Forwards Final Draft of Revised Tech Specs for Review & Certification of Consistency.Requests That Util Verify That Each Spec in Current Tech Spec Accounted for in Tech Spec by Direct Transfer & Substitution of STS
ML17347B022
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/14/1989
From: Edison G
Office of Nuclear Reactor Regulation
To: Conway W
FLORIDA POWER & LIGHT CO.
References
TAC-63038, TAC-63039, TAC-65816, TAC-65817, NUDOCS 8903230109
Download: ML17347B022 (5)


Text

h gg lltgg c,ia c

~4 "o

O I

3 Vl t

0

+~

~O

+>>*++

Docket Nos.

50-250 and 50-251 UNITEDSTATES NUCLEAR REGULATORYCOMMISSION WASHINGTON, D. C. 20556 March 14, 1989 Mr. W. F.

Conway Senior Vice President-Nuclear Nuclear Energy Department Florida Power and Light Company Post Office Box 14000 Juno

Beach, Florida 33408-0420

Dear Mr. Conway:

SUBJECT:

FINAL DRAFT - REVISED TECHNICAL SPECIFICATIONS - TURKEY POINT UNITS 3 AND 4 (TAC NOS. 63038,

63039, 65816 AND 65817)

Enclosed is a copy of the Final Draft of the Revised Technical Specifications (RTS) for Turkey Point Plant Units 3 and 4.

We request that you review and certify that the Final Draft RTS are consistent with the updated FSAR and with the as-built plant.

In addition, we request that you verify that each specification in the current Technical Specifications has been accounted for in the RTS by:

(1) direct transfer, except for editorial and format changes, (2) substitution of an appropriate Standard Technical Specification, or (3) submittal of justification for other changes.

The enclosed Final Draft RTS are in the form of "combined" Technical Specifica-tions to be included as an Appendix A to each license.

Therefore, your certification should include certification of the applicability of one copy for use of the Unit 3 staff and a second copy for use of the Unit 4 staff.

We further request that you provide the certification under oath and affirmation by May 9, 1989 as discussed with D. Chancy of your staff.

Please note that the specifications in Section 3/4.8, Electrical Power Systems, are those proposed in your letter of January 24, 1989 without benefit of staff review.

Review of those specifications against Standard Technical Specifications practice and the ongoing technical review of your proposed license amendment dated November 28, 1986 and revised December 20, 1988 and January 24, 1989 is expected to result in some modifications of that section.

In addition, the PDR 0109 890314 y

8903ge P

DOCg 050 PNu

q'P'

Mr., W. F.

Conway Florida Power and Light Company Turkey Point Plant CC:

Harold F. Reis, Esquire Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Ta1 lahassee, Flori da 32304 John T. Butler, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Flori da 33131-2398 Mr. J.

Odom, Uice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 County Manager of Metropolitan Dade County Miami, Florida 33130 Resident Inspector U.S. Nuclear Regulatory Commission Turkey Point Nuclear Generating Station Post Office Box 57<<1185 Miami, Flor ida 33257-1185 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Minewood Blvd.

Tallahassee, Florida 32399-0700 Intergovernmental Coor dination and Review Office of Planning 5 Budget, Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administraxor Department of Environmental Regulation Power Plant Siting Section State of Flori da 2600 Blair Stone Road Ta 1 1ahassee, F1ori da 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Ta l 1ahas see, Florida 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102

Mr. W. F.

Conway March 14, 1989 reformatted specifications in Section 3/4.9 (P/T Limits) are undergoing an expansion of the "Bases" section and will be sent under separate cover in a few weeks.

Such modifications will be forwarded to you with a request that you update your certification.

We also ask that you pay special attention to your consideration of no significant hazards to assure. that each of the three standards of 10 CFR 50.92 is addressed with an adequate technical basis.

Sincerely,

Enclosure:

As stated Original signed by Gordon E. Edison, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation cc w/enclosure:

See next page

. DISTR I BUTION, NRC 8

LOCAL PDRs PDII-2 Rdg File

GLainas, 14/E/4, w/o enclosure
EAdensam, 14/H/3, w/o enclosure DMiller, w/o enclosure GEdison OGC EJordan MNBB-3302, w/o enclosure GGrimes 9/A/2, w/o enclosure ACRS(10 Cwoon, 11/F23, w/o enclosure
EButcher, 11/F23, w/o enclosure REmch, ll/F/23, si/o enclosure BWilson, RII

[REVISED TS/TURKEY POINT L:

I-2 PM: PD II-:P 2

r GEdi son: jd Be k w

/6'/89 03//y/89 3/ (sj /89

0 4

4 4

4 I

4 I

H I

\\