Summary of 880106 Meeting W/Util in Bethesda,Md Re Review Schedule & Milestones for Proposed Tech Specs Conversion. Meeting Attendance List Encl
ML17342B148
Person / Time
Site: Turkey Point  
Issue date: 02/08/1988
From: Edison G
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
TAC-63038, TAC-63039, NUDOCS 8802160075
Download: ML17342B148 (5)


Text

February 8

1988 LICENSEE:

FACILITY:

SUBJECT:

REFERENCE:

TAC Numbers 63038 and 63039 Docket Nos.

50-250 DISTRIBUTION and 50-251 NRC 5 Local PDRs PD22 Reading Florida Power and Light Company H. Berkow D. Miller Turkey Point Units 3 and 4

OGC-WF E. Jordan

SUMMARY

OF MEETING HELD WITH FLORIDA POWER AND LIGHT COMPANY (FPSL)

ON JANUARY 6,

1988, REGARDING TECHNICAL SPECIFICATION CONVERSION J.. Parti ow NRC Participants ACRS (10)

Members of the NRC staff met with the licensee's representatives at Bethesda, Maryland, to discuss the review schedule and milestones for the proposed Turkey Point Plant Units 3 and 4 Technical Specifications (TSs).

The licensee is converting the existing custom plant Technical Specifications, which were issued in the early 1970s, to the format and content of the Standard Technical Specifications for Westinghouse Pressurized Mater Reactors (NUREG-0452).

The NRC staff expressed preliminary concerns that certain relaxations proposed by the licensee (among a much larger number of more restrictive TSs) might cause delays in review.

A tentative schedule resulting in TS approval around the end of CY 1988 appeared feasible.

However, the licensee agreed to provide a separate list of all relaxations so the staff could do some preliminary checking on review complexities.

The preliminary schedule appeared to be accep-table to the licensee.

V Follow-up meetings will take place at the site, the Region II office and at Bethesda to assure interaction with all the participants.

Physical systems and "components can be verified during the site meetings.

The licensee identi-fied some sections of the proposed Technical Specifications to be deleted or added which differ from the Standard Technical Specifications due to plant specific design features.

The meeting attendance list is enclosed.

Enclosure:

Meeting Attendees Gordon E. Edison, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects-I/II cc w/enclosure:

See next page L

2 PM:PDII-2 D'

Dt r

GEdi on:bg e

ICow 2

/88 2/

/88

/g/88

'8802ih0075 880208 1

PDR ADOCK 05000250 PDR~

II rt t

S I I

Mr. C. 0.

Woody Florida Power and Light Company Turkey Point Plant CC:

Harold F. Reis, Esquire Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 John T. Butler, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. J.

Odom, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Mr. Sergio Periera County Manager of Metropolitan Dade County Miami, Florida 33130 Resident Inspector LI.S. Nuclear Regulatory Commission Turkey Point Nuclear Generating Station Post Office Box 57-1185

'iami, Florida 33257-1185 Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Intergovernmental Coordination and Review Office of Planning

& Budget Executive Office of the Governor

- The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Joette Lorion 7269 SW, 54 Avenue Miami, Florida 33143 Mr. Chris J. Baker, Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102

ENCLOSURE TURKEY POINT TECHNICAL SPECIFICATION REYISION PROJECT JANUARY 6, 1988 NAME D. McDonald H. Berkow P.

Pace C.

Moon J. Arias, Jr.

B. Burdick M. Huba T. Grozan G. Edison ATTENDFES ORGANIZATION NRC/NRR/DRP NRC/NRR/P DII-2 FPSL/Nuclear Licensing NRR/DOEA/OTSB FPKL/PTN Reg.

5 Compliance Suov.

FPAL/Licensing Supv.

FPAL/Tech. Licensing FPSL/Nuclear Licensing NRC/NRR/PD II-2

0 J

4