February 9, 1988 Docket Nos.
50-250 and 50-251 LICENSEE:
FK ILITY:
SUBJECT:
DISTRIBUTION
~
NRC a Local PDRa PD22 Reading Florida Power and Light Company H. Berkow G. Edison Turkey Point Units 3 and 4
OGC-WF E. Jordan
SUMMARY
OF MEETING HELD WITH FLORIDA POWER AND LIGHT COMPANY (FP8lL)
ON JANUARY 28, 1988 REGARDING TECHNICAL SPECIFICATION CONVERSION J, Parti ow NRC Participants ACRS (10)
D. Miller
REFERENCE:
TAC Numbers 63038 and 63039 Members of the NRC staff met with the licensee's representatives at Bethesda, Maryland to discuss the Technical Specifications (TSs) Revision Project for Turkey Point Units 3 and 4.
The purpose of the meeting was for the licensee to explain how they are using the current TSs and procedures in the control
- room, and to address the safety implications of the potential for confusion to operators.
The staff's concern was detailed in a letter dated January 15, 1988 from S.
Varga (NRC) to C.
Woody (Florida Power and Light Company).
The licensee indicated that current proposed TSs and procedures available in the control room are more restrictive than the approved set of TSs.
The pro-posed TSs are based largely on draft standard TSs, which are under development by the NRC staff.
They indicated that any proposed relaxations from the approved TSs have not been included in those TSs and procedures now in use in the control room.
The licensee stated that a learning process, rather than confusion, better characterizes the impact on operators.
The licensee could identify only one isolated instance where a relaxation had inadvertently slipped in to the procedures.
The NRC staff described their own efforts to improve TS requirements and indi-cated an approximate schedule when new TS requirements could be expected.
It was suggested that the licensee might want to temporarily halt their efforts towards TS improvement until the new requirements are available.
However, the licensee indicated they would like the staff to continue review of the proposed TSs (and relaxations) and agreed that a completion schedule in late 1988 was acceptable.
A working level review meeting was scheduled for the week of February 23, 1988.
Florida Power and Light will also provide a written response to the staff's concerns.
8802ih01 i3 880209 I
PDR ADOCK 05000250
- PDR,
T
, t/
jf l'
H tl
A meeting agenda and attendance list are enclosed.
Enclosures:
1.
Meeting Attendees 2.
Meeting Agenda Gordon E. Edison, Sr. Project Manager Project Directorate II-2 Division of lkeaci:oi f'rojccts-I/II cc w/enclosures:
See next page L
PM:PDII-2 D'
0 er GEdison:bg H e ow 2
/88 2/
/88 2/ P/88
r
)
0
Mr. C. 0.
Woody Florida Power and Light Company Turkey Point Plant CC:
Harold F. Reis, Esquire Newman and Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida
,32304 John T. Butler, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. J.
Odom, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 Mr. Sergio Periera County Manager of Metropolitan Dade County Miami, Florida 33130 Resi dent Inspector U.S.
Nuclear Regulatory Commission Turkey Point Nuclear Generating Station Post Office Box 57-1185 Miami, Florida 33257-1185 Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 Intergovernmental Coordination and Review Office of Planning 5 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Joette Lorion 7269 SW, 54 Avenue Miami, Flor ida 33143 Mr. Chris J. Baker, Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102
ENCLOSURE 1
NAME H. Berkow E. Butcher 6.
E.
Edison R.
Emch T. Grozan C.
Moon F. Southworth B.
P. Burdick P. L. Pace
- 0. 0.
Gvandage J.
K. Hays J. Arias, Jr.
W. A. Skelley J.
S.
Odom B.
A. Wilson D.
G. McDonald S.
A. Varaa TURKEY POINT TECH SPEC STATUS MEETING I/28/88 ATTENDEES ORGANIZATION NRC/NRR NRC/OTSR NRC/PD II-2 NRC/OTSB FP8L/Licensing NRC/OTSB FP8L/Turkey Point FP8L/Juno Beach Licensing FP8L/Licensing FP8L/Turkey Point FPimL/0:Licensing FP8L/Turkey Point FP8L/Juno Bea"h i.icensirc FPiIL/Site VP Turkey Point Reg. II, NRC Branch Chief NRC/NRR/PD1-3 NRR/D:DRPR
ENCLOSuR 2
MEETING AGENDA F
Turkey Point Technical Specifications Revision Project Status Januar 28 1988 9:00 A.M. - Noon P-422 Introduction - purpose of meeting; 1/15/88 letter from Varga to Woody; concerns about current situation.
(NRC)
Discussion of how "interim" tech specs are being implemented vis a vis license tech specs.
(FPL)
Discussion of problems being experienced by Turkey Point operators related to "interim" tech specs.
(FPL)
Current status of Tech Spec Revision Project.
(NRC/FPL)
Remaining milestones and estimated schedule for completion including resolution of relaxations.
(NRC)
Discussion of various options regarding:
(NRC/FPL) continued use of "interim" tech specs completion of Tech Spec Revision Project selected near-term individual tech spec change requests relationships to onging NRC Tech Spec Improvement Program
- Recap, Agreements, Actions (NRC/FPL)