components 3.2 METEOROLOGICAL DAMAGE RPF meteorological accidents with radiological consequences are evaluated in NWMI-2015-SAFETY-Ol l ,

Evaluation of Natural Phenomenon and Man-Made Events on Safety Features and Items Relied on for Safety. The basis for the structural design ofthe RPF is described in NWMI-2013-043 , NWMJ Radioisotope Production Facility Structural Design Basis .

Updates and development of technical specifications associated with the meteorological design of the RPF SSCs will be provided in Chapter 14.0 as part of the Operating License Application.

The demands on structural elements due to applied loads are evaluated using the criteria and methodology discussed below. The effect of each load case is determined separately, and total demand is determined by combining the load effects using the load combinations for evaluating strength and evaluating the serviceability criteria given below.

Four categories ofload cases are used: normal, severe environmental, extreme environmental, and abnormal loads. The definition of each load is the following:

  • Normal loads are loads that are expected to be encountered during normal plant operations and shutdown, and load due to natural hazard phenomena likely to be encountered during the service life of the facility.
  • Severe environmental loads are loads that may be encountered infrequently during the service life of the facility.
  • Extreme environmental loads are loads that are credible but are highly improbable to occur during the service life of the facility.
  • Abnormal loads are loads generated by a postulated high-energy pipe break accident used as a design basis.

Definitions of load case symbols are provided in Table 3-8.

Table 3-8. Load Symbol Definitions (2 pages)

Symbol Definition Normal Load Cases D Dead loads due to the weight of the structural elements, fixed-position equipment, and other permanent appurtenant items; weight of crane trolley and bridge F Load due to fluids with well-defined pressures and maximum heights H Load due to lateral earth pressure, groundwater pressure, or pressure of bulk materials L Live load due to occupancy and moveable equipment, including impact L, Rooflive load Ccr Rated capacity of crane (will include the maximum wheel loads of the crane and the vertical, lateral ,

and longitudinal forces induced by the moving crane)

S Snow load as stipulated in ASCE 7* for risk category IV facilities R Rain load T0 Self-staining load, thermal effects, and loads during normal operating, startup, or shutdown conditions, based on the most critical transient or steady-state condition 3-24

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Table 3-8. Load Symbol Definitions (2 pages)

Symbol Definition Ro Pipe reactions during normal operating, startup , or shutdown conditions, based on the most critical transient or steady-state condition Severe Environmental Load Cases D; Weight of ice Fa Flood load W Load due to wind pressure Wa Load based on serviceability wind speed W; Wind-on-ice Eo Where required as part of the design basis, loads generated by the operating basis earthquake, as defined in 10 CFR 50,b Appendix S, "Earthquake Engineering Criteria for Nuclear Power Plants," or as specified by the authority having jurisdiction Extreme Environmental Load Cases S, Weight of the 48-hour probable maximum winter precipitation superimposed on S W, Loads generated by the specified design basis tornado, including wi nd pressures, pressure differentials, and tornado-borne missiles, as defined in NUREG-0800,c or as specified by the authority having jurisdiction Ess Loads generated by the safe shutdown, or design basis earthquake, as defined in 10 CFR 50,b Appendix S, or as specified by the authority having jurisdiction Abnormal Load Cases Pa Maximum differential pressure load generated by the postulated accident Ra Pipe and equipment reactions generated by the postulated accident, including Ro Ta Thermal loads generated by the postulated accident, including T 0 Yj Jet impingement load generated by the postulated accident Ym Missile impact load, such as pipe whip generated by or during the postulated accident Y, Loads on the structure generated by the reaction of the broken high-energy pipe during the postulated accident

b I 0 CFR 50, " Domestic Licensing of Producti on and Utili zati on Faci lities," Code of Federal Regulations, Office of the Federal Register, as amended.

c NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports f or Nuclear Power Plants, LWR Edition, U.S. N uclear Regu latory Commission, O ffice of Nuclear Material Safety and Safeguards, Washin gton, D.C. , 1987 .

3.2.1 Combinations of Loads Load combinations used for evaluating strength and serviceability are given in the following subsections.

Combinations for strength-based acceptance criteri a are given for both nuclear safety-related SSCs and for commercial SSCs.

3-25

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components 3.2.1.1 Nuclear Safety-Related Structures, Systems, and Components For nuclear safety-related SSCs, the loading combinations from ACI 349, Code Requirements for Nuclear Safety-Related Concrete Structures and Commentary, are used . The load combinations from ACI 349 are essentially identical to the combination from ANSI/ AISC N690, Specification for Safety-Related Steel Structures for Nuclear Facilities . Table 3-9 presents nuclear safety-related SSC loads. In addition, the load combination for extreme winter precipitation load (S,) takes DC/COL-ISG-007, Interim Staff Guidance on Assessment of Normal and Extreme Winter Precipitation Loads on the Roofs of Seismic Category I Structures, guidance into account.

Table 3-9. Load Com binations for Strength Based Acceptance Criteria, Nuclear Safety-Related Combination *HHG+ ANSl/AISC N690b Normal Load Combinations l.4(D + F + R,,) +To (9-1) (NB2-l) l .2(D + F + T 0 + R,,) + l .6(L + H) + l .4Ccr + 0.5(L, or S or R) (9-2) (NB2-2) l .2(D + F + R,,) + 0.8(L + H) + l .4Ccr + l .6(Lr or S or R) (9-3) (NB2-3)

Severe Environmental Load Combinations l.2(D + F + R,,) + 1.6(L + H + Eo) (9-4) (NB2-4) 1.2(D + F + R,,) + 1.6(L + H + W) (9-5) (NB2-5)

Extreme Environmental and Abnormal Load Combinations D + F + 0.8L + Ccr + H + To+ R,, + Ess (9-6) (NB2-6)

D + F+ 0.8L + H +To+ R,, + W, (9-7) (NB2-7)

D + F + 0.8L + Ccr + H + Ta+ Ra + l.2Pa (9-8) (NB2-8)

D + F + 0.8L + H + T. + Ra+ Pa+ Y, + Yj + y m + Ess (9-9) (NB2-9)

D + F + 0.8L + Ccr + H + To+ R,, + S, a ACI 349, Code Requirements fo r Nuclear Safety-Related Concrete Structures and Commenta1y, Ameri can Concrete Institute, Farmington Hills, Michigan, 201 3.

h ANSV AISC N690, Specification fo r Safety-Related Steel Structures for Nuclear Facilities, American Institute of Steel Construction, Chicago, Illinois, January 3 1, 2012.

3.2.1.2 Commercial and Nuclear Non-Safety-Related Structures, Systems, and Components For commercial and nuclear non-safety-related SSCs, the loading combinations from American Society of Ci vil Engineers (ASCE) 7, Chapter 2 are used. When the loading includes earthquake effects, the special seismic load combinations are taken from ASCE 7, Minimum Design Loads for Buildings and Other Structures, Chapter 12. The basic load combinations for the strength design of commercial type and non-safety-related nuclear SSCs are given in Table 3-10. The combinations listed are obtained from the 2012 International Building Code (IBC) and ASCE 7. The crane live load case (Ccr) is separated from other live loads in the combinations for design purposes.

3-26

..NWMI

..* NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

' ~-.. ~

  • NOMTMWESTMEOICALISOTOP£S Table 3-10. Load Combinations for Strength Base Acceptance Criteria, Commercial Combination IBC* ASCE 7b Basic Load Combinations l.4(D +F) (16-1) l .2(D + F) + l .6(L + Ccr + H) + 0.5(L, or Sor R) (16-2) 2 l.2(D + F) + l.6(L, or Sor R) + l .6H + l/1(L + Ccr) or 0.5W] (16-3) 3 1.2(D + F) + I.OW + f 1(L + Cc,)+ 1.6H + 0.5(L, or Sor R) (16-4) 4 l.2(D + F) + I.OE+ f 1(L + Ccr) + l.6H + f2S (16-5) 5 0.9D+ I.OW+ l.6H (16-6) 6 0.9(D + F) + I .OE+ l .6H (16-7) 7 Load Combinations, including Flood Load l.2D + (0.5W + I.OF a)+ L + 0.5(L, or Sor R) §1605.2.l §2.3.3.2 0.9D + (0.5W + I .OF a) §1605.2.1 §2.3.3 .2 Load Combinations, including Atmospheric Ice l .2D + l .6L +(0.2Di + 0.5S) §1605 .2.1 §2.3 .4.1 l .2D + L +(Di+ Wi + 0.5S) §1605.2.1 §2.3.4.2 0.9D + (Di + Wi) §1605.2.1 §2.3.4.3 Where:

fl = 0.5 for other live loads.

f2 = 0.7 for flat roof configurations, which do not shed snow, and 0.2 for other roof configurations a IBC 2012, International Building Code, International Code Council, Inc., Washington D.C.

b ASCE 7, Minimum Design Loads for Buildings and Other Structures, American Society of Civil Engineers, Reston, Virginia, 2010.

3.2.2 Combinations for Serviceability Based Acceptance Criteria Based on ASCE 7, Appendix C Commentary, Table 3-11. Load Combinations for Serviceability the load combinations given in Table 3-11 are Based Acceptance Criteria used when evaluating serviceability based acceptance criteria. Combination ASCE7 Short-Term Effects 3.2.3 Normal Loads D+L (CC-la)

The RPF is required to resist loads due to: D + 0.5S (CC-lb)

Creep, Settlement and Similar Long-Term of Permanent

  • Operating conditions of the systems Effects and components within the RPF D + 0.5L (CC-2)
  • Normal and severe natural phenomena Drift of Walls and Frames hazards, remaining operational to D + 0.5L + Wa (CC-3) maintain life-safety and safety-related Seismic Drift SS Cs Per ASCE 7, Section 12.8.6
  • Extreme natural phenomena hazards, a Appendix C, Commentary, of ASCE 7, Minimum Design maintaining life-safety and safety- Loads for Buildings and Other Structures, American Society of related SSCs Civil Engineers, Reston, Virginia, 20 13 .

3-27

..*  ;*. . NWMI NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

. * ~* * ~ . NORTHWEST MEOfCAl ISOTOPH Structural loads are due to the following:

  • Self-weight of building materials and SSCs
  • Occupancy and normal use of the RPF
  • Off-normal conditions and accidents
  • Natural phenomena hazards Section 3.1 describes the structural discipline source requirements for these criteria. Structural load criteria are summarized below. Site-specific natural phenomena hazard criteria are based on the physical location of the RPF given in Chapter 2.0, Sections 2.3 and 2.5.

3.2.3.1.1 Dead Loads Dead loads consist of the weight of all materials of construction comprising the building, including walls, floors , roofs, ceilings, confinement doors, stairways, built-in partitions, wall and floor finishes, and cladding. Dead loads also consist of the weight of fixed equipment, including the weight of cranes. The density of all interconnections (e.g., heating, ventilation, and air conditioning [HV AC] ductwork, conduits, cable trays, and piping) between equipment will be conservatively estimated and included in the final design for dead load for fixtures attached to ceilings or anchored to floors in the RPF .

3.2.3.1.2 Lateral Earth and Ground Water Pressure Loads Lateral earth and groundwater pressure loads are lateral pressures due to the weight of adjacent soil and groundwater, respectively. The design lateral earth load is a function of the composition of the soil. The Discovery Ridge Phase 1 Environmental Assessment (Terracon, 201 la) indicates that the soils present are clayey gravels consistent with the Unified Soil Classification "GC." In addition, the assessment indicates that expansive soils are present. Chapter 2.0, Section 2.5.3 presents additional on-site soil information.

The design lateral earth pressure load for the RPF is based on ASCE 7, Table 3 .2.1, and has been augmented to account for the expansive soils (e.g., surcharge load is applied to account for the weight of the facility above the soils adjacent to the tank hot cell).

The design groundwater depth is estimated to be Table 3-12. Lateral Earth Pressure Loads approximately 5.5 meters (m) (18 feet [ft]) below-ground surface and will be verified pending final Element Value geotechnical investigation. Additional information Base design lateral soil load 45 lb/ft 2 per ft is presented in Chapter 2.0, Section 2.4.2.

Design lateral load (expansive increase) 60 lb/ft 2 per ft The lateral earth pressure loads for the RPF are

Reference:

Table 3.2-1 of ASCE 7, Minimum Design Loads presented in Table 3-12. for Buildings and Other Structures, American Society of Civil Engineers, Reston, Virginia, 2013 .

3-28

......;.... NWMI

...... NWMl-2013-021 , Rev. 3

. ~ ~ .! . NOATHWHT M£00CA1. tSOTons Chapter 3.0 - Design of Structures, Systems and Components 3.2.3.1.3 Live Loads Floor Live Load Table 3-13. Floor Live Loads Live loads are produced by the use and occupancy Description Uniform Concentrated of the RPF, and as such, different live load 2

magnitudes are appropriate for different areas of Production area 250 lb/ft 3,000 lb the facility. Design floor loads provided in Hot cell roof TBD TBD Table 3-13 are based on ASCE 7, Sections 4.3 and Cover block laydown TBD TBD 4.4, and Section C4.3 Commentary. 2 Mechanical rooms 200 lb/ft 2,000 lb During the structural analysis, unknown loads Laboratory I 00 lb/ft 2 2,000 lb (e.g., hot cell roof in Table 3-13) will have a conservative value assumed and marked with Office 50 lb/ft 2 2,000 lb

"(HOLD)." As the design matures, the actual 2 Office partitions 20 lb/ft values will be inserted in the analysis and the Corridors I 00 lb/ft 2 HOLDs removed. Final design media cannot be Truck bay Per AASHTO issued if there are HOLDs identified. The facility live loads will be established during the Based on Sections 4.3 , 4.4, and C4.3 Commentary of ASCE 7, completion of the final facility design and Minimum Design Loads for Buildings and Other Structures, American Society of Civil Engineers, Reston, Virginia, 2013.

provided as part of the Operating License Application. AASHTO American Association of State Highway and Transportation Officials.

Roof Live Load TBD to be determined.

The minimum roof live load (Lr) prescribed by the City of Columbia is 20 pounds (lb)/square foot (ft2),

non-reducible (Ordnance No. 21804, Section 6-17). Snow loads (e.g., normal and extreme rain-on-snow) are discussed separately in Section 3.2.5.2.

Crane Loads The design basis crane load criteria are given in Table 3-14. Crane Load Criteria Table 3-14 and are based on a preliminary quote provided in NWMI-2015-SDD-001 , RPF Facility Element Value SDD. The crane design is to run a top-running Crane capacity 75 ton (150 kip) bridge crane with a remotely operated, powered Crane weight (with hoists) 69,990 lbf bridge and hoist.

Bridge weight 62,330 !bf The crane design basis will be refined in the final design and Operating License Application to Hoist and trolley weight 7,660 !bf account for the following: Wheel load (static) 54.3 kip

  • ASCE 7, Chapter 3 - Include weights of crane and runway beams in dead loads
  • ASCE 7, Chapter 4 - Increase wheel load by 25 percent to account for vertical impact
  • ASCE 7, Chapter 4 - Determine lateral force by multiplying sum of hoist and trolley weight and rated capacity of crane by 20 percent
  • ASCE 7, Chapter 4 - Determine longitudinal force by multiplying the wheel load by 10 percent 3-29

.;... NWMI NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

. ~ *-* ! . NORTKW£ST MEDICAl ISOTOns 3.2.4 Wind Loading 3.2.4.1 Wind Load PerNUREG-1537, Section 2.3.1, "General and Local Climate, wind loads will be based on the 100-year return period wind speed. In addition, based on NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants, Section 3.3.1, the wind speed will be transformed to equivalent pressure per ASCE 7-05 . For RPF SSCs per current applicable 2012 IBC guidance, ASCE 7-10 is used for this transformation of wind speed to equivalent pressure. From Table 1.5-1 of ASCE 7-10 and based on use and occupancy of the RPF, a Risk Category IV is assigned to RPF SSCs.

Figure 26.5-lB for a Risk Category IV building of ASCE 7-10 is used to obtain the basic wind speed for the RPF site.

The mean recurrence interval (MRI) of the basic wind speed for Risk Category IV buildings is 1,700 years. Since the MRI stipulated in ASCE 7-10 is more stringent than NUREG-1537 100-year wind speeds, wind loads will be determined in accordance with ASCE 7-10, Chapters 26 through 30, as applicable, for a Risk Category IV building.

The surface roughness surrounding RFP SSCs Table 3-15. Wind Loading Criteria is currently Surface Category C, which in turn Element Value indicates Exposure Category C for the RFP per Basic wind speed, V 193.1 km/hr (120 mi/hr)

ASCE 7-10. The RPF main building is an Exposure category c enclosed building. The wind loading criteria Enclosure classification Enclosed are provided in Table 3-15 . The basic wind Risk category IV speed given in Table 3-15 is a 3-second (sec) gust wind speed at 10 m (33 ft) aboveground Source: ASCE 7-10, Minimum Design Loads f or Buildings and Other Structures, American Society of Civil Engineers, Reston, for Exposure Category C and Risk Category IV. Virginia, 2010.

The wind loading criteria will be updated in the Operating License Application.

3.2.4.2 Tornado Loading Tornado loads are a combination of tornado wind effects, atmospheric pressure change, and tornado-generated missile impact effects and are discussed separately in the following sections. NUREG-1520, Standard Review Plan for the Review of a License Application for a Fuel Cy cle Facility, Part 3, Appendix D, states that an annual exceedance probability of 10-5 may need to be considered. The maximum tornado wind speed from NRC Regulatory Guide 1. 76, Design-Basis Tornado and Tornado Missiles for Nuclear Power Plants, for Region I, has an annual exceedance probability of 10- 7 that is significantly lower than the target probability stated in NUREG-1520.

For the RPF preliminary safety analysis report, the maximum tornado wind speed from NRC Regulatory Guide 1.76 for Region I will be used. The tornado load criteria will be updated by using tornado loading in accordance with 10-5 annual probability of exceedance in the Operating License Application.

3-30

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components 3.2.4.2.1 Maximum Tornado Wind Speed Tornado wind field characteristics used to Table 3-16. Design-Basis Tornado Field Characteristics calculate tornado wind pressures on the RPF are provided in Table 3-16 per NRC Description Value Regulatory Guide 1.76. The maximum Tornado region Region I tornado wind speed has two components:

Maximum wind speed 370.l km/hr (230 mi/hr) translational and rotational. The maximum total tornado wind speed is the Translational speed 74.0 km/hr (46 mi/hr) sum of these two components and is Radius of maximum rotational speed 45.7 m (150 ft) applied to the RPF building from each Pressure drop, t.P (1.2 lb/in. 2) direction separately. Based on Source: NRC Regulatory Guide I.76, Design-Basis Tornado and NUREG-0800, Section 3.3 .2, ASCE 7-05 Tornado Missiles for Nuclear Power Plants, Rev. I, U.S. Nuclear may be used to transform maximum Regulatory Commission, Washington, D.C., March 2007.

tornado wind speed to equivalent pressure.

For RPF SSCs per current applicable 2012 IBC guidance, Chapters 26 and 27 of ASCE 7-10 is used for this transformation of tornado wind speed to equivalent pressure. From Table 1.5-1 of ASCE 7-10 and based on use and occupancy of the RPF, a Risk Category IV is assigned to RPF SSCs. Per NUREG-800, Section 3.3 .2, tornado wind speed is assumed not to vary with the height aboveground. Additional information is provided in Chapter 2.0, Section 2.3 .1.5, and Chapter 13.0, Section 13.2.6.1.

3.2.4.2.2 Atmospheric Pressure Change NRC Regulatory Guide 1.76 provides guidance for determining the pressure drop and the rate of pressure drop caused by the passing of a tornado. Depending on the final design of the RPF building and whether it is enclosed (unvented) or partially enclosed (vented structure), the procedures outlined in NUREG-800 Section 3.3.2 will be used to account for atmospheric pressure change effects. At the preliminary stage of the design, the RPF building is known not to be open. The value for atmospheric pressure drop, corresponding to the design-basis tornado is given in Table 3-16.

3.2.4.2.3 High Straight-Line Winds Similar to the tornado, high straight-line winds can also damage the facility structure, which in tum can lead to damage to SSCs relied on for safety. This evaluation demonstrates how the facility design addressed straight-line winds with a return interval of 100 years or more, as required by building codes.

The RPF is designed as a Risk Category IV structure, a standard industrial facility with equivalent chemical hazards, in accordance with ASCE 7. The return frequency of the basic (design) wind speed for Risk Category IV structures is 5.88 x l0-4/year (MRI = 1,700 year). The provisions of ASCE 7, when used with companion standards such as American Concrete Institute (ACI) 318, Building Code Requirements for Structural Concrete, and American Institute of Steel Construction (AISC) 360, Specification for Structural Steel Buildings, are written to achieve the target maximum annual probabilities of established in ASCE 7. The highest maximum probability of failure targeted for Risk Category JV structures is 5.0 x 10-6 .

3.2.4.2.4 Tornado-Generated Missile Impact Effects The missile is assumed rigid in this analysis for maximum penetration. Note that in Columbia, Missouri ,

the location of the University of Missouri Research Reactor (MURR) facility, the expected speed of tornado missiles is larger than the expected speed of any hurricane-generated missiles at the same annual frequency of exceedance (NUREG/CR-7005, Technical Basis for Regulatory Guidance on Design-Basis Hurricane Wind Speeds for Nuclear Power Plants).

3-31

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Tornado-generated missile impact effects are based on the standard design missile spectrum from NRC Regulatory Guide 1.76 and are presented in Table 3-17. In addition, wind velocities in excess of 34 m/sec (75 mi/hr) are capable of generating missiles from objects lying within the path of the tornado wind and from the debris of nearby damaged structures per Regulatory Guide I .76.

These requirements are considered more severe than the characteristics from DOE-STD-I 020, Natural Phenomena Hazards Design and Evaluation Criteria for Department of Energy Facilities, that are cited in NUREG-1520, Section 3. The recommended RPF roof and wall system design criteria are also taken from DOE-STD-1020, Table 3-4.

Table 3-17. Design-Basis Tornado Missile Spectrum Description M,i¢fMijM Dimensions Horizontal velocity Vertical velocity Automobile 4,000 lb 16.4 ft x 6.6 ft x 4.3 ft 92 mi/hr 62 mi/hr Pipe 287 lb 6.625 in. diameter x 15 ft long 92 mi/hr 62 mi/hr Steel Sphere 0.147 lb 1.0 in. diameter 18 mi/hr 12 mi/hr Source: NRC Regulatory Guide 1.76, Design-Basis Tornado and Tornado Missiles fo r Nuclear Power Plants, U.S.

Nuclear Regulatory Commission, Washington, D.C., March 2007.

The impact-type missile, an automobile is limited to a height of no more than 9.1 m (30 ft) above-grade.

Structural wall openings are subjected to the impact ofa 0.25 centimeters (cm) (I-inch [in.]) diameter steel sphere. The vertical velocities are taken as 0.67 of the horizontal velocity. For an automobile and pipe missile, a normal impact is assumed. The tornado load criteria will be updated by using tornado loading in accordance with I 0- 5 annual probability of exceedance in the Operating License Application and accordingly, the design-basis tornado missile spectrum will also be updated. Note that in Columbia, Missouri, the location of the MURR facility, the expected speed of tornado missiles is larger than the expected speed of any hurricane-generated missiles at the same annual frequency of exceedance (NUREG/CR- 7005).

3.2.4.2.5 Combined Tornado Load Effects After tornado-generated wind pressure effects, atmospheric pressure change effects and missile impact effects are determined; the combination thereof will be established in accordance with procedures outlined n NUREG-800, Section 3.3.2. The effect of atmospheric pressure drop by itself will be considered, and the total effects of wind pressure and missile impact effects with one-half of the atmospheric pressure drop effects will be considered jointly.

3.2.4.3 Effect of Failure of Structures, Systems, or Components Not Designed for Tornado Loads SSCs, in which failure during a tornado event could affect the safety-related portions of the RPF, are either designed to:

  • Resist the tornado loading or the effect on the safety-related structures from the failure of these SSCs
  • Be bounded by the tornado missile or aircraft impact evaluations The effects and mitigations of failure of SSCs not designed for tornado loads will be developed during final design and the Operating License Application.

3-32

....; NWMI

      • -:- NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures , Systems and Components
  • *~~!~*
  • NOlmlWESTMEDfCALISOTOPEI 3.2.5 Rain, Snow, and Ice Loading 3.2.5.1 Rain Loads From the National Weather Service (NWS)/National Oceanic and Atmospheric Administration (NOAA)

Hydrometeorological Report No. 51, Probable Maximum Precipitation Estimates, United States East of the 105th Meridian , the probable maximum precipitation (PMP) is defined as "theoretical greatest depth of precipitation for a given duration that is physically possible over a particular drainage area at a certain time of year."

Per NUREG-1 537, Section 2.3 .1, "General and Local Climate," rain loads will be based on the estimate of the weight of the 48-hour (hr) probable maximum precipitation, as specified by the U.S. Geological Survey. This rain load estimate is compared with the local building code rain load (i.e., ASCE 7-10), and the greater value is used in design of the RPF roof.

The roof of the RPF is designed to prevent rainwater from accumulating on the roof. In accordance with 2012 IBC and ASCE 7-10, the roof structure is designed to safely support the weight ofrainwater accumulation with the primary drainage system blocked and the secondary drainage system at its design flow rate when subjected to a rainfall intensity based on the 48-hr probable maximum precipitation.

Rain loads are determined by the amount Table 3-18. Rain Load Criteria of water that can accumulate on the undeflected building roof if the primary Element Value drainage system becomes blocked (static Static head 5 cm (2-in) head), plus a uniform depth of water above Hydraulic head TBD the inlet of the secondary drainage system Rainfall intensity 3. 14 in./hr" at its design flow (hydraulic head). The a NOAA Atlas 14, Precipitation-Frequency Atlas of the Un ited rain load criteria are determined per States, Volume 8, Version 2.0: Midwestern States, National Oceanic and ASCE 7-10, Chapter 8, and are provided Atmospheric Administration , Si lver Spring, Maryland , 2013.

in Table 3-1 8. TBD = to be determined.

The hydraulic head is dependent on the roof drain size, roof area drained, and the rainfall intensity. The rainfall intensity used to determine the hydrauli c head is taken from NOAA Atlas 14, Precipitation-Frequency Atlas of the United States, web tool for the 100-year storm, 1-hr duration.

The rain load criteria wi ll be updated in the Operating License Application.

3.2.5.2 Snow Load Per the guidance in DC/COL-ISG-007, two types of snow load are considered: normal snow load and the extreme winter precipitation load. The normal snow load will be included in normal load combinations given below. Per the guidance in the DC/COL-ISG-007, the extreme winter precipitation load is included in the extreme environmental load combinations.

The snow load criteria will be updated in the Operating License Application.

3.2.5.2.1 Normal Snow Load PerNUREG-1537, Section 2.3.1 and DC/COL-ISG-007, the normal snow load is the 100-year ground snow, modified using the procedures of ASCE 7 to determine the roof snow load, including snow drifting.

The 100-year ground snow load is calculated by factori ng the ground snow load stipulated in the City of Columbia Code of Ordinances amendments (City of Columbia, 20 14) and IBC 2012 and is equivalent to the mapped ground snow load from Figure 7-1 of ASCE 7. This information is determined using the conversion factor provided in ASCE 7, Table C7-3.

3-33

  • i*:~:* NWM I

...... NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

~* * ~ NORTHWEST MEDtcAL ISOTOH.I The exposure factor provided in ASCE 7, Table 3-19. Snow Load Criteria Table 7-2, for partially exposed roof in terrain category C is similar with the exposure used Element 't1!11*

Mapped ground snow load (50-year) *20 lb/ft 2 for determining wind loads. Since the RPF Conversion factor, 100-year to 50-year b0.82 does not fall into any of the special cases indicated in ASCE 7, Table 7-3, the thermal Design ground snow load, pg (JOO-year) 24.4 lb/ft 2 factor is assumed to be 1.0. Exposure factor (Ce) I.Ob Thermal factor (C,) I.Ob The importance factor is taken to be unity Importance factor I.Ob from ASCE 7-10, Table 1.5-2, for the RPF, a City of Columbia, "City of Columbia Code of Ordinances,"

which is designated Risk Category IV. www.gocolumbiamo.com/Council/Code_of_ Ordinances_PDF/,

Snow load criteria are summarized in accessed September 8, 20 I 4.

Table 3-19. b ASCE 7, Minimum Design Loads for Buildings and Other Structures, American Society of Civil Engineers, Reston, Virginia, 2013.

3.2.5.2.2 Extreme Winter Precipitation Load Per NUREG-1537, Section 2.3 .1 and DC/COL-ISG-007, the extreme winter precipitation load is the normal snow load as presented in Section 3.2.5.2.1 , plus the liquid weight of the 48-hr probable maximum winter precipitation (PMWP).

The 48-hr PMWP is determined from the Table 3-20. Extreme Winter Precipitation Load NOAA/NWS Hydrometeorological Report Criteria (HR) 53 , Seasonal Variation of 10-Square-Mile Probable Maximum Precipitation Element Value Estimates, United States East of the 105th 24-hr, I O-mi 2 PMWP 46.7 cm (18.2 in.)*

Meridian, for a 10-mi 2 area. HR 53 gives mid-72-hr, 10-mi 2 PMWP 56.9 cm (22.5 in.)*

month PMP estimates for six 24- and 72-hr 2

durations. Based on the example of variation 48-hr, 1O-mi PMWP (interpolated) 22 .2 cm (8.73 in.)b of PMP depths given in HR 53, Figure 46, the Weight of 48-hr PMWP 106 lb/ft 2 48-hr PMP is linearly interpolated from the a NWS/NOAA HR 53 , Seasonal Variation of JO-Square-Mile 24- and 72-hr PMP depths and gives a PMWP Probable Maximum Precipitation Estimates, United States East of of 51.8 cm (20.4 in.). However, using the the 105th Meridian , National Oceanic and Atmospheric NOAA web tool for Columbia (NOAA, 2017), Administration, Silver Spring, Maryland, I 980.

b NOAA, 2017, "NOAA Atlas 14 Point Precipitation a two-day (48-hr) average 100-year rain is Frequency Estimates: Mo," https://hdsc.nws. noaa.gov/hdsc/pfds/

22.2 cm (8.73 in.) precipitation. The months pfds_map_cont.htrnl?bkmrk=rno, National Oceanic and Atmospheric of December, January, February, and March Administration, Si lver Spring, Maryland, accessed 20 17.

were used to determine the PMWP. In PMWP probable maximum winter precipitation.

addition, using HR 53, Figures 26 through 45, the PMWP was determined to occur in the month of March. The PMWP criteria are given in Table 3-20.

Winter weather events since 1996 in Boone County, Missouri, are provided in Chapter 2.0, Table 2-36.

3-34

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components 3.2.5.3 Atmospheric Ice Load Table 3-21. Atmospheric Ice Load Criteria For SSCs to be considered sensitive to ice, the Element Value*

ice thickness and concurrent wind loads are Ice thickness (50-year) 2.54 cm (1 in.)

determined using the procedures in ASCE 7, Concurrent wind speed 64.4 km/hr (40 mi/hr)

Chapter 10. Consistent with the requirements Ice thickness MRI multiplier 1.25 for snow and wind loads, the mapped values are converted to 100-year values using the Wind speed MRI multiplier 1.00 MRI multipliers given in ASCE 7, Table Cl0-1. Importance factor 1.00 Criteria for ice loading are given in

MRI = mean recurrence interval.

3.2.6 Operating ThermaUSelf-Straining Loads The operating thermal/self-straining loads will be evaluated in the Operating License Application. These loads will be consistent with the requirements of ACI 349 or ANSl/AISC N690, as applicable to the material of construction.

3.2. 7 Operating Pipe Reaction Loads The operating pipe reaction loads will be evaluated in the Operating License Application. These loads will be consistent with the requirements of applicable American Society of Mechanical Engineers (ASME) B31 , Standards of Pressure Piping, codes.

3.2.8 External Hazards External hazards include aircraft impact, external explosions, and external fire . The RPF is a production facility, as opposed to a nuclear power reactor, as such 10 CFR 50.150(a)(3) is interpreted to mean that the requirement for the aircraft impact assessment is not applicable to this facility. Sources of accidental external explosions have been considered and were found to not be an accident of concern. The RPF is constructed of robust, noncombustible materials, and adequate setbacks from transportation routes and landscaping consisting of fire fuels are provided such that externals fires are not an accident of concern.

3-35

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components 3.3 WATER DAMAGE This section identifies the requirements and guidance for the water damage design of the RPF SSCs.

NUREG-15 20 and ASCE 7, Chapter 5, provide guidance on flood protection of nuclear safety-related SSCs. Updates and development of technical specifications associated with the water damage design of the RPF SSCs will be provided in Chapter 14.0 as part of the Operating License Appli cation.

3.3.1 Flood Protection This subsection discusses the flood protection measures that are applicable to safety-related SSCs for both external flooding and postulated flooding from failures of facility components containing liquid. A compliance review will be conducted of the as-bui lt design against the assumptions and requirements that are the basis of the flood evaluation presented below.

Additional information is presented in Chapter 2.0, Section 2.4.3 and Chapter 13.0, Section 13.2.6.4.

This as-built evaluation will be documented in a flood analysis report and be part of the Operating License Application.

3.3.l.1 Flood Protection Measures for Structures, Systems, and Components 3.3.1.1.1 Flooding from Precipitation Events Regional flooding from large precipitation events raising the water levels of local streams and rivers to above the 500-year flood level can have an adverse impact on the structure and SSCs within . These impacts include the structural damage from water and the damage to power supplies and instrument control systems for SSCs relied on for safety. The infiltration of flood water into the facil ity could cause the failure of moderation control requirements and lead to an accidental nuclear criticality. Direct damage or impairment of SSCs could also be caused by flooding in the facility.

The site will be graded to direct the stormwater from localized downpours with a rainfall intensity for the 100-year storm for a I-hr duration around and away from the RPF . Thus, no flooding from local downpours is expected based on standard industrial design. Rainwater that falls on the waste management truck ramp and accumulates in the trench drain has low to no consequence for radiological ,

chemical, and criticality hazards.

Situated on a ridge, the RPF will be located above the 500-year flood plain according to the flood insurance rate map for Boone County, Missouri, Panel 295 (FEMA, 2011). The site is above the elevation of the nearest bodies of water (two small ponds and a lake), and no dams are located upstream on the local streams. This data conservatively provides a 2x I 0-3 year return frequency flood, which can be considered an unlikely event according to performance criteria. However, the site is located at an elevation of 248.4 m (815 ft), and the 500-year flood plain starts at an elevation of 231 .6 m (760 ft) , or 16.8 m (55 ft) below the site. Since the site, located only 6.1 m (20 ft) below the nearest high point on a ridge (relative to the local topography), is well above the beginning of the 500-year flood plain, and is considered a dry site, the probable maximum flood from regional flooding is considered highly unlikely, without further evaluation. 1 1

The recommended standard for determining the probably maximum flood , ANS 2.8, Determining Design Basis Flooding at Power Reactor Sites, has been withdrawn.

3-36

NWMl-2013-021 , Rev . 3 Chapter 3.0 - Design of Structures, Systems and Components Per NUREG- 1520, Section 3.2.3.4(1)(c), and ASCE 7, Chapter 5, flood loads will be based on the water level of the 100-year flood (one percent probability of exceedance per year). The facility has been determined to be above both the 100-year and the 500-year flood plain. Chapter 2, Section 2.4.3, provides additional detail for flood protection measures .

Postulated flooding from component failures in the building compartments will be prevented from adversely affecting plant safety or posing any hazard to the public. Exterior or access openings and penetrations into the RPF will be above the maximum postulated flooding level. Therefore, flood loads are considered highly unlikely and are not considered design loads.

3.3.1.1.2 Flooding from Inadvertent Discharge of Fire Protection System Water Design of fire suppression systems using water (e.g., automatic sprinkJers, hose stations) includes elements such as the grading and channeling of floors, raising of equipment mounts above floors ,

shelving and floor drains, and other passive means. These features will ensure sufficient capacity for gravity-driven collection and drainage of the maximum water discharge rate and duration to avoid localized flooding and resulting water damage to equipment within the area. In addition, particularly sensitive systems and components, whether electrical, optical, mechanical and/or chemical , are typi cally protected within enclosures designed for the anticipated adverse environmental conditions resulting from these types of water discharges. If critical for safety, these water-sensitive systems and components will be installed within the appropriate severe environment-rated enclosures in accordance with the relevant industry standard(s) (e.g., National Electrical Manufacturers Association [NEMA] enclosure standards).

Selection of specific fire suppression systems for fac ility locations will be gui ded by recommendations in relevant industry standards (e.g., NFPA 801 , Standard for Fire Protection for Facilities Handling Radioactive Materials) and will depend on the level of fire hazards at those locations, as determined from the final facility and process systems designs. These final detailed designs will include any facility design elements and sensitive equipment protection measures deemed necessary for addressing the maximum inadvertent rate and duration of water di scharges from the fire protection systems. The final comprehensive facility design, along with commitments to design codes, standards, and other referenced documents (including any exceptions or exemptions to the identified requirements), will be identified and provided as part of the Operating License Application.

3.3.1.2 Flood Protection from External Sources Safety-related components located below-grade will be protected using the hardened protection approach.

The safety-related systems and components wi ll be protected from external water damage by being enclosed in a reinforced concrete safety-related structure. The RPF will have the fo llowing characteristics:

  • Exterior safety-related walls below-grade will be 0.61 m (2-ft) thick minimum Water stops will be provided in all construction joints below-grade
  • Waterproof coating will be applied to external surfaces below-grade and as required above-grade
  • Roofs will be designed to prevent pooling of large amounts of water in accordance with Regulatory Guide 1.102, Flood Protection for Nuclear Power Plants Waterproofing of foundations and walls of safety-related structures below-grade will be accomplished primarily by the use of water stops at expansion and construction joints. In addition to water stops, waterproofing of the RPF will be provided to protect the external surfaces from exposure to water. The level above the RPF first level where waterproofing is to be used will be determined in the Operating Li cense Application.

3-37

NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components The flood protection measures that are described above will also guard against flooding from the rupture of the on-site fire protection water storage tank (if future design development determines that a fire protection storage tank is necessary). Any flash flooding that may result from tank rupture will drain away from the RPF and thereby cause no damage to facility equipment.

3.3.l.3 Compartment Flooding from Fire Protection Discharge The total discharge from the failure of fire protection piping consists of the combined volume from any sprinkler and hose systems. The sprinkler system, if used, is capable of delivering a water density of 20 gallons per minute (gal/min) (76 liters per minute [L/min]) over a 139 m2 (1 ,500 ft2) design area; therefore, the sprinkler system is calculated to have a flow rate of 1, 136 L/min (300 gal/min). The hose stream will be a manually operated fire hose capable of delivering up to 946 L/min (250 gal/min). In accordance with NFPA 801 , Section 5.10, the credible volume of discharge is sized for the suppression system operating for a duration of 30 min. The design of water-sensitive, safety-related equipment will ensure that potential flooding from sprinkler discharge will not adversely affect the safety features . For example, equipment may be raised from the floor sufficiently such that the potential flooding due to sprinkler discharge will not impact the criticality analyses.

Outside of the radiologically controlled area (RCA), as defined in Chapter 11.0, "Radiation Protection and Waste Management," there is limited water discharge from fire protection systems. Any water-sensitive, safety-related equipment will be installed above the floor slab at-grade to ensure that the equipment remains above the flooded floor during sprinkler discharge.

3.3.l.4 Compartment Flooding from Postulated Component Failures Piping, vessels, and tanks with flooding potential in the safety-related portions of the RPF will be seismically qualified. Water-sensitive, safety-related equipment will be raised above the floor. The depth of water on the floor will be minimized by using available floor space to spread the flood water and limiting the water volumes. Analyses of the worst flooding due to pipe and tank failures and their consequences will be developed in the Operating License Application .

3.3.1.4.1 Potential Failure of Fire Protection Piping The total discharge from the operation of the fire protection system bounds the potential water collection due to the potential failure of the fire protection piping.

3.3.1.5 Permanent Dewatering System There is no permanent dewatering system provided for the flood design.

3.3.1.6 Structural Design for Flooding Since the design PMP elevation is at the finished plant-grade and the probable maximum flood (PMF) elevation is approximately 6.1 m (20 ft) below-grade, there is no dynamic force due to precipitation or flooding. The lateral surcharge pressure on the structures due to the design PMP water level is calculated and does not govern the design of the below-grade walls. The load from buildup of water due to discharge of the fire protection system in the RCA is supported by slabs-on-grade, with the exception of the mezzanine floor. Drainage is provided for the second level in the RCA to ensure that the second level slab is not significantly loaded. The second level slab is designed to a live load of 610 kilograms (kg)/m2 (125 lb/ft 2) ; therefore, the slab is capable of withstanding any temporary water collection that may occur while water is draining from that floor.

3-38

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components 3.4 SEISMIC DAMAGE Seismic analysis criteria used for the RPF will conform to IAEA-TECDOC-134 7, Consideration of External Events in the Design of Nuclear Facilities Other Than Nuclear Power Plants, with Emphasis on Earthquakes. This report provides requirements and guidance for the seismic design of nuclear facilities other than nuclear power plants. NUREG-0800 and other NRC Regulatory Guides provide additional detailed guidance for the seismic analysis and design of the RPF. Additional information is provided in Chapter 2.0, Section 2.5.4, and Chapter 13 .0, Section 13.2.6.5. Updates and development of technical specifications associated with the seismic damage design of the RPF SSCs will be provided in Chapter 14.0 as part of the Operating License Application.

3.4.1 Seismic Input 3.4.1.1 Design Response Spectra Safe-Shutdown Earthquake The NRC has recommended using Regulatory Guide 1.60, Design Response Spectra for Seismic Design of Nuclear Power Plants, for radioisotopes production facilities (e.g., 10 CFR 50). NWMI will use a spectrum anchored to 0.20 g peak ground acceleration for the RPF design basis. Regulatory Guide 1.60 is not indexed to any specific soil type, with its frequency content sufficiently broad to cover all soil types.

Therefore, soil type for the RPF will not be a parameter used to determine the RPF's design response spectra. The composition of soil in which the RPF is embedded will be included in the soil-structure-interaction analysis as part of the building response analysis. This information will be provided in the final safety analysis report (FSAR) as part of Operating License Application.

This peak ground acceleration matches that of the University of Missouri Research Reactor (Adams, 2016) and the Calloway Nuclear Generating Station, which both are within 80.5 km (50 mi) of the RPF, as suggested by the NRC staff during the November 10, 2016 Public Meeting. The analysis procedure develops ground motion acceleration time histories that match or exceed the Regulatory Guide 1.60 spectrum as input to the building finite element model. Structural damping will follow the recommendations of Regulatory Guide 1.61 , Damping Values for Seismic Design of Nuclear Power Plants, which range from about 3 to 7 percent.

Response spectra corresponding to the recommended damping values of Regulatory Guide 1.61 will be used to derive seismic loads. Damping varies depending on the type of SSC. Structural damping will follow Regulatory Guide 1.61 guidance (ranging from about 3 to 7 percent). Plotting response spectra at 5 percent damping for purposes of illustration is a convention within the nuclear industry, but for analysis loads, damping will vary depending on the earthquake level (operating basis earthquake or safe-shutdown earthquake) and the type of SSC.

Soil-Structure Interaction and Dynamic Soil Pressures The structure is supported on a shallow foundation system on stiff competent soils. The Phase 1 Assessment (Terracon, 201 la/b) stated the site is classified as Site Class C. Prescribed in ASCE 7, Table 20.3-1 , the typical shear wave velocities for the soils present at the site are 1,200 to 2,500 ft/sec .

Typical practice is to define competent soil as having a shear wave velocity greater than 1,000 ft/sec . The analysis of the RPF building structure to the safe shutdown earthquake will include the effects of a soil-structure interaction. Dynamic soil pressures were determined using ASCE 4, Seismic Analysis of Safety-Related Nuclear Structures and Commentary, Section 3.5.3.2, and applied to the earth retaining walls in the hot cell area.

3-39

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Operating Basis Earthquake For preliminary design, the operating basis earthquake was selected to be one-third the safe-shutdown earthquake defined previously (based on Regulatory Guide 1.61 ). Since this option was selected, explicit design and analysis of the facility structure for the operating basis earthquake ground-motion is not required.

3.4.1.2 Method of Analysis The effect of loads other than earthquake-induced (seismic) loads is determined by static analysis methods in accordance with ASCE 7 and the fundamental principles of engineering. Seismic analysis of SSCs will be performed by either equivalent-static methods or dynamic analysis methods in accordance with ASCE 4 and ASCE 43, Seismic Design Criteria for Structures, Systems, and Components in Nuclear Facilities. The equivalent-static and dynamic seismic analysis methods are discussed below.

3.4.1.2.1 Equivalent-Static Analysis Equivalent-static seismic analysis of commercial type structure will be performed in accordance with ASCE 7, Section 12.8.

Direction of Seismic Loading Design of IROFS will consider seismic loads in all three directions using a combination of square-root-of-the-sum-of-squared or 100/40/40 methodologies per Regulatory Guide 1.92, Combining Modal Responses and Spatial Components in Seismic Response Analysis. The 100/40/40 methodology will be used in the development of the final RPF design and included as part of the Operating License Application.

3.4.1.2.2 Dynamic and Static Analysis Dynamic analyses are only used for the evaluation of RPF structural components. A static analysis will be completed during final design by using a combination of static load computations to ensure the SSCs remain in place and intact, and a combination of existing shake table test data and existing earthquake experience to ensure that the equipment functions following the earthquake. The analysis of safety-related structures may be either completed by the:

  • Linear-elastic response spectra method performed in accordance with ASCE 4, Section 3.2.3.1, and ASCE 43 , Section 3.2.2
  • Linear-elastic time history method performed in accordance with ASCE 4, Section 3.2.2, and ASCE 43 , Section 3.2.2 Damping - The damping values used for dynamic analysis for the structural system considered will be taken from Regulatory Guide 1.61 . Inelastic energy adsorption factors and damping values used for the analysis of nuclear safety-related structures will be selected from ASCE 43 , Table 5-1.

Modeling - Finite element models will only be used for the RPF building structures. The mesh for plate elements and member nodes will be selected to provide adequate discretization and distribution of the mass. Further, the aspect ratio of plate elements will be limited to no greater than 4: 1 to ensure accurate analysis results.

3-40

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Direction of seismic loading - Three orthogonal directions of seismic loading are used in the RPF design, two horizontal and one vertical. The modal components of the dynamic analysis and the spatial components of response analysis are combined as described below.

  • Modal combinations -The structure of the RPF is designed to be relatively stiff, and components are combined using the complete quadratic combination method.
  • Spatial component combinations - Spatial components are calculated separately and combined using the square-root-sum-of-the-squares method to determine the combined earthquake effect and resulting demands.

3.4.2 Seismic Qualification of Subsystems and Equipment This subsection discusses the methods by which the RPF systems and components are qualified to ensure functional integrity. Based on the characteristics and complexities of the subsystem or equipment, seismic qualification will be done by a combination of static load computations to ensure that the SSCs remain in place and intact, and a combination of existing shake table test data and existing earthquake experience to ensure that the equipment functions fo llowing the earthquake.

3.4.2.1 Qualification by Analysis NWMI will define specific acceptable qualification methods in the procurement packages to demonstrate seismic qualifications. Seismic qualification of IROFS will include three options of: ( 1) calculations and verification that the main structural components of the SSC can withstand the seismic loads derived from the in-structure floor response spectra at the damping value derived from Regulatory Guide 1.61, (2) reference to available shake table testing that demonstrates the seismic capacity of the SSC or of multiple similar items, and (3) demonstration of the seismic capacity through the performance of the type of SSC in actual earthquakes.

3.4.2.1.1 Equivalent Static Analysis The equivalent static analysis of nuclear safety-related subsystems and equipment is performed in accordance ASCE 43, Section 8.2.1.1. The equivalent static analysis of subsystems and equipment that are not relied on for nuclear safety but are designated as a component of a seismic system per IBC 2012, Chapter 17, is performed in accordance with ASCE 7, Chapter 13.

3.4.2.1.2 Static Analysis The static analysis of non-structural, safety-related subsystems and equipment is performed in accordance ASCE 4, Section 3.2.3.1 , and ASCE 43, Section 8.2.1.2. A portion ofthe seismic qualification process will involve simple static analysis of the main structural elements (anchorage and primary framing) of IROFS components, using seismic loads from in-structure response spectra derived from the RPF building structure dynamic response analysis. In-structure response spectra are determined using ASCE 4, Section 3 .4.2, and NRC Regulatory Guide 1.122, Development of Floor Design Response Spectra for Seismic Design of Floor-Supported Equipment or Components. In-structure floor response spectra will be developed through a finite element model of the RPF building using an artificial time history that matches or envelops the Regulatory Guide 1.60 spectrum at a peak ground acceleration= 0.20 g.

3-41

..*.......;.. NWMI

.;...... . NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

' ~ *.* ~ ." NOATKWEST MEDIOO ISOTOPES 3.4.2.2 Qualification by Testing NWMI will define specific acceptable qualification methods in the procurement packages to demonstrate seismic qualifications. Seismic qualification ofIROFS will include three options of: (1) calculations and verification that the main structural components of the SSC can withstand the seismic loads derived from the in-structure floor response spectra at the damping value derived from Regulatory Guide 1.61 ,

(2) reference to available shake table testing that demonstrates the seismic capacity of the SSC or of multiple similar items, and (3) demonstration of the seismic capacity through the performance of the type of SSC in actual earthquakes.

Per NRC Regulatory Guide 1.100, Seismic Qualification of Electrical and Active Mechanical Equipment and Functional Qualification ofActive Mechanical Equipment for Nuclear Power Plants :

  • Active mechanical equipment relied on for or important to nuclear safety will be required to be seismically qualified in accordance with Regulatory Guide 1.100.
  • Active electrical equipment important to or relied on for nuclear safety will be required to be seismically qualified in accordance with IEEE 344, IEEE Standard for Seismic Qualification of Equipment for Nuclear Power Generating Stations.

Subsystems and equipment not relied on for nuclear safety but designated as a component of a seismic system per IBC 2012, Chapter 17, will be required. Existing databases of past shake table tests will be used, such as the Office of Statewide Health Planning and Development database provided by the state of California. These tests have typically been done based on the ICC-ES AC156, "Acceptance Criteria for Seismic Certification by Shake-Table Testing ofNonstructural Components," spectrum.

The capacity of the standard support design for overhead fixtures mounted above RPF IROFS will be checked to ensure that the supports can withstand the seismic loads derived from the floor spectra (e.g.,

remain stable during and after postulated earthquake effects) of the attachment floor slab. This information will be provided in the FSAR as part of the Operating License Application.

The RPF seismic design will also include a check to ensure that pounding or sway impact will not occur between adjacent fixtures (e.g., rattle space). Estimates of the maximum displacement of any fixture can be derived from the appropriate floor response spectrum and an estimate of the fixture's lowest response frequency . This information will be provided as part of the Operating License Application.

3.4.3 Seismic Instrumentation Seismic recording instrumentation wi ll be triaxial digital systems that record accelerations versus time accurately for periods between 0 and 10 sec. Recorders will have rechargeable batteries such that if there is a loss of power, recording will still occur. All instrumentation will be housed in appropriate weather and creature-proofed enclosures. As a minimum, one recorder should be located in the free-field mounted on rock or competent ground generally representative of the site. In addition, at sites classified as Seismic Design Category D, E, or Fin accordance with ASCE 7, Chapter 11 , using Occupancy Category IV, recorders will be located and attached to the foundations and roofs of the RPF and in the control room.

The systems will have the capability to produce motion time histories. Response spectra will be computed separately.

The purpose of the instrumentation is to (1) permit a comparison of measured responses of C-1 structures and selected components with predetermined results of analyses that predict when damage might occur, (2) permit facility operators to understand the possible extent of damage within the facility immediately following an earthquake, and (3) be able to determine when an safe-shutdown earthquake event has occurred that would require the emptying of the tank(s) for inspection as specified in NFPA 59A, Standard for the Production, Storage, and Handling of Liquefied Natural Gas, Section 4.l .3.6(c).

3-42

.;....;. NWMI

...... NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

  • ~ ~~~!*
  • NOftTNWEST MEDtcAl ISOTOP'ES Seismic instrumentation for the RPF site is not an IROFS; it provides no safety function and is therefore not "safety-related." Although the seismic recorders have no safety function, they must be designed to withstand any credible level of shaking to ensure that the ground motion would be recorded in the hi ghly unlikely event of an earthquake. This capability requires verification of adequate capacity from the manufacturer (e.g., prior shake table tests of their product line), provision of adequate anchorage (e.g.,

manufacturer-provided anchor specifications to ensure accurate recordings), and a check for seismic interaction hazards such as water spray or falling fixtures. With these design features , the instrumentation would be treated as if it were safety-related QL-2. Additional information on seismic instruction wi ll be provided as part of the Operating License Application.

3.4.3.1 Location and Description Seismic instrumentation is installed for structural monitoring. The seismic instrumentation consists of solid-state digital, tri -axial strong motion recorders located in the free-field, at the structure base, and at the roofof the RPF.

3.4.3.2 Operability and Characteristics The seismic instrumentation operates during all modes of RPF operations. The maintenance and repair procedures provide for keeping the maximum number of instruments in service during RPF operations.

The instrumentation installation design includes provisions for in-service testing. The instruments selected are capable of in-place functiona l testing and periodic channel checks during normal faci lity operation.

3-43

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures , Systems and Components 3.5 SYSTEMS AND COMPONENTS Certain systems and components of the RPF are considered important to safety because they perform safety functions during normal operations or are required to prevent or mitigate the consequences of abnormal operational transients or accidents. This section summarizes the design basis for design, construction, and operating characteristics of safety-related SSCs of the RPF.

3.5.1 General Design Basis Information 3.5.1.1 Classification of Systems and Components Important to Safety The RPF systems and components will be classified according to their importance to safety, quality levels, and seismic class. The guidance used in developing these classifications during preliminary design with the support ofregulatory guidance reviews, hazards and operability analysis, accident analysis, integrated safety analysis, and national consensus code requirements is presented below.

The RPF systems identified in Table 3-1 and their associated subsystems and components are discussed in the subsections that follow.

3.5.1.2 Classification Definitions The definitions used in the classification of SSCs include the followi ng.

In accordance with I 0 CFR 50.2, "Definitions," design basis refers to information that identifies the specific functions to be performed by an SSC of a facility and the specific values or ranges of values chosen for controlling parameters as reference bounds for design. These values may be:

  • Restraints derived from generally accepted state-of-the-art practices for achieving functional goals
  • Requirements derived from analysis (e.g., calculation, experiments) of the effects of a postulated accident for whi ch a SSC must meet its functional goals These reference bounds are to include the bounding conditions under which SSCs must perform design basis functions and may be derived from normal operation or any accident or events for which SSCs are required to function , including anticipated operational occurrences, design basis accidents, external events, natural phenomena, and other events specifically addressed in the regulations.

Design basis accident is a postulated accident that a nuclear faci lity must be designed and built to withstand, without loss to the SSCs necessary to ensure public health and safety.

Design basis event (DBE) is an event that is a condition of normal operation (including anticipated operational occurrences), a design basis accident, an external event, or natural phenomena for which the facility must be designed so that the safety-related functions are achievable.

Design basis accidents and transients are those DBEs that are accidents and transients and are postulated in the safety analyses. The design basis accidents and transients are used in the design of the facility to establi sh acceptable performance requirements for SSCs.

Single failure is considered a random failure and can include an initiating event (e.g., component failure, natural phenomenon, external man-made hazard) or consequential failures. Mechanical, instrumentation, and electrical systems and components required to perform their intended safety function in the event of a single fai lure are designed to include sufficient redundancy and independence. This type of design verifies that a single failure of any active component does not result in a loss of the capability of the system to perform its safety functions.

3-44

.;*......;..NWMI

.... NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures , Systems and Components

' ~* * ~ NOlmfWESTMEOICAl ISOTOPES Mechanical, instrumentation, and electrical systems and components are designed to ensure that a single failure, in conjunction with an initiating event, does not result in the loss of the RPF's ability to perform its intended safety function . Design techniques such as physical separation, functional diversity, diversity in component design, and principles of operation, will be used to the extent necessary to protect against a single failure .

An initiating event is a single occurrence, including its consequential effects, that places the RPF (or some portion) in an abnormal condition. An initiating event and its resulting consequences are not considered a single failure.

Active components are devices characterized by an expected significant change of state or discernible mechanical motion in response to an imposed demand on the system or operation requirements (e.g., switches, circuit breakers, relays, valves, pressure switches, motors, dampers, pumps, and analog meters). An active component failure is a failure of the component to complete its intended safety function(s) on demand.

Passive components are devices characterized by an expected negligible change of state or negligible mechanical motion in response to an imposed design basis load demand on the system.

Defense-in-depth is an approach to designing and operating nuclear facilities that prevents and mitigates accidents that release radiation or hazardous material through the creation of multiple independent and redundant layers of defense to compensate for potential human and mechanical failures so that no single layer, no matter how robust, is exclusively relied on. Defense-in-depth includes the use of access controls, physical barriers, redundant and diverse key safety functions, and emergency response measures.

The RPF structure and system designs are based on defense-in-depth practices. The RPF design incorporates:

  • Preference for engi neered controls over admini strative controls
  • Independence to avoid common mode failures
  • Other features that enhance safety by reducing challenges to safety-related components and systems Safety-related systems and components identified in this section are described in Chapters 4.0; 5.0, "Coolant Systems;" 6.0; 7.0; 8.0, "Electrical Power Systems;" and 9.0, "Auxiliary Systems," as appropriate.

3.5.1.3 Nuclear Safety Classifications for Structures, Systems, and Components SSCs in the RPF are classified as safety-related and non-safety-related. The safety-related SSCs include IROFS to meet the performance requirement of 10 CFR 70.6 1 and other safety-related SSCs to meet the requirements of 10 CFR 20. The purpose of this section is to classify SSCs according to the safety function being performed.

In addition, design requirements will be placed on SSCs to ensure the proper performance of their safety function, when required.

  • Safety-related is a classification applied to items relied on to remain functional during or following a postulated DBE to ensure the:

Integrity of the faci lity infrastructure Capability to shut down the facility and maintain it in a safe shutdown condition 3-45

    • - NWMI

..**.. NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

! * *~ . NORTHW£ST MEDICAL ISOTOPlS Capability to prevent or mitigate the consequences of postulated accidents identified through accident analyses that could result in potential offsite and worker exposures comparable to the applicable guideline exposures set forth in 10 CFR 70.6l(b), 10 CFR 70.6 l (c), and 10 CFR 70.61 (d)

Operation of the facility without undue risk to the health and safety of workers, the public, and the environment to meet 10 CFR 20 normal release or exposure limits for radiation doses and applicable limits for chemical exposures

  • Safety-related Non-IROFS - SSCs that provide reasonable assurance that the facility can be operated without undue risk to the health and safety of workers, the public, and environment, and includes SSCs to meet 10 CFR 20 normal release or exposure limits.
  • Non-safety-related - SSCs related to the production and delivery of products or services that are not in the above safety classifications 3.5.1.3.1 Quality Group Classifications for Structures, Systems, and Components The assignment of safety-related classification and use of codes and standards conforms to the requirements NWMI's Quality Assurance Program Plan (QAPP) for the development of a Quality Group classification and the use of codes and standards. The classification system provides a recognizable means of identifying the extent to which SSCs are related to safety-related and seismic requirements, including ANS nuclear safety classifications, NRC quality groups, ASME Code Section III classifications, seismic categories, and other applicable industry standards, as shown in Table 3-7.

Quality assurance (QA) requirements are defined in the NWMI QAPP (Chapter 12.0, "Conduct of Operations," Appendix C). The definitions of QA Levels 1, 2, and 3 are provided below.

QA Level 1 will implement the full measure of the QAPP and will be applied to IROFS. IROFS are QA Level 1 items in which failure or malfunction could directly result in a condition that adversely affects workers, the public, and/or environment, as described in 10 CFR 70.61 . The failure of a single QA Level 1 item could result in a high or intermediate consequence. The failure of a QA Level 2 item, in conjunction with the failure of an additional item, could result in a high or intermediate consequence. All building and structural IROFS associated with credible external events are QA Level 1. QA Level 1 items also include those attributes of items that could interact with IROFS due to a seismic event and result in high or intermediate consequences, as described in 10 CFR 70.61. Examples include:

  • Items to prevent nuclear criticality accidents (e.g. , preventive controls and measures to ensure that under normal and credible abnormal conditions, all nuclear processes are subcritical)
  • Items credited to withstand credible design-bases external events (e.g. , seismic, wind)
  • Items to prevent degradation of structural integrity (e.g., failure or malfunction of facility)

QA Level 2 will be applied to non-QA Level 1 safety SSCs. The QA program is important to the acceptability and suitability of the item or service to perform as specified. Acceptance methods shall be specified (including acceptance and other applicable performance criteria), documented, and verified before use of the item or service. Some of the required characteristics may be examined less rigorously than for QA Level 1. Examples of QA Level 2 items include:

  • ii*;~*:* NWM I

...... NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

~ * *! . NOIUHW£ST MlDtcAl ISOTOf'ES

  • Fire protection systems
  • Safeguards and security systems
  • Material control and accountability systems QA Level 3 will include non-safety-related quality activities performed by NWMI that are deemed necessary to ensure the manufacture and delivery of highly reliable products and services to meet or exceed customer expectations and requirements. QA Level 3 items include those items that are not classified as QA Level I or QA Level 2. QA Level 3 items are controlled in accordance with standard commercial practices.

These quality activities are embodied in NWMI's QAPP and will be further specified in the Operating License Application, and when necessary.

3.5.1.3.2 Seismic Classification for Structures, Systems, and Components SSCs identified as IROFS will be designed to satisfy the general seismic criteria to withstand the effects of natural phenomena (e.g., earthquakes, tomados, hurricanes, floods) without loss of capability to perform their safety functions. ASCE 7, Chapter 11 , sets forth the criteria to which the plant design bases demonstrate the capability to function during and after vibratory ground-motion associated with the safe-shutdown earthquake conditions.

The seismic classification methodology used for the RPF complies with the preceding criteria, and with the recommendations stated in Regulatory Guide 1.29, Seismic Design Classification. The methodology classifies SSCs into three categories: seismic Category I (C-1), seismic Category II (C-11), and non-seismic (NS).

Seismic C-1 applies to both functionality and integrity, while C-11 applies only to integrity. SSCs located in the proximity ofIROFS, the failure of which during a safe-shutdown earthquake could result in loss of function of IROFS, are designated as C-11. Specifically:

  • C-1 applies to IROFS. C-1 also applies to those SSCs required to support shutdown of the RPF and maintain the facility in a safe shutdown condition
  • C-11 applies to SSCs designed to prevent collapse under the safe-shutdown earthquake. SSCs are classified as C-11 to preclude structural failure during a safe-shutdown earthquake, or where interaction with C-1 items could degrade the functioning of a safety-related SSC to an unacceptable level or could result in an incapacitating injury to occupants of the main control room.
  • NS SSCs are those that are not classified seismic C-1 or C-11.

3.5.2 Radioisotope Production Facility Systems and components within the RPF are presented in Section 3.5.1. The RPF design basis evaluated the general design criteria from 10 CFR 70.64, "Requirements for New Facilities or New Processes at Existing Facilities." This evaluation is presented in Table 3-22. These general design criteria provide a rational basis from which to initiate design but are not mandatory. There are some cases where conformance to a particular criterion is not directly measurable. For each of the criteria, a specific assessment of the RPF design is made, and a complete list of references is included to identify where detailed design information pertinent to each criterion is treated. The Chapter 13.0 accident sequences for credible events define the DBE. The safety-related parameter limits ensure that the associated design basis is met for the events presented in Chapter 13 .0.

3-47

..*........;.*.NWMI NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

' ~ *.* ~ . NOtmfWUT MEOtCAU$GTOH.S Table 3-22. Design Criteria Requirements (4 pages)

Design criteria and description Application and compliance IO CFR 70.64, "Requirements for New Facilities or New Processes at Existing Facilities""

Quality standards and records

  • SSCs important to safety will be designed, fabricated, erected, tested, operated,
  • Develop and implement design in and maintained to quality standards commensurate with the importance of the accordance with management safety functions to be performed. Where generally recognized codes and measures to ensure that IROFS are standards are used, they will be identified and evaluated to determine their available and reliable to perform their applicability, adequacy, and sufficiency and will be supplemented or modified as function when needed. necessary to ensure a quality product in keeping with the required safety function.
  • Maintain appropriate records of these items by or under the control of the
  • NWMJ' s QAPP will be established and implemented to provide adequate licensee throughout the life of the assurance that SSCs satisfactori ly perfo rm thei r safety fun ctions.

facility.

  • Appropriate records of design, fabrication. erection, and testing of SSCs important to safety will be maintained by or under control of NWMI for the life of RPF.
  • NWMI will use a graduated QAPP that links quality classification and associated documentation to safety classification and to the manufacturing and delivery of highly reliable products and equipment.
  • The NWMI QAPP will provide details of the procedures to be applied, including quality and safety level classifications.

Natural phenomena hazards

  • SSCs important to safety will be designed, fabricated, erected, tested, operated, Provide for adequate protection aga inst and maintained to quality standards commensurate with the importance of the natural phenomena, with consideration safety functions to be perfo rmed. Where generally recognized codes and of the most severe documented standards are used, they will be identified and evaluated to determine their historical events for the site. applicability, adequ acy, and suffi ciency and will be suppl emented or modifi ed as necessary to ensure a quality product in keeping with th e requ ired safety funct ion.
  • The design basis fo r these SSCs will include:

- Appropriate consideration of the most severe natural phenomena that have been historicall y reported fo r the RPF site and surrounding area, including sufficient margin for limited accuracy, quantity, and period of time for which historical data has been accumulated

- Appropriate combinations of natural phenomena effects during normal and accident operating condi tions

- Importance of the safety fun ctions to be performed

  • Specific RPF design criteria and NRC general design criteria are discussed in Secti ons 3.1 and 3.5, respecti vely.

3-48

NWMl-2013-021, Rev . 3 Chapter 3.0 - Design of Structures, Systems and Components Table 3-22. Design Criteria Requirements (4 pages)

Design criteria and description Application and compliance Fire protection

  • SSCs important to safety will be designed and located throughout the RPF to Provide for adequate protection against minimize, consistent with other safety requirements, the probability and effect of fires and explosions fires and explosions.
  • Noncombustible and heat resistant materials will be used wherever practical throughout the RPF, particularly in locations such as confinement and the control room.
  • Fire detection and suppression systems of appropriate capacity and capability will be provided and designed to minimize the adverse effects of fires on SSCs important to safety.
  • Firefighting systems will be designed to ensure that their rupture or inadvertent operation does not significantly impair the safety capability of these SSCs.
  • Where necessary, within zoned areas or where criticality and access are an issue, required systems will be manually initiated by operations after review ofa detection signal.
  • RPF frre protection system will be designed such that a failure of any component will not impair the ability of safety-related SSCs to safely shut down and isolate the RPF or limit the release of radioactivity to provide reasonable assurance that the public will be protected from radiological risks resulting from RPF operations
  • RPF fire protection system will be designed to provide reasonable assurance that the public will be protected from radiological risks resulting from RPF operations (e.g., failure of any component will not impair the ability of safety-related SSCs to safely shutdown and isolate the RPF or limit the release of radioactivity).
  • Chapters 6.0 and 9.0 provide additional information.

E nvironmental and dynamic effects

  • SSCs important to safety are designed to accommodate effects of, and to be Provide fo r adequate protection from compatible with, the environmental conditions associated with normal operation, enviro nmental conditions and dynamic maintenance, testing, and postulated acc idents. Due to low temperature and effects associated with normal pressure RPF processes, dynamic effects due to pipe rupture and di scharging operations, maintenance, testing, and fluid s are not applicable to the RPF.

postulated accidents that could lead to loss of safety functi ons Chemical protection

  • Chemical protection in the RPF will be provided by confinement isolation Provide for adequate protection against systems, liquid retention features, and use of appropriate personal protective chemical risks produced from licensed equipment.

material, facility conditions that affect

  • Chapter 6.0, Section 6.2.1, provides additional information.

the safety of licensed material, and hazardous chemicals produced from licensed material Emergency capability

  • Emergency procedures will be developed and maintained fo r the RPF to control Provide fo r emergency capability to SNM and hazardous chemicals produced from the SNM .

maintain control of:

  • Licensed material and hazardous chemicals produced from licensed materi al
  • Evacuation of on-site personnel
  • On-site emergency faci lities and services that facilitate the use of ava ilable off-site services 3-49
        • NWMI

...*.. NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

~ * *!

  • NOllTKWHT MlOICAL lSOTOPES Table 3-22. Design Criteria Requirements (4 pages)

Design criteria and description Application and compliance Utility services

  • The RPF is designed for passive, safe shutdown and to prevent uncontrolled Provide for continued operation of release of radioactive material if normal electric power is interrupted or lost.

essential utility services

  • A standby diesel generator will be provided for asset protection of selected RPF systems.
  • Uninterruptable power supplies will automatically provide power to systems that support the safety functions protecting workers and the public.
  • A combination ofuninterruptable power supplies and a standby electrical power system will provide emergency electrical power to the RPF. A 1,000 kW (1 ,341 hp) diesel generator will provide facility electric power.
  • Chapter 8.0, Section 8.2 provides additional information.

Inspection, testing, and maintenance

  • The RPF is designed to provide access and contro ls for testing, maintenance, and Provide fo r adequate inspection, testing, inspection of safety-related SSCs, as needed, throughout th e RP F.

and maintenance of IROFS to ensure

  • Chapters 4.0, 6.0, 7.0, and 9.0 provide additional info rmation.

availability and reliabili ty to perform their fun ction when needed Criticality control

  • The RPF design will provide adequate protection against criticality hazards related Provide for criticality control, including to the storage, handling, and processing of SNM, which will be accomplished by:

adherence to the double-contingency - Including equipment, facilities, and procedures to protect worker and public principle health and to minimize danger to life or property

- Ensuring that the design provides for criticality control, including adherence to the double-contingency principle

- Incorporating a criticality monitoring and alarm system into the facility design

  • Compliance with the requirements of criticality control, including adherence to the double-contingency principle, are described in detail in Chapter 6.0, Section 6.3.

Instrumentation and control

  • RPF SNM processes will be enclosed predominately by hot cells and glovebox The design must provide fo r inclusion of designs except for the target fabrication area.

I&C systems to monitor and control the

  • The FPC system will provide monitoring and control of safety-related components behavior of items relied on for safety. and process systems within the RPF.
  • The BMS (a subset of the FPC system) will monitor the RPF ventilation system and mechanical utility systems.
  • ESF systems wi ll operate independently from the FPC system or BMS . Each ESF safety fun ction will use hard-wired analog controls/interlocks to protect workers, the public, and environment. The ESF parameters and alarm fun ctions will be integrated into and monitored by the FPC system or BMS.
  • RPF designs are based on defense-in-depth practices and incorporate a preference fo r engineered controls over administrative controls, independence to avoid common mode fa ilures, and incorporate other features that enhance safety by reducing challenges to safety-related components and systems.
  • The FPC system will provide the capability to monitor and control the behavior of safety-related SSCs. These systems ensure adequate safety of process and utility service operations in connection with their safety function . Controls are provided to maintain these variables and systems within the prescribed operating ranges under all normal conditions.
  • The FPC system is designed to fail to a safe-state or to assume a state demonstrated to be acceptable if conditions such as loss of signal, loss of energy or motive power, or adverse environments are experienced.
  • Chapter 7.0 provides additional I&C system information. Safety-related SSCs are described in Section 3.5 and Chapters 4.0, 5.0, 6.0, 7.0, and 8.0.

3-50

.*.NWMI

' ! ~.* ! . NORTHWEST MEDICAL ISOTOPES NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Table 3-22. Design Criteria Requirements (4 pages)

Design criteria and description Application and compliance Defense-in-depthh

  • Defense-in-depth is a design philosophy that NWMI has applied from the Base facility and system design and beginning of the project and will continue through completion ofa design that is facility layout on defense-in-depth based on providing successive levels of protection such that health and safety are practices. The design must incorporate, not wholly dependent on any single element of the design, construction, to the extent practicable: maintenance, or operation of the RPF.
  • Preference for the selection of
  • NWMI's risk insights obtained through performance of the accident analysis will engineered controls over be used to supplement the final design by focusing attention on the prevention and administrative controls to increase mitigation of the higher risk potential accidents.

overall system reliability

  • Chapter 6.0 and 13.0 provide additional information.
  • Features that enhance safety by reducing challenges to IROFS
  • 10 CFR 70.64, "Requirements for New Facilities or New Processes at Existing Facilities," Code ofFederal Regulations, Office of the Federal Register, as amended.

b As used in 10 CFR 70.64, requirements for new facilities or new processes at existing fac ilities, defense-in-depth practices means a design philosophy, applied from the outset and through completion of the design, that is based on providing successive levels of protection such that health and safety will not be wholly dependent on any single element of the design, construction, maintenance, or operation of the facility. The net effect of incorporating defense-in-depth practices is a conservatively designed facility and system that will exhibit greater tolerance to failures and external challenges.

BMS building management system. NRC U.S. Nuclear Regulatory Commission.

CFR Code of Federal Regulations. NWMI Northwest Medical Isotopes, LLC.

ESF engineered safety feature. QAPP quality assurance program plan.

FPC facility process control. RPF Radioisotope Production Facility.

l&C instrumentation and control. SNM special nuclear material.

IROFS items relied on for safety. SSC structures, systems, and components.

The criteria are generic in nature and subject to a variety of interpretations; however, they also establish a proven basis from which to provide for and assess the safety of the RPF and develop principal design criteria. The general design criteria establish the necessary design, fabrication, construction, testing, and performance requirements for SSCs important to safety (i.e., SSCs that provide reasonable assurance that the facility can be operated without undue risk to the health and safety of workers, the public, and environment).

Safety-related SSCs that are determined to have safety significance for the RPF will be designed, fabricated, erected, and tested as required by the NWMI QAPP, described in Chapter 12.0, Appendix C. In addition, appropriate records of the design, fabrication, erection, procurement, testing, and operations ofSSCs will be maintained throughout the life of the plant.

The RPF design addresses the following:

  • Radiological and chemical protection
  • Natural phenomena hazards
  • Fire protection
  • Environmental and dynamic effects
  • Emergency capability (e.g., licensed material, hazardous chemicals, evacuation of on-site personnel, on-site emergency facilities/off-site emergency facilities)
  • Utility services
  • Inspection, testing, and maintenance
  • Criticality safety 3-51

.....;*.. . NWMI NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

  • ~ *.*! . NORTKWEST MEDtcAL ISOTOPU
  • Instrumentation and controls
  • Defense-in-depth Safety-related systems and components will be qualified using the applicable guidance in the Institute of Electrical and Electronics Engineers (IEEE) Standard IEEE 323, IEEE Standard for Qualifying Class IE Equipment for Nuclear Power Generating Stations. The qualification of each safety-related system or component needs to demonstrate the ability perform the associated safety function :
  • Under environmental and dynamic service conditions in which they are required to function
  • For the length of time the function is required Additionally, non-safety-related components and systems will be qualified to withstand environmental stress caused by environmental and dynamic service conditions under which their failure could prevent satisfactory accomplishment of the safety-related functions .

The RPF instrumentation and control (l&C) system (also known as the facility process control [FPC]

system) will provide monitoring and control of the process systems within the RPF that are significant to safety over anticipated ranges for normal operations and abnormal operations. The FPC system will perform as the overall production process controller. This system will monitor and control the process instrumented functions within the RPF, including monitoring of process fluid transfers and controlled inter-equipment pump transfers of process fluids .

The FPC system will also ensure that process and utility systems operate in accordance with their safety function . Controls will be provided to maintain variables and systems within the prescribed operating ranges under all normal conditions. In addition, the FPC system is designed to fail into a safe state or to assume a state demonstrated to be acceptable if conditions such as loss of signal, loss of energy or motive power, or adverse environments are experienced.

The building management system (BMS) (a subset of the FPC system) will monitor the RPF ventilation system and mechanical utility systems. The BMS primary functions will be to monitor the facility ventilation system and monitor and control (turn on and off) the mechanical utility systems.

ESF systems will operate independently from the FPC system or BMS. Each ESF safety function will use hard-wired analog controls/interlocks to protect workers, the public, and environment. The ESF parameters and alarm functions will be integrated into and monitored by the FPC system or BMS.

The fire protection system will have its own central alarm panel. The fire protection system will report the status of the fire protection equipment to the central alarm station and the RPF control room.

This integrated control system will be isolated from safety-related components consistent with IEEE 279, Criteria for Protection Systems for Nuclear Power Generating Stations. In addition, the RPF is designed to meet IEEE 603, Standard Criteria for Safety Systems for Nuclear Power Generating Stations, for separation and isolation of safety-related systems and components. Chapter 7.0 provides additional details on the integrated control system.

3-52

.......NWMI

- ~**: -

~* *~* NORTHWEST MEOfCAl lSOTOPf.S NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components 3.5.2.1 System Classification Table 3-23. System Classifications The RPF is classified as a non-reactor Classification nuclear production facility per 10 CFR 50. description Classification Source In addition, a portion of the RPF will Hazard category Intermediate hazard NRC fabricate LEU targets, similar to fuel Occupancy type Mixed, A-2, B, F-1 , IBC 2012*

fabrication per 10 CFR 70. Due to the H-3 and H-4 nature of the work performed within facility, a hazardous occupancy applies. Construction type 11-B IBC 2012*

Table 3-23 provides the RPF classification Risk category IV ASCE 7b for hazards occupancy, construction, risk, Seismic design category c ASCE 7b and seismic design categories.

  • !BC 2012, " International Building Code," as amended, International Code Council, Inc., Washington, D.C., February 2012 .

3.5.2.2 Classification of Systems and b ASCE 7, Minimum Design Loads for Buildings and Other Components Important to Structures, American Society of Civil Engineers, Reston, Virginia, 201 3.

Safety NRC = U.S. Nuclear Regulatory Commission.

RPF SSCs, including their foundations and supports, designed to remain functional in the event of a DBE are designated as C-I. SSCs designated IROFS are also classified as C-I. SSCs co-located with C-I systems are reviewed and supported in accordance with II over I criteria. This avoids any unacceptable interactions between SSCs.

C-1 structures should be designed using dynamic analysis procedures, or when justified, equivalent static procedures using both horizontal and vertical input ground motions. For dynamic analyses, either response spectra or time history analyses approaches may be used. Dynamic analysis should be performed in accordance with the procedures of ASCE 4, with the exception of the damping limitations presented in Section 3.4.1.

Table 3-24 lists the RPF SSCs and associated safety and seismic classifications and quality level group for the top-level systems. Subsystems within these systems may be identified with lower safety classifications. For example, the day tanks of the chemical supply system are IROFS, while the rest of the chemical supply system is classified as safety-related or not-safety-related.

Table 3-24. System Safety and Seismic Classification and Associated Quality Level Group (2 pages)

Highest safety Seismic Quality level System name (code) classification* classificationb group Facility structure (RPF) IROFS C-1 QL-1 Target fabrication (TF) IROFS C-1 QL-1 Target receipt and disassembly (TD) IROFS C-1 QL-1 Target dissolution (DS) IROFS C-I QL-1 Mo recovery and purification (MR) IROFS C-1 QL-1 Uranium recovery and recycle (UR) IROFS C-1 QL-1 Waste handling (WH) IROFS C-1 QL-1 Criticality accident alarm (CA) IROFS C-1 QL-1 Radiation monitoring (RM) IROFS C-1 QL-1 Standby electrical power (SEP) IROFS C-I QL-1 Normal electrical power (NEP) SR C-1 QL-1 3-53

..*.........;.*. NWMI

........... . NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

  • ~ ~.~ ~ . NORTHWEST M£01CAL ISOTOnS Table 3-24. System Safety and Seismic Classification and Associated Quality Level Group (2 pages)

Highest safety Seismic Quality level System name (code) classificationa classificationb group Process vessel ventilation (PVV) IROFS C-1 QL-1 Facility ventilation (FV)c IROFS C-1/II QL-1/2 Fire protection (FP) SR C-II QL-2 Plant and instrument air (PA) NSR C-II QL-2 Emergency purge gas (PG) IROFS C-1 QL-1 Gas supply (GS) NSR C-II QL-2 Process chilled water (PCW) IROFS C-1 QL-1 Facility chilled water (FCW) NSR C-II QL-2 Facility heated water (HW) NSR C-II QL-2 Process steam IROFS C-I QL-1 Demineralized water (DW) NSR C-II QL-2 Chemical supply (CS) IROFS C-I QL-1 Biological shield (BS) IROFS C-I QL-1 Facility process control (FPC) SR C-II QL-2

  • Safety classification accounts for highest classification in the system. Systems that are classified as safety-related may include both safety-related and non-safety-related components. Only safety-related components will be used to satisfy the safety functions of the system, whereas non-safety-related components can be used to perform non-safety functions. For example, there are non-safety-related components, such as fans, within the safety-related ventilation systems that perform non-safety-related functions .

b Seismic category may be locally revised to account for II over I design criteria and to eliminate potential system degradation due to seismic interactions.

c Ventilation zone classifications vary - Ventilation Zone I and II are considered safety-related, C-I and QL-1; Ventilation Zone III and IV are considered non-safety-related, C-II and QL-2 .

IROFS = items relied on for safety. RPF = Radioisotope Production Facility.

NSR = non-safety related. SR = safety-related (not IROFS).

SSCs that must maintain structural integrity post-DBE, but are not required to remain functional are C-11.

All other SSCs that have no specific NRC-regulated requirements are designed to local jurisdictional requirements for structural integrity and are C-III. All C-I SSCs are analyzed under the loading conditions of the DBE and consider margins of safety appropriate for that earthquake. The margin of safety provided for safety-class SSCs for the DBE are sufficient to ensure that their design functions are not put at risk. Table 3-25 presents the likelihood index limit guidelines and associated event frequency and risk index limits.

Table 3-25. Likelihood Index Limit Guidelines Likely normal facility process condition D!!.11 4 Event frequency limits Multiple events per year > or= 0 Not unlikely (frequent facility process condition) 3 More than 10-4 per event, per year >-4 <O Unlikely (infrequent facility process condition) 2 Between I 0-4 and 10-5 per event, -4 to 5 per year Highly unlikely (limiting facility process condition) Less than 10-5 per event, per year < -5 3-54

. NWMI NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

. ~* *!

  • NORTifWESlMEDICAl.ISOTOPES 3.5.2.3 Design Basis Functions, Values, and Criteria The design basis for systems and components required for safe operation and shutdown of the RPF are established in three categories, which are described below. The preliminary design basis functions and values for each major system are provided in the following subsections.

Design Basis Functions

  • License conditions, orders, or technical specifications
  • Functions credited in the safety analysis to ensure safe shutdown of the facility is achieved and maintained, prevent potential accidents, or mitigate the potential consequences of accidents that could result in consequences greater than applicable NRC exposure guidelines Design Basis Values
  • Values or ranges of values of controlling parameters established as reference bounds for RPF design to meet design basis function requirements
  • Values may be established by an NRC requirement, derived from or confirmed by the safety analysis, or selected by the designer from an applicable code, standard, or guidance document Design Basis Criteria
  • Code-driven requirements established for the RPF fall into seven categories, including fabrication ,

construction, operations, testing, inspection, performance, and qual ity

  • Codes include national consensus codes, national standards, and national guidance documents
  • Design of safety-related systems (including protection systems) is consistent with IEEE 379, Standard Application of the Single-Failure Criterion to Nuclear Power Generating Station Safety Systems, and Regulatory Guide 1.53 , Application of the Single-Failure Criterion to Nuclear Power Plant Protection Systems
  • Protection system is designed to provide two or three channels for each protective systems and functions and two logic train circuits:

Redundant channels and trains will be electrically isolated and physically separated in areas outside of the RPF control room Redundant design will not prevent protective action at the system level 3.5.2.4 System Functions/Safety Functions The NWMI RPF will provide protection against natural phenomena hazards for the personnel, SNM, and systems within the facility. The facility will also provide protection against operational and accident hazards to personnel and the public. Table 3-2 lists the IROFS defined by the preliminary hazards analysis.

3.5.2.5 Systems and Components 3.5.2.5.1 Mechanical RPF C-1 mechanical equipment and components (identified in Table 3-24) will be qualified for operation under the design basis earthquake (DBEQ) seismic conditions by prototype testing, operating experience, or appropriate analysis. The C-1 mechanical equipment is also designed to withstand loadings due to the DBEQ, vibrational loadings transmitted through piping, and operational vibratory loading, such as floor vibration due to other operating equipment, without loss offunction or fluid boundary. This analysis considers the natural frequency of the operating equipment, the floor response spectra at the equipment location, and loadings transmitted to the equipment and the equipment anchorage.

3-55

............;... NWMI NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

' ! *.~~

  • NORTHW£STMEDICALISOTOPES The qualification documents and all supporting analysis and test reports will be maintained as part of the permanent plant record in accordance with the requirements of the NWMI QAPP.

The safety-related equipment and components within the RPF will be required to function during normal operations and during and following DBEs. This equipment will be capable of functioning in the RPF environmental conditions associated with normal operations and design basis accidents. Certain systems and components used in the ESF systems will be located in a controlled environment. This controlled environment is considered an integral part of the ESF systems.

3.5.2.5.2 Instrumentation and Electrical C-1 instrumentation and electrical equipment (identified in Table 3-24) is designed to resist and withstand the effects of the postulated DBEQ without functional impairment. The equipment will remain operable during and after a DBEQ. The magnitude and frequency of the DBEQ loadings that each component experiences will be determined by its location within the RPF. In-structure response curves at various building elevations will be developed to support design. The equipment (e.g., batteries and instrument racks, control consoles) has test data, operating experience, and/or calculations to substantiate the ability of the components and systems to not suffer loss offunction during or after seismic loadings due to the DBEQ. This information will be completed during final design of the RPF and provided in the Operating License Application.

This certification of compliance with the specified seismic requirements, including compliance with the requirements of IEEE 344, is maintained as part of the permanent plant record in accordance with the NWMIQAPP.

3.5.2.6 Qualification Methods Environmental qualification of safety-related mechanical, instrumentation, and electrical systems and components is demonstrated by tests, analysis, or reliance on operating experience. Qualification method testing will be accomplished either by tests on the particular equipment or by type tests performed on similar equipment under environmental conditions at least as severe as the specified conditions. The equipment will be qualified for normal and accident environments. Qualification data will be maintained as part of the permanent plant record in accordance with the NWMI QAPP.

3.5.2.7 Radioisotope Production Facility Specific System Design Basis Functions and Values The design basis functions and values for each system identified in Table 3-1 are discussed in the following subsections. Additional details for each system described below will be updated during the development of the Operating License Appli cation.

3.5.2.7.1 Target Fabrication System An overview and detailed description of the target fabrication system are provided in Chapter 4.0, Sections 4.1.3 .1 and 4.4, respectively.

Design Basis Functions

  • Store fresh LEU, LEU target material, and new LEU targets
  • Produce LEU target material from fresh and recycled LEU material
  • Assemble, load, and fabricate LEU targets
  • Reduce or eliminate the buildup of static electricity
  • Minimize uranium losses through target fabrication
  • Safety-related functions :

3-56

  • i*:~*:* NWM I

...... NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

~* * ~ ' NOKTifWUT MEDfCAl ISOTOP£S Maintain subcriticality conditions within target fabrication system Prevent flammable gas composition within target fabrication system Limit personnel exposure to hazardous chemicals and offgases Design Basis Values

  • 30-year design life with the exception of common replaceable parts (e.g., pumps)
  • Maintain primary fission product boundary during and after normal operations, shutdown conditions, and DBEs 3.5.2.7.2 Target Receipt and Disassembly System An overview and detailed description of the target receipt and disassembly system are provided in Chapter 4.0, Section 4.1.3.2, and Sections 4.3 .2/4.3.3, respectively.

Design Basis Functions

  • Handle irradiated target shipping cask, including all opening, closing, and lifting operations
  • Retrieve irradiated targets from a shipping cask
  • Disassemble targets and retrieving irradiated target material from targets
  • Reduce or eliminate the buildup of static electricity
  • Safety-related functions:

Provide radiological shielding during receipt and disassembly activities Maintain subcriticality conditions within target receipt and disassembly system Prevent radiological materials from being released during target receipt and disassembly operations to limit the exposure of workers, the public, and environment to radioactive material Maintain positive control of radiological materials (LEU target material and radiological waste)

Protect personnel and equipment from industrial hazards associated with system equipment (e.g., moving parts)

Design Basis Values

  • 30-year design life
  • Maintain primary fission product boundary during and after normal operations, shutdown conditions, and DBEs
  • Crane designed for anticipated load (e.g., hot cell cover block) of approximately 68 metric tons (MT) (75 ton) 3.5.2.7.3 Replace Target Dissolution (DS)

An overview and detailed description of the target dissolution system are provided in Chapter 4.0, Sections 4.1.3.3 and 4.3.4, respectively.

Design Basis Functions

  • Fill the dissolver basket with the LEU target material
  • Dissolve the LEU target material within di ssolver basket
  • Treat the offgas from the target dissolution system
  • Handle and package solid waste created by normal operational activities 3-57

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

  • Safety-related functions:

Provide radiological shielding during target dissolution activities Control and prevent flammable gas from reaching lower flammability limit conditions Maintain subcriticality conditions through inherently safe design of target dissolution equipment Maintain positive control of radiological materials (LEU target material and radiological waste)

Design Basis Values

  • 30-yeardesign life with the exception of common replaceable parts (e.g., pumps)
  • Maintain primary fission product boundary during and after normal operations, shutdown conditions, and DBEs
  • Prevent radiological materials from being released during target dissolution operations to limit the exposure of workers, the public, and environment to radioactive material per 10 CFR 20 3.5.2.7.4 Molybdenum Recovery and Purification (MR)

An overview and detailed description of the Mo recovery and purification system are provided in Chapter 4.0, Sections 4.1.3.4 and 4.3 .5, respectively.

Design Basis Functions

  • Recovery of Mo product from a nitric acid solution created from dissolved irradiated uranium targets
  • Purification of the recovered Mo product to reach specified purity requirements, followed by shipment of the Mo product Safety-related functions:

Maintain subcriticality conditions through inherently safe design of components that could handle high-uranium content fluid Prevent radiological materials from being released by containing fluids in appropriate tubing, valves, and other components Control and prevent flammable gas from reaching lower flammability limit conditions Maintain positive control of radiological materials ( 99 Mo product, intermediate streams, and radiological waste)

Provide appropriate containers and handling systems to protect personnel from industrial hazards such as chemical exposure (e.g., nitric acid, caustic, etc.)

Design Basis Values

  • Maintain primary fission product boundary during and after normal operations, shutdown conditions, and DBEs
  • 30-year design life with the exception of common replaceable parts (e.g., pumps)
  • Replace consumables after each batch 3.5.2.7.5 Uranium Recovery and Recycle (UR)

An overview and detailed description of the uranium recovery and recycle system are provided in Chapter 4.0, Sections 4.1.3.5 and 4.3.6, respectively.

3-58

...-.....;;**.*NWMI NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

~ * *!' . NORTHWEST MEDICAL ISOTOHS Design Basis Functions

  • Receive and decay impure LEU solution
  • Recover and purify impure LEU solution
  • Decay and recycle LEU solution
  • Transfer process waste
  • Safety-related functions:

Provide radiological shielding during uranium recovery and recycle system activities Prevent radiological release during uranium recovery and recycle system activities Maintain subcriticality conditions through inherently safe design of the uranium recovery and recycle equipment Control and preventing flammable gas from reaching lower flammability limit conditions Maintain positive control of radiological materials Protect personnel and equipment from industrial hazards associated with the system equipment, such as moving parts, high temperatures, and electric shock Design Basis Values

  • 30-year design life with the exception of common replaceable parts (e.g., pumps)
  • Maintain primary fission product boundary during and after normal operations, shutdown conditions, and DBEs 3.5.2.7.6 Waste Handling An overview and detailed description of the waste handling system are provided in Chapter 4.0, Section 4.1.3.6 and Chapter 9.0, Section 9.7.2, respectively.

Design Basis Functions

  • Receive liquid waste that is divided into high-dose source terms and low-dose source terms to lag storage
  • Transfer remotely loaded drums with high-activity solid waste via a solid waste drum transit system to a waste encapsulation cell
  • Encapsulate solid waste drums
  • Load drums with solidification agent and low-dose liquid waste
  • Load high-integrity containers with solidification agent and high-dose liquid waste
  • Handle and load a waste shipping cask with radiological waste drums/containers
  • Safety-related functions :

Maintain subcriticality conditions through mass limits Prevent spread of contamination to manned areas of the facility that could result in personnel exposure to radioactive materials or toxic chemicals Provide shielding, distance, or other means to minimize personnel exposure to penetrating radiation Design Basis Values

  • Maintain primary fission product boundary during and after normal operations, shutdown conditions, and DBEs
  • 30-year design life with the exception of common replaceable parts (e.g., pumps) 3-59

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components 3.5.2.7.7 Criticality Accident Alarm System Chapter 6.0, Section 6.3 .3.1, and Chapter 7.0, Section 7.3 .7, provide descriptions of the criticality accident alarm system.

Design Basis Functions

  • Provide analysis for criticality accident alarm system coverage in all areas where SNM is handled, processed, or stored
  • Provide for continuous monitoring, indication, and recording of neutron or gamma radiation levels in areas where personnel may be present and wherever an accidental criticality event could result from operational processes.
  • Provide both local and remote annunciation of a criticality excursion
  • Remain operational during DBEs Design Basis Values
  • 30-year design life
  • Capable of detecting a criticality accident that produces an absorbed dose in soft tissue of 20 absorbed radiation dose (rad) of combined neutron or gamma radiation at an unshielded distance of 2 m from reacting material within one minute 3.5.2.7.8 Continuous Air Monitoring System Chapter 7.0, Section 7.6, and Chapter 11.0, Section 11.1.4, provide detailed descriptions of the RPF continuous air monitoring system.

Design Basis Functions

  • Provide real-time local and remote annunciation of airborne contamination in excess of preset limits
  • Provide real-time local and remote annunciation of radiological dose of excess of preset limits
  • Provide environmental monitoring of nuclear radioactive stack releases
  • Provide the capability to collect continuous samples
  • Remain operational during DBEs Design Basis Values
  • Activate when airborne radioactivity levels exceed predetermined limits
  • Activate when radiological dose levels exceed predetermined limits
  • Adjust volume of air sampled to ensure adequate sensitivity with minimum sampling time 3.5.2.7.9 Standby Electrical Power Chapter 8.0, Section 8.2 provides a detailed description of the RPF standby electrical power (SEP) system.

Design Basis Functions SEP includes two types of components: uninterruptible power supplies (UPS) and a standby diesel generator:

  • UPS - Provides power when normal power supplies are absent
  • Standby diesel generator - Provides power when normal power supplies are absent to allow continued RPF processing 3-60

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Design Basis Values

  • 30-year design life
  • Maintain power availability for a minimum of 120 min post-accident (UPS)
  • Maintain power availability for 12 hr (diesel generator) 3.5.2.7.10 Normal Electrical Power Chapter 8.0, Section 8.1 provides a detailed description of the RPF normal electrical power (NEP) system.

Design Basis Functions

  • Provide facility power during normal operations Design Basis Values
  • 30-year design life 3.5.2.7.11 Process Vessel Ventilation System Chapter 9.0, Section 9.1 provides a detailed description of the process vessel ventilation system.

Design Basis Functions

  • Provide primary system functions to protect on-site and off-site personnel from radiological and other industrial related hazards
  • Collect air in-leakage sweep from each of the numerous vessels and other components in main RPF processes and maintain hydrogen concentration process tanks and piping below lower flammability limit
  • Minimize reliance on administrative or complex active engineering controls to provide a confinement system as simple and fail-safe as reasonably possible Design Basis Values
  • Maintain primary fission product boundary during and after normal operations, shutdown conditions, and DBEs
  • 30-year design life
  • Contain and store noble gases generated in the RPF to meet 10 CFR 20 requirements 3.5.2.7.12 Facility Ventilation System Chapter 9.0, Section 9.1 provides a detailed description of the facility ventilation system.

Design Basis Functions

  • Provide confinement of hazardous chemical fumes and airborne radiological materials and conditioning of RPF environment for facility personnel and equipment
  • Prevent release and dispersal of airborne radioactive materials (e.g., maintain pressure gradients to ensure proper flow of air from least potentially contaminated areas to most potentially contaminated areas) to protect health and minimize danger to life or property
  • Maintain dose uptake through ingestion to levels as low as reasonably achievable (ALARA)
  • Provide makeup air and condition the RPF environment for process and electrical equipment
  • Process exhaust flow from the process vessel ventilation system 3-61

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

  • Provide confinement of airborne radioactive materials by providing for the rapid, automatic closure of isolation dampers within confinement zones for various accident conditions
  • Provide conditioned air to ensure suitable environmental conditions for personnel and equipment inRPF Design Basis Values
  • Maintain primary fission product boundary during and after normal operations, shutdown conditions, and DBEs
  • Provide an integrated leak rate for confinement boundaries that meets the requirements of accident analyses that complies with 10 CFR 10.61
  • 30-year design life
  • Maintain occupied space at 24 degrees Celsius (0 C) (75 degrees Fahrenheit [°F]) (summer) and 22°C (72°F) (winter), with active ventilation to support workers and equipment
  • Maintain air quali ty that complies with 10 CFR 20 dose limits for normal operations and shutdown 3.5.2.7.13 Fire Protection System Chapter 9.0, Section 9.3 provides a detailed description of the RPF fire protection system.

Design Basis Functions

  • Provide detection and suppression of fires
  • Generate alarm signals indicating presence and location of fire
  • Execute commands appropriate for the particular location of the fire (e.g., provide varying levels of notification of a fire event and transmitting notification to RPF central alarm station and RPF control room)
  • Provide fire detection in RPF and initiate fire-rated damper closures
  • Remain functional during DBEs Design Basis Values
  • 30-year design life
  • Provide a constant flow of water to an area experiencing a fire for a minimum of 120 min based on the size of the area per International Fire Code (IFC, 2012)
  • Provide sprinkler systems, when necessary, per National Fire Protection Association (NFPA) 13, Standard for the Installation of Sprinkler Systems 3.5.2.7.14 Plant and Instrument Air System Chapter 9.0, Section 9.7.1 provides a detailed description of the RPF plant and instrument air system.

Design Basis Functions

  • Provide small, advective flows of plant air for several RPF activities (e.g., tool operation, pump power, purge gas in tanks, valve actuation, and bubbler tank level measurement)
  • Provide plant air receiver buffer capacity to make up difference between peak demand and compressor capacity 3-62

NWMl-2013-021 , Rev. 3 Chapter 3.0 - Desig n of Structures , Systems and Components

  • Provide plant air to instrument air subsystem for bubblers and valve actuation
  • Provide instrument air receiver buffer capac ity to make up difference between peak demand and compressor capac ity Design Basis Values
  • 30-yeardesign life with the exception of common replaceable parts (e.g., pumps)
  • Provide instrument air dried in regenerable desiccant beds to a dew point of no greater than -40°C

(-40°F) and filtered to a maximum 40 micron (µ) particle size 3.5.2.7.15 Emergency Purge Gas System Chapter 6.0, Section 6.2.1.7.5 provides a detailed description of the emergency purge gas system.

Design Basis Functions Provide > 12 hr of nitrogen to the emergency purge gas system

  • Emergency purge gas system to provide nitrogen to the required process tanks
  • Remain functional during DBEs Design Basis Values
  • 30-year design li fe with the exception of common replaceable parts Maintain hydrogen gas (H2) concentrations less than 25% of the lower flammability limit 3.5.2.7.16 Gas Supply System Chapter 9.0, Section 9.7. 1 provides a detailed description of the gas suppl y system.

Design Basis Functions Provide helium, hydrogen , and oxygen in standard gas bottles

  • Provide nitrogen from a tube truck to the chemical supp ly room where manifold piping will be used to distribute the gas
  • Provide adequate flow to ensure that the accumul ation of combustible gases is below hazardous concentrations and reduces radiological hazards due to accumulation of gaseous fission products Design Basis Values
  • 30-year design life with the exception of common replaceable parts (e.g., pumps)
  • Provide standard gas bottles, with capacity of approximately 8,495 L (300 cubic feet [ft3])

3.5.2.7.17 Process Chilled Water System Chapter 9.0, Section 9.7. 1 provides a detailed description of the RPF chilled water system.

Design Basis Functions

  • Provide process chilled water loop for three secondary loops heat exchangers One large geometry secondary loop in hot cell One criticality-safe geometry secondary loop in hot cell One criticality-safe geometry secondary loop in target fabrication area

NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

  • Provide cover gas to prevent flammable conditions in secondary loops Design Basis Values
  • 30-yeardesign life with the exception of common replaceable parts (e.g., pumps)
  • Chilled water to various process equipment at no greater than 10°C (50°F) during normal operations
  • Maintain the hydrogen concentration in the coolant system at less than 25 percent of the lower flammability limit of 5 percent H2 3.5.2.7.18 Facility Chilled Water System Chapter 9.0, Section 9.7.1.2 .2 provides a detailed description of the RPF facility chilled water system.

Design Basis Functions Provide cooling media to heating, ventilation, and air conditioning (HV AC) system

  • Supply HV AC system with cooling water that is circulated through the chilled water coils in air-handling units Design Basis Values
  • Provide cooling water at a temperature of 9°C (48°F) to the HV AC air-handling unit cooling coils
  • 30-yeardesign life with the exception of common replaceable parts (e.g., pumps) 3.5.2.7.19 Facility Heated Water System Chapter 9.0, Section 9.7.1.2.2 provides a detailed description ofthe RPF heated water system.

Design Basis Functions

  • Provide heated media to HV AC system
  • Supply the HV AC system with heated water that is circulated through the heated water coils in the air-handling units Design Basis Values
  • Provide heated water at a temperature of 82°C (180°F) to HV AC air-handling unit heating coils and reheat coi l
  • 30-year design life with the exception of common replaceable parts (e.g., pumps) 3.5.2.7.20 Process Steam System - Boiler Chapter 9.0, Section 9.7.1 provides a detailed description of the RPF process steam system for the boiler.

Design Basis Functions

  • Generate low- and medium-pressure steam using a natural gas-fired package boiler Provide a closed loop steam system for the hot cell secondary loops that meets criticality control requirements
  • Limit sludge or dissolved solids content with automatic and makeup water streams in the boiler 3-64
  • i;:~y NWM I

...... NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures , Systems and Components

' ~* *~ NOmfWEST MEDICAL lSOTOH.S Design Basis Values

  • 30-yeardesign life with the exception of common replaceable parts (e.g., pumps)
  • Provide saturated steam at 1.7 kg/square centimeters (cm2) (25 lb/square inch [in .2]) and 4.2 kg/cm 2 (60 lb/in. 2) gauge to various process equipment 3.5.2.7.21 Process Steam System - Hot Cell Secondary Loops Chapter 9.0, Section 9.7.1 provides a detailed description of the RPF process steam system for the hot cell secondary loops.

Design Basis Functions

  • Provide a closed loop steam system for the hot cell secondary loops
  • Generate low-pressure steam using a vertical shell-and-tube heat exchanger
  • 30-yeardesign life with the exception of common replaceable parts (e.g., pumps) 3.5.2.7.22 Demineralized Water System Chapter 9.0, Section 9.7.1 provides a detailed description of the RPF demineralized water system.

Design Basis Functions

  • Provide demineralized water to RPF except for administration and truck bay areas
  • Remove mineral ions from municipal water through an ion exchange (IX) process and accumulate in a storage tank
  • Provide regenerable IX media using a strong acid and a strong base Feed acids and bases from local chemical drums by toe pumps Design Basis Values
  • 30-year design li fe with the exception of common replaceable parts (e.g., pumps)
  • Provide the water at 4.2 kg/cm 2 (60 lb/in. 2) gauge 3.5.2.7.23 Supply Air System Chapter 9.0, Section 9.1.2 provides a detailed description of the supply air system. The design basis functions and values are identified in Section 3.5.2.7.12 .

3.5.2.7.24 Chemical Supply System Chapter 9.0, Section 9.7.4 provides a detailed description of the chemical supply system.

Design Basis Functions

  • Provide storage capability for nitric acid, sodium hydroxide, reductant, and nitrogen oxide absorber solutions, hydrogen peroxide, and fresh uranium IX resin
  • Segregate incompatible chemicals (e.g., acids from bases)
  • Provide transfer capability for chemical solutions mixed to required concentrations and used in target fabrication, target dissolution, Mo recovery and purification, and waste management systems 3-65

NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures , Systems and Components Design Basis Values

  • 30-year design life with the exception of common replaceable parts (e.g., pumps) 3.5.2. 7.25 Biological Shielding System Chapter 4.0, Section 4.2, provides a detailed description of the RPF biological shielding.

Design Basis Functions

  • Provide biological shielding from radiation sources in the hot cells for workers in occupied areas of the RPF
  • Limit physical access to hot cells
  • Remain functional through DBEs without loss of structural integrity Design Basis Values
  • 30-year design life
  • Provide dose rates consistent with ALA.RA goals for normally occupied areas 3.5.2.7.26 Facility Process Control System Chapter 7.0, Section 7.2.3 provides a description of the FPC system.

Design Basis Functions

  • Perform as overall production process controller
  • Monitor and control process instrumented functions within the RPF (e.g., process fluid transfers, controlled inter-equipment pump transfers of process fluids)
  • Provide monitoring of safety-related components while BMS (a subset of the FPC system) monitors ventilation system and mechanical utility systems
  • Ensure ESF systems operate independently from FPC system or BMS
  • Use hard-wired analog controls/interlocks for each ESF safety function to protect workers, public, and environment
  • Integrate into and monitor ESF parameters and alarm functions by FPC system or BMS
  • Initiate actuation of isolation dampers for hot cell area or analytical area on receipt of signals from fire protection system Design Basis Values
  • 30-year design life with the exception of common replaceable parts (e.g., controllers) 3-66
  • i*:h NWMI

' ~* * ~ NOWTHWEST MEDICAL lSOTOP'ES NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

3.6 REFERENCES

10 CFR 20, "Standards for Protection Against Radiation, Code of Federal Regulations, Office of the Federal Register, as amended.

10 CFR 30, "Rules of General Applicability to Domestic Licensing of Byproduct Material, Code of Federal Regulations, Office of the Federal Register, as amended.

10 CFR 50, "Domestic Licensing of Production and Utilization Facilities, Code of Federal Regulations, Office of the Federal Register, as amended.

10 CFR 50.2, "Definitions," Code of Federal Regulations, Office of the Federal Register, as amended.

10 CFR 50.31, "Combining Applications, Code of Federal Regulations, Office of the Federal Register, as amended.

10 CFR 50.32, "Elimination of Repetition, Code of Federal Regulations, Office of the Federal Register, as amended.

10 CFR 70, "Domestic Licensing of Special Nuclear Material, Code of Federal Regulations, Office of the Federal Register, as amended.

10 CFR 70.61, "Performance Requirements, Code of Federal Regulations, Office of the Federal Register, as amended.

10 CFR 70.64, "Requirements for New Facilities or New Processes at Existing Facilities, Code of Federal Regulations, Office of the Federal Register, as amended.

10 CFR 71, "Energy: Packaging and Transportation of Radioactive Material ," Code of Federal Regulations, Office of the Federal Register, as amended.

10 CFR 73, "Physical Protection of Plants and Materials, Code of Federal Regulations, Office of the Federal Regi ster, as amended.

10 CFR 74, "Material Control and Accounting of Special Nuclear Material," Code of Federal Regulations, Office of the Federal Register, as amended.

10 CFR 851, "Worker Safety and Health Program, Code of Federal Regulations, Office of the Federal Register, as amended.

10 CSR 10-6.01, "Ambient Air Quality Standards, Missouri Code of State Regulations, as amended.

20 CSR 2030, "Missouri Board for Architects, Professional Engineers, Professional Land Surveyors, and Landscape Architects," Code of State Regulations, Jefferson City, Missouri, as amended.

21 CFR 210, "Current Good Manufacturing Practice in Manufacturing, Processing, Packaging, or Holding of Drugs," Code of Federal Regulations, Office of the Federal Register, as amended.

21 CFR 211, "Current Good Manufacturing Practice for Finished Pharmaceuticals," Code of Federal Regulations, Office of the Federal Register, as amended.

29 CFR 1910, "Occupational Safety and Health Standards, Code of Federal Regulations, Office of the Federal Regi ster, as amended.

40 CFR 61, "National Emissions Standards for Hazardous Air Pollutants, Code of Federal Regulations, Office of the Federal Regi ster, as amended.

40 CFR 63, "NESHAP for Source Categories, Code of Federal Regulations, Office of the Federal Register, as amended.

3-67

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components 40 CFR 141, "National Primary Drinking Water Regulations," Code of Federal Regulations, Office of the Federal Register, as amended.

ACGIH 2097, Industrial Ventilation: A Manual of Recommended Practice for Design , 28th Edition,

,,- American Conference of Governmental Industrial Hygienists, Cincinnati, Ohio, 2013.

ACI 318, Building Code Requirements for Structural Concrete Commentary, American Concrete Institute, Farmington Hills, Michigan, 2014.

ACI 349, Code Requirements for Nuclear Safety-Related Concrete Structures and Commentary, American Concrete Institute, Farmington Hills, Michigan, 2013.

Adams, A. , 2016, "Re: University of Missouri at Columbia - Staff Assessment of Applicability of Fukushima Lessons Learned to University of Missouri - Columbia Research Reactor, (Letter to R. Butler, University of Missouri Research Reactor, December 8), U.S. Nuclear Regulatory Commission, Washington, D.C., 2016.

AISC 360, Specification for Structural Steel Buildings, American Institute of Steel Construction, Chicago, Illinois, 2010.

AMCA Publication 201, Fans and Systems, Air Movement and Control Association International, Inc.,

Arlington Heights, Illinois, 2002 (R201 l).

AMCA Publication 203 , Field Performance Measurement of Fan Systems, Air Movement and Control Association International, Inc., Arlington Heights, Illinois, 1990 (R2011 ).

AMCA Publication 211 , Certified Ratings Program - Product Rating Manual for Fan Air Performance, Air Movement and Control Association International, Inc., Arlington Heights, Illinois, 2013 .

AMCA Publication 311 , Certified Ratings Program - Product Rating Manual for Fan Sound Performance, Air Movement and Control Association International , Inc., Arlington Heights, Illinois, 2006 (R2010).

ANS 2.8, Determining Design Basis Flooding at Power Reactor Sites, American Nuclear Society, La Grange Park, Illinois, 1992 (W2002).

ANSI C84. l, American National Standard for Electric Power Systems and Equipment - Voltage Ratings (60 Hertz), American National Standards Institute, Inc., Washington, D.C., 2011.

ANSI NI 3.1, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stacks and Ducts of Nuclear Facilities, American Nuclear Society, La Grange Park, Illinois, 2011.

ANSI N42. l 7B, American National Standard Performance Specifications for Health Physics Instrumentation - Occupational Airborne Radioactivity Monitoring Instrumentation , American National Standards Institute, Inc. , Washington, D.C., 1989.

ANSI N42. l 8, Specification and Performance of On-Site Instrumentation for Continuously Monitoring Radioactivity in Effluents, American National Standards Institute, Inc., Washington, D.C., 2004.

ANSI N323D, American National Standard for Installed Radiation Protection Instrumentation, American National Standards Institute, Inc., Washington, D.C., 2002 .

ANSVAHRI Standard 365, Performance Rating of Commercial and Industrial Unitary Air-Conditioning Condensing Units , Air-Conditioning, Heating, and Refrigeration Institute, Arlington, Virginia, 2009.

ANSVAHRI Standard 390, Performance Rating of Single Package Vertical Air-Conditioners and Heat Pumps, Air-Conditioning, Heating, and Refrigeration Institute, Arlington, Virginia, 2003 .

3-68

NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures , Systems and Components ANSI/ AHRI Standard 410, Forced-Circulation Air-Cooling and Air-Heating Coils, Air-Conditioning, Heating, and Refrigeration Institute, Arlington, Virginia, 2001.

ANSl/AHRI Standard 430, Performance Rating of Central Station Air-Handling Units, Air-Conditi oning, Heating, and Refrigeration Institute, Arlington, Virginia, 2009.

ANSl/AHRI Standard 850, Performance Rating of Commercial and Industrial Air Filter Equipment, Air-Conditioning, Heating, and Refrigeration Institute, Arlington, Virginia, 2013.

ANSl/AIHA/ASSE Z9.5, Laboratory Ventilation , American Society of Safety Engineers, Des Plaines, lllinois, 20 12.

ANSl/AISC N690, Specification for Safety-Related Steel Structures for Nuclear Facilities, American Institute of Steel Construction, Chicago, Illinois, January 3 1, 2012.

ANSl/AMCA 204, Balance Quality and Vibration Levels for Fans, Air Movement and Control Association International, Inc., Arlington Heights, Illinois, 2005 (R20 12).

ANSl/AMCA 210, Laboratory Methods for Testing Fans for Ratings, Air Movement and Control Association International, Inc. , and American Society of Heating, Refrigerating and Air Conditioning Engi neers, Inc., Arlington Heights, Illinois, 1999.

ANSI/ ANS-2. 26, Categorization of Nuclear Facility Structures, Systems, and Components for Seismic Design, American Nuclear Society, La Grange Park, Illinois, 2004 (R2010).

ANSl/ANS-2.27, Criteria for Investigations of Nuclear Facility Sites for Seismic Hazard Assessments, American Nuclear Society, La Grange Park, Illinois, 2008 .

ANSl/ANS-2.29, Probabilistic Seismic Hazard Analysis, American Nuclear Society, La Grange Park, Illinois, 2008.

ANSl/ANS-6.4, Nuclear Analysis and Design of Concrete Radiation Shieldingfor Nuclear Power Plants, American Nuclear Society, La Grange Park, Illinois, 2006.

ANSl/ANS-6.4.2, Specification for Radiation Shielding Materials, American Nucl ear Society, La Grange Park, Illinois, 2006.

ANSI/ ANS -8 .1, Nuclear Criticality Safety in Operations with Fissionable Materials Outside Reactors, American Nuclear Society, La Grange Park, Illinois, 1998 (R2007) (W20 14).

ANSl/ANS -8.3 , Critically Accident Alarm System, American Nuclear Society, La Grange Park, Illinois, 1997 (R2003 , R2012).

ANSI/ANS -8. 7, Nuclear Criticality Safety in the Storage of Fissile Materials, American Nuclear Society, La Grange Park, Illinois, 1998 (R2007).

ANSI/ ANS -8.10, Criteria for Nuclear Criticality Control in Operations with Shielding and Confinement, American Nuclear Society, La Grange Park, Illinoi s, 1983 (RI 988, Rl 999, R2005).

ANSI/ ANS -8.19, Administrative Practices for Nuclear Criticality Safety, American National Standards Institute/ American Nuclear Society, La Grange Park, Illinois, 1996 (R2014).

ANSl/ANS-8 .20, Nuclear Criticality Safety Training, American National Standards Institute/American Nuclear Society, La Grange Park, Illinois, 1991 (R2005).

ANSl/ANS -8.21 , Use of Fixed Neutron Absorbers in Nuclear Facilities Outside Reactors, American Nuclear Society, La Grange Park, Illinois, 1995 (R2011 ).

3-69

........;...NWMI

~* *~ . MOUMWUT MEDtCA&. tsOTWH NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components ANSVANS-8.24, Validation of Neutron Transport Methods for Nuclear Criticality Safety Calculations, American National Standards Institute/American Nuclear Society, La Grange Park, Illinois, 2007 (R2012).

ANSVANS-10.4, Verification and Validation of Non-Safety-Related Scientific and Engineering Computer Programs for the Nuclear Industry, American Nuclear Society, La Grange Park, Illinois, 2008.

ANSVANS -10.5, Accommodating User Needs in Computer Program Development, American Nuclear Society, La Grange Park, Illinois, 2006 (R201 1).

ANSVANS- 15 .17, Fire Protection Program Criteria for Research Reactors , American Nuclear Society, La Grange Park, Illinois, 198 1 (R2000) (W2014).

ANSVANS-40.37, Mobile Low-Level Radioactive Waste Processing Systems, American Nuclear Society, La Grange Park, Illinois, 2009.

ANSVANS-55 .1 , Solid Radioactive Waste Processing System for Light Water Cooled Reactor Plants ,

American Nuclear Society, La Grange Park, Illinois, 1992 (R2000, R2009).

ANSVANS -5 5.4, Gaseous Radioactive Waste Processing Systems for Light Water Reactor Plants, American Nuclear Society, La Grange Park, Illinois, 1993 (R l 999, R2007).

ANSVANS-55 .6, Liquid Radioactive Waste Processing System for Light Water Reactor Plants, American Nuclear Society, La Grange Park, Illinois, 1993 (Rl 999, R2007).

ANSVANS-58.3, Physical Protection for Nuclear Safety-Related Systems and Components, American Nuclear Society, La Grange Park, Illinois, 1992 (Rl998, R2008).

ANSVANS-58 .8, Tim e Response Design Criteria for Safety-Related Operator Actions, American Nuclear Society, La Grange Park, Illinois, 1994(R2001 , R2008).

ANSVANS -59.3, Nuclear Safety Criteria for Control Air Systems , American Nuclear Society, La Grange Park, Illinois, 1992 (R2002) (W20 12).

ANSVASHRAE 51-07, Laboratory Methods of Testing Fans for Certified Aerodynamic Performance Rating, American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Atlanta, Georgia, 2007.

ANSVASHRAE 110, Method of Testing Performance of Laboratory Fume Hoods , American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Atlanta, Georgia, 1995.

ANSVASHRAE 111 , Measurement, Testing, Adjusting and Balancing of Building Heating, Ventilation, Air-Conditioning and Refrigeration Systems, American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Atlanta, Georgia, 2008 .

ANSVASHRAE Standard 15, Safety Standard for Refrigeration Systems, American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Atlanta, Georgia, 2013.

ANSVASHRAE Standard 52.2, Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size, American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Atlanta, Georgia, 2007.

ANSVASHRAE Standard 55 , Th ermal Environmental Conditions for Human Occupancy, American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Atlanta, Georgia, 2013 .

ANSVASHRAE Standard 62.1, Ventilation for Acceptable Indoor Air Quality, American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Atlanta, Georgia, 20 l 0.

3-70

....  ;. NWMI NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

~ * * ~

  • HORTM'WHT M£0tCAl tsOTOP'fl ANSVASHRAE/IES 90.1, Energy Standard for Buildings Except Low-Rise Residential Buildings, American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Atlanta, Georgia, 2010.

ANSVHI 3.1-3.5, Rotary Pumps, Hydraulic Institute, Parsippany, New Jersey, 2008.

ANSVIEEE C2, 2012 National Electrical Safety Code (NESC), Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2012.

ANSVIEEE N320, American National Standard Performance Specifications for Reactor Emergency Radiological Monitoring Instrumentation, Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 1979.

ANSVIES RP-1-12, American National Standard Practice for Office Lighting, Illuminating Engineering Society, New York, New York, 2012 .

ANSVISA-5.06.01-2007, Functional Requirements Documentation for Control Software Applications, The International Society of Automation, Research Triangle Park, North Carolina, 2007.

ANSVISA-5.1 -2009, Instrumentation Symbols and Identification, The International Society of Automation, Research Triangle Park, North Carolina, 2009.

ANSVISA-7.0.01-1996, Quality Standard for Instrument Air, The International Society of Automation, Research Triangle Park, North Carolina, 1996.

ANSVISA-12.01 .01 -2013 , Definitions and Information Pertaining to Electrical Equipment in Hazardous (Classified) Locations, The International Society of Automation, Research Triangle Park, North Carolina, 2013.

ANSVISA-67.04.01-2006, Setpoints for Nuclear Safety-Related Instrum entation, The International Society of Automation, Research Triangle Park, North Carolina, 2006 (R2011 ).

ANSVISA-75 .05 .0 1-2000, Control Valve Terminology, The International Society of Automation, Research Triangle Park, North Carolina, 2000 (R2005).

ANSVISA-82.03-1988, Safety Standard for Electrical and Electronic Test, Measuring, Controlling, and Related Equipment, The International Society of Automation, Research Triangle Park, North Carolina, 1988.

ANSVISA-TR99.00.0l-2007, Security Technologies for Industrial Automation and Control Systems, The International Society of Automation, Research Triangle Park, North Carolina, 2007.

ANSl/ITSDF B56. l, Safety Standard for Low Lift and High Lift Trucks , Industrial Truck Standards Development Foundation, Washington, D.C., February 2013.

ANSl/NEMA Z535. l, Safety Colors, American National Standards Institute, Inc., Washington, D.C.,

2006 (R2011 ).

ANSl/NEMA Z535.2, Environmental and Facility Safety Signs, American National Standards Institute, Inc., Washington, D.C., 2011.

ANSl/NEMA Z535 .3, Criteria for Safety Symbols, American National Standards Institute, Inc.,

Washington, D.C., 2011.

ANSl/NEMA Z535.4, Product Safety Signs and Labels, American National Standards Institute, Inc.,

Washington, D.C., 2011.

3-71

..* ***~..* NWMI

-~~**:***

    • *
  • NOllTHWUT MEDtCAL tsOTOPH NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components ANSI/NET A A TS-2013, Standard for Acceptance Testing Specifications for Electrical Power Distribution Equipment and Systems, InterNational Electrical Testing Association, Portage, Michigan, 2013.

ANSI/NETA ETT-2010, Standard for Certification of Electrical Testing Technicians, lnterNational Electrical Testing Association, Portage, Michigan, 2010.

ANSI/NETA MTS-2011 , Maintenance Testing Specifications for Electrical Power Distribution Equipment and Systems, InterNational Electrical Testing Association, Portage, Michigan, 2011.

ANSVSMACNA 001-2008, Seismic Restraint Manual: Guidelines for Mechanical Systems, Sheet Metal and Air Conditioning Contractors' National Association, Chantilly, Virginia, 2008.

ANSVTIA-568-C.1, Commercial Building Telecommunications Cabling Standard, Telecommunications Industry Association, Arlington, Virginia, 2012.

ANSVTIA-568-C.2, Balanced Twisted-Pair Telecommunications Cabling and Components Standards, Telecommunications Industry Association, Arlington, 2014.

ANSVTIA-568-C.3, Optical Fiber Cabling and Components Standard, Telecommunications Industry Association, Arlington, 2011.

ANSVTIA-569, Commercial Building Standard for Telecommunications Pathways and Spaces, Telecommunications Industry Association, Arlington, 2013.

ANSVTIA-606, Administration Standard for Commercial Telecommunications Infrastructure, Telecommunications Industry Association, Arlington, 2012.

ANSVTIA-607, Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications, Telecommunications Industry Association, Arlington, 2013.

ANSVTIA-758-A, Customer- Owned Outside Plant Telecommunications Infrastructure Standard, Telecommunications Industry Association, Arlington, 2004.

ASCE 4, Seismic Analysis of Safety-Related Nuclear Structures and Commentary, American Society of Civil Engineers, Reston, Virginia, 2000.

ASCE 7, Minimum Design Loads for Buildings and Other Structures, American Society of Civil Engineers, Reston, Virginia, 2005 (R2010/2013).

ASCE 43 , Seismic Design Criteria for Structures, Systems, and Components in Nuclear Facilities, American Society of Civil Engineers, Reston, Virginia, 2005.

ASCE Manual of Practice 37, Design and Construction of Sanitary and Storm Sewers, (Out-of-Print),

American Society of Civil Engineers, Reston, Virginia, 1969.

ASHRAE Standard 70, Method of Testing the Performance ofAir Outlets and Air Inlets, American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Atlanta, Georgia, 2011 .

ASME, 2013 , Boiler and Pressure Vessel Code, American Society of Mechanical Engineers, New York, New York, 2010/2013 .

ASME A I 7 .1 , Safety Code for Elevators and Escalators, American Society of Mechanical Engineers, New York, New York, 2007.

ASME AG- I , Code on Nuclear Air and Gas Treatment, American Society of Mechanical Engineers, New York, New York, 2012.

ASME Bl6.5, Pipe Flanges and Flanged Fittings: NPW Yi through 24, American Society of Mechanical Engineers, New York, New York, 2003.

3-72

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures , Systems and Components ASME B20. l, Safety Standard for Conveyors and Related Equipment, American Society of Mechanical Engineers, New York, New York, 2012.

ASME B30.17, Overhead and Gantry Cranes (Top Running Bridge, Single Girder, Underhung Hoist),

American Society of Mechanical Engineers, New York, New York, 2006.

ASME B30.20, Below-the-Hook Lifting Devices, American Society of Mechanical Engineers, New York, New York, 2013.

ASME B31, Standards of Pressure Piping, American Society of Mechanical Engineers, New York, New York, 2014.

ASME B3 l.3, Process Piping, American Society of Mechanical Engineers, New York, New York, 2014.

ASME B3 l.9, Building Services Piping, American Society of Mechanical Engineers, New York, New York, 2014.

ASME B31 .12, Hydrogen Piping and Pipelines, American Society of Mechanical Engineers, New York, New York, 2014.

ASME B40.100, Pressure Gauges and Gauge Attachments, American Society of Mechanical Engineers, New York, New York, 2013 .

ASME B40.200, Thermometers, Direct Reading and Remote Reading, American Society of Mechanical Engineers, New York, New York, 2013 .

ASME HST-I, Performance Standard for Electric Chain Hoists, American Society of Mechanical Engineers, New York, New York, 2012.

ASME N509, Nuclear Power Plant Air-Cleaning Units and Components, American Society of Mechanical Engineers, New York, New York, 2002 (R2008).

ASME N 510, Testing of Nuclear Air-Treatment Systems, American Society of Mechanical Engineers, New York, New York, 2007.

ASME NQA-1 , Quality Assurance Requirements for Nuclear Facility Applications, American Society of Mechanical Engineers, New York, New York, 2012.

ASME QME-1, Qualification of Active Mechanical Equipment Used in Nuclear Facilities, American Society of Mechanical Engineers, New York, New York, 2012.

ASTM Cl055, Standard Guide for Heated System Surface Conditions that Produce Contact Burn Injuries, ASTM International , West Conshohocken, Pennsylvania, 2003 (2014).

ASTM C 1217, Standard Guide for Design of Equipment for Processing Nuclear and Radioactive Materials , ASTM International, West Conshohocken, Pennsylvania, 2000.

ASTM Cl533 , Standard Guide for General Design Considerations for Hot Cell Equipment, ASTM International, West Conshohocken, Pennsylvania, 2008 (R2015).

ASTM Cl554, Standard Guide for Materials Handling Equipment for Hot Cells , ASTM International, West Conshohocken, Pennsylvania, 2011.

ASTM Cl572, Standard Guide for Dry Lead Glass and Oil-Filled Lead Glass Radiation Shielding Window Components for Remotely Operated Facilities, ASTM International, West Conshohocken, Pennsylvania, 2010.

ASTM C1615, Standard Guide for Mechanical Drive Systems for Remote Operation in Hot Cell Facilities, ASTM International , West Conshohocken, Pennsylvania, 2010.

3-73

.::*...*. NWMI

! * *~ NQRTlfW(ST Mf.OK:Al ISOTOPH NWMl-2013-021, Rev . 3 Chapter 3.0 - Design of Structures, Systems and Components ASTM Cl661, Standard Guide for Viewing Systems for Remotely Operated Facilities, ASTM International, West Conshohocken, Pennsylvania, 2013.

ASTM E493, Standard Practice for Leaks Using the Mass Spectrometer Leak Detector in the Inside-Out Testing Mode, ASTM International, West Conshohocken, Pennsylvania, 2011.

ASTM F 1471 , Standard Test Method for Air Cleaning Performance of High-Efficiency Particulate Air-Filter System, ASTM International, West Conshohocken, Pennsyl vania, 2009.

A WS B2.1 /B2.1 M, Specification for Welding Procedure and Performance Qualification , American Welding Society, Miami, Florida, 2009.

AWS Dl.l / Dl.lM, Structural Welding Code - Steel, American Welding Society, Miami , Florida, 2010.

AWS Dl.3/Dl.3M, Structural Welding Code - Sheet Steel, American Welding Society, Miami, Florida, 2008.

AWS Dl .6/DI .6M, Structural Welding Code - Stainless Steel, American Welding Society, Miami, Florida, 2007.

AWS D9.1/ D9.1M, Sheet Metal Welding Code, American Welding Society, Miami , Florida, 2006.

AWS QCl, Standard for AWS Certification of Welding Inspectors, American Welding Society, Miami ,

Florida, 2007.

City of Columbia, "City of Columbia Code of Ordinances," https: //www.gocolumbiamo.com/Council/

Code_of_Ordinances_PDF/, accessed September 8, 2014.

CPDG Division 22, "Plumbing," Consultant Procedures and Design Guidelines, University of Missouri, Management Services, Facilities Planning and Development, Columbia, Missouri, 2009.

CPDG Division 23, "Heating, Ventilating, and Air-Conditioning (HV AC)," Consultant Procedures and Design Guidelines, University of Missouri , Management Services, Facilities Planning and Development, Columbia, Missouri, 2014.

CPDG Section 2.4, "Planning, Design and Contract Document Development Guidelines for Master Construction Delivery Method," Consultant Procedures and Design Guidelines, University of Missouri, Management Services, Facilities Planning and Development, Columbia, Missouri, as amended.

CRR 70.060, "Consulting, Design, and Construction," Collected Rules and Regulations, University of Missouri , Columbia, Missouri, as amended.

DC/COL-ISG-007, Interim Staff Guidance on Assessment of Norma l and Extreme Winter Precipitation Loads on the Roofs of Seismic Category I Structures, Federal Register Volume 74, Issue 125, Nuclear Regulatory Commission, Office of New Reactors, Washington, D.C., July 1, 2009.

DHHS (NIOSH) 2003-136, Guidance for Filtration and Air-Cleaning Systems to Protect Building Environments from Airborne Chemical, Biological, and Radiological Attacks, Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, Cincinnati, Ohio, 2003.

DOE-STD-1020-2002, Natural Phenomena Hazards Design and Evaluation Criteria for Department of Energy Facilities, U.S. Department of Energy, Washington, D.C., 2002 (R2012).

FEMA, 2011, "National Flood Insurance Program, Flood Insurance Rate Map, Boone County, Missouri and Incorporated Areas," Federal Emergency Management Agency, Washington, D.C., 2011.

3-74

..; NWMI

...... NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

' ~ * *! NORTNWUT MEDICAL ISOTOrEJ Hydrometeorological Report No. 51, Probable Maximum Precipitation Estimates, United States East of the I 05th Meridian, U.S. Department of Commerce, National Oceanic and Atmospheric Administration, Washington, D.C., 1978.

Hydrometeorological Report No. 52, Application of Probable Maximum Precipitation Estimates, United States East of the 1051h Meridian, U.S. Department of Commerce, National Oceanic and Atmospheric Administration, Washington, D.C., I 982.

Hydrometeorological Report No. 53 , Seasonal Variation of JO-Square-Mile Probable Maximum Precipitation Estimates, United States East of the 1051h Meridian , U.S. Department of Commerce, National Oceanic and Atmospheric Administration, Washington, D.C., 1980.

IAEA-TECDOC-1250, Seismic Design Considerations of Nuclear Fuel Cycle Facilities, International Atomic Energy Agency, Vienna, Austria, 2001.

IAEA-TECDOC-134 7, Consideration of External Events in the Design of Nuclear Facilities Other Than Nuclear Power Plants, With Emphasis on Earthquakes, International Atornjc Energy Agency, Vienna, 2003.

IAEA-TECDOC-1430, Radioisotope Handling Facilities and Automation of Radioisotope Production ,

International Atomic Energy Agency, Vienna, 2004.

IBC, 2012, "International Building Code," International Code Council, Inc., Washington, D.C., 2012.

ICC A 1 I 7 .1, Accessible and Usab le Buildings and Facilities Standard, International Code Council, Inc.,

Washington, D.C., 2009.

ICC-ES AC156, "Acceptance Criteria for Seismic Certification by Shake-Table Testing of Nonstructural Components, International Code Council Evaluation Service, October 2010.

IECC, 2012, 2012 International Energy Conservation Code, International Code Council , Inc.,

Washington, D.C., May 2011.

IEEE 7-4.3.2, Standard Criteria for Digital Computers in Safety Systems ofNuclear Power Generating Stations , Institute of Electrical and Electronics Engineers, Pi scataway, New Jersey, 2003.

IEEE 141 , Recommended Practice for Electric Power Distribution for Industrial Plants (Red Book),

Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 1993 (R1999).

IEEE 142, Recommended Practice for Grounding of Industrial and Commercial Power Systems (Green Book) , Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2007.

IEEE 241 , Recommended Practice fo r Electric Power Systems in Commercial Buildings (Gray Book),

Institute of Electrical and Electronjcs Engineers, Piscataway, New Jersey, 1990 (Rl 997).

IEEE 242, Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems (Buff Book), Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2001.

IEEE 279, Criteria for Protection Systems for Nuclear Power Generating Stations, Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 1971.

IEEE 308, Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations ,

Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2012 .

IEEE 315 , Graphic Symbols for Electrical and Electronics Diagrams, Insti tute of Electrical and Electronics Engineers, Piscataway, New Jersey, 1975 (Rl 993).

3-75

..... NWMI

        • NWMl-201 3-021 , Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

~* * ~

  • NOWTHWEn MEDICAL ISOTOPES IEEE 323, Standard for Qualifying Class JE Equipment for Nuclear Power Generating Stations, Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2003.

IEEE 336, Recommended Practice for Installation, Inspection, and Testing/or Class IE Power, Instrumentation, and Control Equipment at Nuclear Facilities, Institute of Electrical and Electronics Engi neers, Piscataway, New Jersey, 2010.

IEEE 338, Standard for Criteria for the Periodic Surveillance Testing of Nuclear Power Generating Station Safety Systems, Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2012.

IEEE 344, IEEE Standard for Seismic Qualification of Equipment for Nuclear Power Generating Stations, Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 20 13.

IEEE 379, Standard Application of the Single-Failure Criterion to Nuclear Power Generating Station Safety Systems, Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2014.

IEEE 384, Standard Criteria for Independence of Class JE Equipment and Circuits, Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2008.

IEEE 399, Recommended Practice for Power Systems Analysis (Brown Book), Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 1997.

IEEE 446, Recommended Practice for Emergency and Standby Power Systems for Industrial and Commercial Applications (Orange Book), Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 1995 (R2000).

IEEE 493, Recommended Practice for the Design of Reliable Industrial and Commercial Power Systems (Gold Book) , Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2007.

IEEE 497, Standard Criteria for Accident Monitoring Instrumentation for Nuclear Power Generating Stations, Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 20 10.

IEEE 519, Recommended Practice and Requirements for Harmonic Control in Electrical Power Systems ,

Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2014.

IEEE 535 , Standard for Qualification of Class JE Lead Storage Batteries for Nuclear Power Generating Stations, Insti tute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2013.

IEEE 577, Standard Requirements for Reliability Analysis in the Design and Operation ofSafety Systems for Nuclear Facilities, Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2012.

IEEE 603 , Standard Criteria for Safety Systems for Nuclear Power Generating Stations, Institute of Electrical and Electronics Engi neers, Piscataway, New Jersey, 2009.

IEEE 650, Standard for Qualification of Class 1E Static Battery Chargers and Inverters for Nuclear Power Generating Stations, institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2006.

IEEE 739, Recommended Practice for Energy Management in Industrial and Commercial Facilities (Bronze Book), Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 1995 (R2000).

IEEE 828, Standard for Configuration Management in Systems and Software Engineering, Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2012.

IEEE 829, Standard fo r Software and System Test Documentation , Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2008.

3-76

..... ......;.*. NWMI

.... NWMl-2013-021 , Rev . 3 Chapter 3.0 - Design of Structures, Systems and Components

. ~* *~ NOmfWEST llEDtCAl lSOTDPU IEEE 902, Guide for Maintenance, Operation, and Safety of Industrial and Commercial Power Systems (Yellow Book), Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 1998.

IEEE 946, Generating Stations, Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2004.

IEEE 1012, Standard Criteria for Software Verification and Validation, Institute of Electrical and Electronics Engi neers, Piscataway, New Jersey, 2012 .

IEEE 1015, Recommended Practice Applying Low-Voltage Circuit Breakers Used in Industrial and Commercial Power Systems (Blue Book), Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2006 (C2007).

IEEE 1023, Guide for the Application of Human Factors Engineering to Systems, Equipment, and Facilities of Nuclear Power Generating Stations, Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2004 (R20 10).

IEEE 1028, Standard for Software Reviews and Audits, Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2008 .

IEEE 1046, Application Guide for Distributed Digital Control and Monitoring/or Power Plants, Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 1991 (Rl 996).

IEEE 1050, Guide for Instrumentation and Control Equipment Grounding in Generating Stations, Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2004.

IEEE 1100, Recommended Practice for Powering and Grounding Electronic Equipment (Emerald Book),

Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2005 .

IEEE 1289, Guide for the Application of Human Factors Engineering in the Design of Computer-Based Monitoring and Control Displays for Nuclear Power Generating Stations, Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 1998 (R2004).

IEEE 1584, IEEE Guide for Performing Arc-Flash Hazard Calculations, Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 2002.

IES RP-7, American National Standard Practice for Lighting Industrial Facilities, Illuminating Engineering Society, New York, New York, 1991 (W2001).

IES-2011, The Lighting Handbook, J0 1h Edition, Illuminating Engineeri ng Society, New York, New York, 2011 .

IFC, 2012, International Fire Code, International Code Council, Inc. , Washington, D.C., 2012.

IMC, 2012, International Mechanical Code, International Code Council, Inc. , Washington, D.C., 2012.

IPC, 2012, 2012 lnternational Plumbing Code, International Code Council , Inc., Washington, D.C.,

April 2011.

ISA-5.3-1983, Graphic Symbols for Distributed Control/Shared Display Instrumentation, Logic, and Computer Systems, The International Society of Automation, Research Triangle Park, North Carolina, 1983 .

ISA-5 .4-199 I, Instrument Loop Diagrams, The International Society of Automation, Research Triangle Park, North Carolina, 1991 .

ISA-5 .5-1985 , Graphic Symbols for Process Displays , The International Society of Automation, Research Triangle Park, North Carolina, I 985.

3-77

NWMl-201 3-021, Rev . 3 Chapter 3.0 - Design of Structures, Systems and Components ISA-18 .1-1979, Annunciator Sequences and Specifications, The International Society of Automation, Research Triangle Park, North Carolina, 1979 (R2004).

ISA-67.01.01-2002, Transducer and Transmitter Installation for Nuclear Safety Applications, The International Society of Automation, Research Triangle Park, North Carolina, 2002 (R2007).

ISA-RP60.1-l 990, Control Center Facilities, The International Society of Automation, Research Triangle Park, North Carolina, 1990.

ISA-RP67.04.02-20 I 0, Methodologies for the Determination of Setpoints for Nuclear Safety-Related Instrum entation, The International Society of Automation, Research Triangle Park, North Carolina, 20 10.

ISA-TR20.00.01-2007, Specification Forms for Process Measurement and Control Instruments Part 1:

General Considerations Updated with 27 new specification forms in 2004-2006 and updated with 11 new specification forms in 200 7, The International Society of Automation, Research Triangle Park, North Carolina, 2007.

ISA-TR84.00.04-20 1 l , Part 1 Guideline for the Implementation of ANSI/lSA-84.00.01 -2004 (!EC 61511) ,

The International Society of Automation, Research Triangle Park, North Carolina, 20 11 .

ISA-TR84.00.09-2013 , Security Countermeasures Related to Safety Instrumented Systems (SIS) , The International Society of Automation, Research Triangle Park, North Carolina, 2013 .

ISA-TR91.00.02-2003, Criticality Classification Guideline for Instrumentation, The International Society of Automation, Research Triangle Park, North Carolina, 2003.

MU, Facilities Management Policy and Procedures Manual, http://www.umsystem.edu/ums/rules/fPm/,

University of Missouri , Columbia, Missouri , as amended.

NECA 1, Standard Practice of Good Workmanship in Electrical Construction, National Electrical Contractors Association, Bethesda, Maryland, 2010.

NECA 90, Recommended Practice for Commissioning Building Electrical Systems (ANSI), National Electrical Contractors Association, Bethesda, Maryland, 2009.

NECA 100, Symbols for Electrical Construction Drawings (ANS!) , National Electrical Contractors Association, Bethesda, Maryland, 2013 .

NECA 101 , Standard for Installing Steel Conduits (Rigid, !MC, EMT) (ANSI), National Electrical Contractors Association, Bethesda, Maryland, 2013.

NECA 111, Standard for Installing Nonmetallic Raceways (RNC, ENT, LFNC) (ANSI), National Electrical Contractors Association, Bethesda, Maryland, 2003 .

NECA 120, Standard for Installing Armored Cable (Type AC) and Metal-Clad Cable (Type MC) (ANSI),

National Electrical Contractors Association, Bethesda, Maryland, 2013.

NECA 202, Standard for Installing and Maintaining Industrial Heat Tracing Systems (ANSI) , National Electrical Contractors Association, Bethesda, Maryland, 2013 .

NECA 230, Standard for Selecting, Installing, and Maintaining Electric Motors and Motor Controllers (ANSI) , National Electrical Contractors Association, Bethesda, Maryland, 2010.

NECA 331, Standard for Building and Service Entrance Grounding and Bonding, National Electrical Contractors Association, Bethesda, Maryland, 2009.

NECA 400, Standard for Installing and Maintaining Switchboards (ANSI) , National Electrical Contractors Association, Bethesda, Maryland, 2007.

3-78

NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components NECA 402, Standard for Installing and Maintaining Motor Control Centers (ANSI), National Electrical Contractors Association, Bethesda, Maryland, 2007.

NECA 407, Recommended Practice for Installing and Maintaining Pane/boards (ANSI) , National Electrical Contractors Association, Bethesda, Maryland, 2009.

NECA 408, Standard for Installing and Maintaining Busways (ANSI) , National Electrical Contractors Association, Bethesda, Maryland, 2009.

NECA 409, Standard for Installing and Maintaining Dry-Type Transformers (ANSI), National Electrical Contractors Association, Bethesda, Maryland, 2009.

NECA 410, Standard for Installing and Maintaining Liquid-Filled Transformers (ANSI) , National Electrical Contractors Association, Bethesda, Maryland, 2013.

NECA 41 1, Standard for Installing and Maintaining Uninterruptible Power Supplies (UPS) (ANSI),

National Electrical Contractors Association, Bethesda, Maryland, 2006.

NECA 420, Standard for Fuse Applications (ANSI), National Electrical Contractors Association, Bethesda, Maryland, 2014.

NECA 430, Standard for Installing Medium-Voltage Metal-Clad Switchgear (ANSI) , National Electrical Contractors Association, Bethesda, Maryland, 2006.

NECNAA 104, Standard for Installing Aluminum Building Wire and Cable (ANSI) , National Electrical Contractors Association, Bethesda, Maryland, 2012 .

NECN BICSI 568, Standard for Installing Building Telecommunications Cabling (ANSI), National Electrical Contractors Association, Bethesda, Maryland, 2006.

NECNEGSA 404, Standard for Installing Generator Sets (ANSI) , National Electrical Contractors Association, Bethesda, Maryland, 2014.

NECNFOA 301, Standard for Installing and Testing Fiber Optics, National Electrical Contractors Association, Bethesda, Maryland, 2009.

NECNIESNA 500, Recommended Practice for Installing Indoor Lighting Systems (ANSI) , National Electrical Contractors Association, Bethesda, Maryland, 2006.

NECNIESNA 501, Recommended Practice for Installing Exterior Lighting Systems (ANSI), National Electrical Contractors Association, Bethesda, Maryland, 2006.

NECNIESNA 502, Recommended Practice for Installing Industrial Lighting Systems (ANSI) , National Electrical Contractors Association, Bethesda, Maryland, 2006.

NECNNCSCB 600, Recommended Practice for Installing and Maintaining Medium-Voltage Cable (ANSI) , National Electrical Contractors Association, Bethesda, Maryland, 20 14.

NECNNEMA 105, Standard for Insta lling Metal Cable Tray Systems (ANSI), National Electrical Contractors Association, Bethesda, Maryland, 2007.

NECNNEMA 605 , Installing Underground Nonmetallic Utility Duct (ANSI), National Electrical Contractors Association, Bethesda, Maryland, 2005.

NEMA MG-1, Motors and Generators, National Electrical Manufacturers Association, Rosslyn, Virginia, 2009 .

NFPA 1, Fire Code, National Fire Protection Association, Quincy, Massachusetts, 2015.

3-79

      • NWMI

...... NWM l-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components

~ * *! . NOmfWE.ST MEDICAL ISOTOfllS NFPA 2, Hydrogen Technologies Code, National Fire Protection Association, Quincy, Massachusetts, 201 1.

NFPA 4, Standard for Integrated Fire Protection and Life Safety System Testing, National Fire Protection Association, Quincy, Massachusetts, 2015.

NFPA 10, Standard for Portable Fire Extinguishers, National Fire Protection Association, Quincy, Massachusetts, 2013 .

NFPA 13, Standard for the Installation of Sprinkler Systems, National Fire Protection Association, Quincy, Massachusetts, 2013.

NFPA 14, Standard for the Installation of Standpipe and Hose Systems, National Fire Protection Association, Quincy, Massachusetts, 2013.

NFPA 20, Standard for the Installation of Stationary Pumps for Fire Protection , National Fire Protection Association, Quincy, Massachusetts, 20 13.

NFPA 22, Standard for Water Tanks for Private Fire Protection, National Fire Protection Association, Quincy, Massachusetts, 2013.

NFPA 24, Standard for the Installation of Private Fire Service Mains and Their Appurtenances, National Fire Protection Association, Quincy, Massachusetts, 2013 .

NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, National Fire Protection Association, Quincy, Massachusetts, 2014.

NFPA 30, Flammable and Combustible Liquids Code, National Fire Protection Association, Qui ncy, Massachusetts, 2015 .

NFPA 37, Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines ,

National Fire Protection Association, Quincy, Massachusetts, 2015.

NFPA 45, Standard on Fire Protection for Laboratories Using Chemicals, National Fire Protection Association, Quincy, Massachusetts, 2015 .

NFPA 55, Compressed Gases and Cryogenic Fluids Code, National Fire Protection Association, Quincy, Massachusetts, 2013.

NFPA 59A, Standard for the Production, Storage, and Handling of Liquefied Natural Gas, National Fire Protection Association, Quincy, Massachusetts, 2013.

NFPA 68, Standard on Explosion Protection by Dejlagration Venting, National Fire Protection Association, Quincy, Massachusetts, 2013.

NFPA 69, Standard on Explosion Prevention Systems, National Fire Protection Association, Quincy, Massachusetts, 2014.

NFPA 70, National Electrical Code (NEC), National Fire Protection Association, Quincy, Massachusetts, 2014.

NFPA 70B, Recommended Practice for Electrical Equipment Maintenance, National Fire Protection Association, Quincy, Massachusetts, 2013.

NFPA 70E, Standard for Electrical Safety in the Workplace, National Fire Protection Association, Quincy, Massachusetts, 2015.

NFPA 72, National Fire Alarm and Signaling Code, National Fire Protection Association, Quincy, Massachusetts, 2013.

3-80

........;... NWMI

~- * ~

  • NOATKWESTMCrnWISOTOP'lS NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components NFPA 75, Standard for the Fire Protection of Information Technology Equipment, National Fire Protection Association, Quincy, Massachusetts, 2013 .

NFPA 79, Electrical Standard for Industrial Machinery, National Fire Protection Association, Quincy, Massachusetts, 2015 .

NFPA 80, Standard for Fire Doors and Other Opening Protectives, National Fire Protection Association, Quincy, Massachusetts, 2013.

NFPA 80A, Recommended Practice for Protection of Buildings from Exterior Fire Exposures, National Fire Protection Association, Quincy, Massachusetts, 2012.

NFPA 86, Standard for Ovens and Furnaces, National Fire Protection Association, Quincy, Massachusetts, 2015.

NFPA 86C, Standard for Industrial Furnaces Using a Special Processing Atmosphere, National Fire Protection Association, Quincy, Massachusetts, 1999.

NFPA 90A, Standard for the Installation ofAir-Conditioning and Ventilating System, National Fire Protection Association, Quincy, Massachusetts, 2015 .

NFPA 90B, Standard for the Installation of Warm Air Heating and Air-Conditioning Systems , National Fire Protection Association, Quincy, Massachusetts, 2015.

NFPA 91, Standard for Exhaust Systems for Air Conveying of Vapors, Gases, Mists, and Noncombustible Particulate Solids, National Fire Protection Association, Quincy, Massachusetts, 2015.

NFPA 92, Standard for Smoke Control Systems, National Fire Protection Association, Quincy, Massachusetts, 2012.

NFPA 92A, Standard for Smoke-Control Systems Utilizing Barriers and Pressure Differences, National Fire Protection Association, Quincy, Massachusetts, 2009.

NFPA 92B, Standard for Smoke Management Systems in Malls, Atria, and Large Spaces, National Fire Protection Association, Quincy, Massachusetts, 2009.

NFPA 101 , Life Safety Code, National Fire Protection Association, Quincy, Massachusetts, 2015 .

NFPA lOlB, Code for Means of Egress for Buildings and Structures, National Fire Protection Association, Quincy, Massachusetts, 2002 (W-Next Edition).

NFPA 105, Standard for the Installation of Smoke Door Assemblies and Other Opening Protectives ,

National Fire Protection Association, Quincy, Massachusetts, 2013.

NFPA 110, Standard for Emergency and Standby Power Systems, National Fire Protection Association, Quincy, Massachusetts, 20 13 .

NFPA 111 , Standard on Stored Electrical Energy Emergency and Standby Power Systems, National Fire Protection Association, Quincy, Massachusetts, 2013 .

NFPA 170, Standard for Fire Safety and Emergency Symbols, National Fire Protection Association, Quincy, Massachusetts, 20 I 2.

NFPA 204, Standard for Smoke and Heat Venting, National Fire Protection Association, Quincy, Massachusetts, 2012.

NFPA 220, Standard on Types of Building Construction, National Fire Protection Association, Quincy, Massachusetts, 2015 .

3-81

NWMl-2013-021 , Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components NFPA 221, Standard for High Challenge Fire Walls, Fire Walls, and Fire Barrier Walls , National Fire Protection Association, Quincy, Massachusetts, 2015 .

NFPA 262, Standard Method of Test for Flame Travel and Smoke of Wires and Cables for Use in Air-Handling Spaces, National Fire Protection Association, Quincy, Massachusetts, 2015 .

NFPA 297, Guide on Principles and Practices for Communications Systems, National Fire Protection Association, Quincy, Massachusetts, 1995.

NFPA 329, Recommended Practice for Handling Releases of Flammable and Combustible Liquids and Gases, National Fire Protection Association, Quincy, Massachusetts, 20 15 .

NFPA 400, Hazardous Materials Code, National Fire Protection Association, Quincy, Massachusetts, 2013 .

NFPA 496, Standard for Purged and Pressurized Enclosures for Electrical Equipment, National Fire Protection Association, Quincy, Massachusetts, 2013 .

NFPA 497, Recommended Practice for the Classification of Flammable Liquids, Gases, or Vapors and of Hazardous (Classified) Locations for Electrical Installations in Chemical Process Areas, National Fire Protection Association, Quincy, Massachusetts, 2012.

NFPA 704, Standard System for the Identification of the Hazards of Materials for Emergency Response, National Fire Protection Association, Quincy, Massachusetts, 2012.

NFPA 730, Guide for Premises Security, National Fire Protection Association, Quincy, Massachusetts, 20 14.

NFPA 731 , Standard for the Installation of Electronic Premises Security Systems, National Fire Protection Association, Quincy, Massachusetts, 2015.

NFPA 780, Standard for the Installation of Lightning Protection Systems , National Fire Protection Association, Quincy, Massachusetts, 2014.

NFP A 791, Recommended Practice and Procedures for Unlabeled Electrical Equipment Evaluation ,

National Fire Protection Association, Quincy, Massachusetts, 2014.

NFPA 801, Standard for Fire Protection for Facilities Handling Radioactive Materials, National Fire Protection Association, Quincy, Massachusetts, 2014.

NIOSH 2003-136, Guidance for Filtration and Air-Cleaning Systems to Protect Building Environments from Airborne Chemical, Biological, and Radiological Attacks , National Institute for Occupational Safety and Health, Cincinnati, Ohio, 2003 .

NOAA, 20 17, "NOAA Atlas 14 Point Precipitation Frequency Estimates: Mo,"

https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_ cont.html ?bkmrk=mo, National Oceanic and Atmospheric Administration, Silver Spring, Maryland, accessed 2017.

NOAA Atlas 14, Precipitation-Frequency Atlas of the United States , Volume 8, Version 2.0: Midwestern States, National Oceanic and Atmospheric Administration, Silver Spring, Maryland, 2013 .

NRC, 2012, Final Interim Staff Guidance Augmenting NUREG-15 3 7, "Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors," Parts 1 and 2,for Licensing Radioisotope Production Facilities and Aqueous Homogeneous Reactors , Docket Number:

NRC-2011-0135 , U.S. Nuclear Regulatory Commission, Washington, D.C. , October 30, 2012.

NUREG-0700, Human-System Interface Design Review Guidelines, Rev. 2, U.S. Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, Washington, D.C., 2002.

3-82

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants, LWR Edition, U.S. Nuclear Regulatory Commission, Office of Nuclear Material Safety and Safeguards, Washington, D.C. , 1987.

NUREG-1513, Integrated Safety Analysis Guidance Document, U.S. Nuclear Regulatory Commission, Office of Nuclear Material Safety and Safeguards, Washington, D.C., May 2001.

NUREG-1520, Standard Review Plan for the Review of a License Application for a Fuel Cycle Facility, Rev. 1, U.S. Nuclear Regulatory Commission, Office of Nuclear Material Safety and Safeguards, Washington, D.C., May 2010.

NUREG-153 7, Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors - Format and Content, Part 1, U.S . Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, Washington, D.C., February 1996.

NUREG/CR-4604/PNL-5849, Statistical Methods for Nuclear Material Management, Pacific Northwest Laboratory, Richland, Washington, December, 1988.

NUREG/CR-6410, Nuclear Fuel Cycle Facility Accident Analysis Handbook, U.S. Nuclear Regulatory Commission, Washington, D.C., 1998.

NUREG/CR-6463 , Review Guidelines on Software Languages for Use in Nuclear Power Plant Safety Systems - Final Report, U.S. Nuclear Regulatory Commission, Office of Nuclear Regulatory Research , Washington, D.C., 1996.

NUREG/CR-6698, Guide for Validation of Nuclear Criticality Safety Calculational Methodology, U.S. Nuclear Regulatory Commission, Office of Nuclear Material Safety and Safeguards, Washington, D.C., January 2001.

NUREG/CR- 7005, Technica l Basis for Regulatory Guidance on Design-Basis Hurricane Wind Speeds for Nuclear Power Plants, U.S. Nuclear Regulatory Commission, Washington, D.C., 2011.

NWMI-2013-043 , NWMI Radioisotope Production Facility Structural Design Basis, Rev. B, Northwest Medical Isotopes, Corvallis, Oregon, 2015.

NWMI-20 l 5-LIST-003 , NWMJ Radioisotope Production Facility Master Equipment List, Rev. A, Northwest Medical Isotopes, Corvallis, Oregon, 2015 .

NWMI-2015-SAFETY-O 11 , Evaluation of Natural Phenomenon and Man-Made Events on Safety Features and Items Relied on for Safety, Rev. A, Northwest Medical Isotopes, Corvallis, Oregon, 20 15.

NWMI-2015-SDD-001 , RPF Facility SDD, Rev. A, Northwest Medical Isotopes, Corvallis, Oregon, 2015.

NWMI-DRD-2013-030, NWMJ Radioisotope Production Facility Design Requirements Document, Rev. B, Northwest Medical Isotopes, Corvallis, Oregon, 2015 .

Open-File Report 2008-1 128, Documentation for the 2008 Update of the United States National Seismic Hazard Maps, U.S. Geological Survey, Washington, D.C., 2008 .

Regulatory Guide 1.29, Seismic Design Classification, Rev. 3, U.S. Nuclear Regulatory Commission, Washington, D.C., September 1978.

Regulatory Guide 1.53, Application of the Single-Failure Criterion to Safety Systems, Rev. 2, U.S.

Nuclear Regulatory Commission, Washington, D.C., November 2003 (R201 l).

Regul atory Guide 1.60, Design Response Spectra for Seismic Design of Nuclear Power Plants, Rev. 2, U.S. Nuclear Regulatory Commission, Washington, D.C., July 2014.

3-83

....  ;.*.NWMI

~~ *~

  • NORTHWEST MEDICAL ISOTOPES NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Regulatory Guide 1.61, Damping Values for Seismic Design of Nuclear Power Plants, Rev. 1, U.S. Nuclear Regulatory Commission, Washington, D.C., March 2007 (R2015).

Regulatory Guide 1.76, Design-Basis Tornado and Tornado Missiles for Nuclear Power Plants, Rev. 1, U.S. Nuclear Regulatory Commission, Washington, D.C., March 2007.

Regulatory Guide 1.92, Combining Modal Responses and Spatial Components in Seismic Response Analysis, Rev. 2, U.S. Nuclear Regulatory Commission, Washington, D.C., July 2006.

Regulatory Guide 1.97, Criteria for Accident Monitoring Instrumentation for Nuclear Power Plants, Rev. 4, U.S. Nuclear Regulatory Commission, Washington, D.C., June 2006 (R2013).

Regulatory Guide 1. I 00, Seismic Qualification of Electrical and Active Mechanical Equipment and Functional Qualification ofActive Mechanical Equipment for Nuclear Power Plants, Rev. 3, U.S. Nuclear Regulatory Commission, Washington, D.C. , September 2009.

Regulatory Guide 1.102, Flood Protection for Nuclear Power Plants, Rev. 1, U.S. Nuclear Regulatory Commission, Office of Standards Development, Washington, D.C., September 1976.

Regulatory Guide 1.122, Development of Floor Design Response Spectra for Seismic Design of Floor-Supported Equipment or Components , U.S. Nuclear Regulatory Commission, Office of Standards Development, Washington, D.C., February 1978.

Regulatory Guide 1.152, Criteria for Use of Computers in Safety Systems of Nuclear Power Plants ,

Rev. 3, U.S . Nuclear Regulatory Commission, Washington, D.C. , July 2011 .

Regulatory Guide 1.166, Pre-Earthquake Planning and Immediate Nuclear Power Plant Operator Post Earthquake Actions, U.S. Nuclear Regulatory Commission, Washington, D.C. , March 1997.

Regulatory Guide 1. I 67, Restart of a Nuclear Power Plant Shut down by a Seismic Event, U.S. Nuclear Regulatory Commission, Washington, D.C., March 1997.

Regulatory Guide 1.208, Performance Based Approach to Define the Site-Specific Earthquake Ground Motion, U.S. Nuclear Regulatory Commission, Washington, D.C., March 2007.

Regulatory Guide 3.3, Quality Assurance Program Requirements for Fuel Reprocessing Plants and for Plutonium Processing and Fuel Fabrication Plants, Rev. I , U.S. Nuclear Regulatory Commission, Washington, D.C., March 1974 (R2013).

Regulatory Guide 3.6, Content of Technical Specification for Fuel Reprocessing Plants, U.S. Nuclear Regulatory Commission, Washington, D.C., April 1973 (R2013).

Regulatory Guide 3.10, Liquid Waste Treatment System Design Guide for Plutonium Processing and Fuel Fabrication Plants, U.S. Nuclear Regulatory Commission, Washington, D.C., June 1973 (R2013).

Regulatory Guide 3.18, Confinement Barriers and Systems for Fuel Reprocessing Plants, U.S . Nuclear Regulatory Commission, Washington, D.C., February 1974 (R2013).

Regulatory Guide 3.20, Process Offgas Systems for Fuel Reprocessing Plants, U.S. Nuclear Regulatory Commission, Washington, D.C., February 1974 (R2013).

Regulatory Guide 3.71 , Nuclear Criticality Safety Standards for Fuels and Materials Facilities, Rev. 2, U.S. Nuclear Regulatory Commission, Washington, D.C., December 2010.

Regulatory Guide 5.7, Entry/Exit Control for Protected Areas, Vital Areas, and Material Access Areas, Rev. 1, U.S . Nuclear Regulatory Commission, Washington, D.C., May 1980 (R20 10).

3-84

NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components Regulatory Guide 5.12, General Use of Locks in the Protection and Control of Facilities and Special Nuclear Materials, U.S. Nuclear Regulatory Commission, Washington, D.C., November 1973 (R2010).

Regulatory Guide 5.27, Special Nuclear Material Doorway Monitors, U.S. Nuclear Regulatory Commission, Washington, D.C., June 1974.

Regulatory Guide 5.44, Perimeter Intrusion Alarm Systems, Rev. 3, U.S. Nuclear Regulatory Commission, Washington, D.C., October 1997 (R2010).

Regulatory Guide 5.57, Shipping and Receiving Control of Strategic Special Nuclear Material, U.S.

Nuclear Regulatory Commission, Washington, D.C., June 1980.

Regulatory Guide 5.65, Vital Area Access Control, Protection of Physical Security Equipment, and Key and Lock Controls, U.S. Nuclear Regulatory Commission, Washington, D.C., September 1986 (R2010).

Regulatory Guide 5.71, Cyber Security Programs for Nuclear Facilities , U.S. Nuclear Regulatory Commission, Washington, D.C., 2010.

SMACNA 1143, HVAC Air Duct Leakage Test, Sheet Metal and Air Conditioning Contractors' National Association, Chantilly, Virginia, 1985.

SMACNA 1520, Round Industrial Duct Construction Standard, Sheet Metal and Air Conditioning Contractors' National Association, Chantilly, Virginia, 1999.

SMACNA 1922, Rectangular Industrial Duct Construction Standard, Sheet Metal and Air Conditioning Contractors' National Association, Chantilly, Virginia, 2004.

SMACNA 1966, HVAC Duct Construction Standard - Metal and Flexible, Sheet Metal and Air Conditioning Contractors' National Association, Chantilly, Virginia, 2006.

SMACNA-2006, HVAC Systems Duct Design, Sheet Metal and Air Conditioning Contractors' National Association, Chantilly, Virginia, 2006.

SNT-TC-lA, Recommended Practice No. SNT-TC-JA: Personnel Qualification and Certification in Nondestructive Testing, American Society for Nondestructive Testing, Columbus, Ohio, 2011.

Technical Paper No. 40, Rainfall Frequency Atlas of the United States for Durations from 30 Minutes to 24 Hours and Return Periods from 1 to JOO Years, Weather Bureau, U.S. Department of Commerce, Washington, D.C. 1963 .

Terracon, 2011 a, Phase I Environmental Site Assessment Discovery Ridge Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, and 18, Terracon Consultants, Inc., prepared for University of Missouri and Trabue, Hansen & Hinshaw, Inc., Terracon Project No. 09117701 , March 23, 2011 .

Terracon, 2011 b, Preliminary Geotechnical Engineering Report Discovery Ridge- Certified Site Program Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, and 18, Terracon Consultants, Inc., prepared for University of Missouri and Trabue, Hansen & Hinshaw, Inc., Terracon Project No. 09105094.1, February 11 , 2011.

UL 181, Standard for Factory-Made Air Ducts and Connectors, Underwriters Laboratories, Washington, D.C., 2013.

UL 499, Standard for Electric Heating Appliances, Underwriters Laboratories, Washington, D.C., 2014.

UL 555, Standard for Fire Dampers, Underwriters Laboratories, Washington, D.C., 2006.

3-85

.*.......*.NWMI

......  ;~

' ~ * *! .

NORTHWEST MEDfCAl tsOTOPf.S NWMl-2013-021, Rev. 3 Chapter 3.0 - Design of Structures, Systems and Components UL 586, Standard for High Efficiency, Particulate, Air Filter Units, Underwriters Laboratories, Washington, D.C. , 2009.

UL 900, Standard for Air Filter Units, Underwriters Laboratories, Washington, D.C., 2004.

UL 1995, Heating and Cooling Equipment, Underwriters Laboratories, Washington, D.C., 2011.

USGS, "2008 U.S. Geological Survey National Seismic Hazard Maps," U.S. Geological Survey, Rolla, Missouri, 2008.

3-86