ML17347B084

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Turkey Point Units 3 & 4 Emergency Power Sys Enhancement Rept,Suppl 1-Testing, Providing Addl Info Re Testing on Various Components & Sys During Turnover & Startup During Preoperational Testing
ML17347B084
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/03/1989
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17347B085 List:
References
L-89-124, TAC-69023, TAC-69024, NUDOCS 8904190032
Download: ML17347B084 (2)


Text

AC CELEBRATED 1TRIBU'n ON DEMONS TI ON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8904190032 DOC.DATE: 89/04/03 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "Emergency Power Sys Enhancement Rept,Suppl 1, Testing."

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR t ENCL / SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 EDISON,G 1 1 INTERNAL: AEOD 1 1 AEOD/DEIIB 1 1 DEDRO 1 1 NRR SHANKMANiS 1 1 NRR/DEST DIR 1 1 NRR/DLPQ/PEB 11 1 1 NRR/DLPQ/QAB 10 1 1 NRR/DOEA DIR 11 1 1 NRR/DREP/EPB 10 1 1 NRR/DREP/RPB 10 2 2 NRR/DRIS DIR 9A 1 1 NRR/PMAS/ILRB12 1 1 NUDOCS-ABSTRACT 1 1 0 IEBERMAN,J 1 1 OGC/HDS2 1 1 REG FILE 02 1 1 RGN2 FILE 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTE 'IO ALL "RIDS" RECIPZEPIS'IZASE HELP US IO REDUCE HASTE CCHIACZ ZHE DOQJKKZ CXR GBOL DESKS RDCN Pl-37 (EXT. 20079) KO ELIMLNATE KKR NAME PKH DI8I%UBVIlICS LISTS FOR DOCUMEMIS YOU DCRPT NEZDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL 23

P.O. Box 14000, Juno Beach, FL 33408.0420 At'R~L L-89-124 U. S. Nuclear Regulatory Commission Attn: Document Control- Desk Washington, D.C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Emergency Power System Enhancement Project NRC TAC Nos. 69023 and 69024 By letter L-88-269 dated June 23, 1988 Florida Power 6 Light Company (FPL) submitted the Emergency Power System Enhancement Report which provided the scope of the Enhancement Project and described the new electrical system configuration and the proposed.

implementation plan.

Attached is Supplement 1 to the Emergency Power System Enhancement Report. This supplement provides additional information regarding the testing to be performed on the various components and turnover and startup, during preoperational testing, and systems'uring prior to returning the emergency power system to service. A description of the qualification testing of the new emergency diesel generators was provided in FPL letter L-88-454 dated October 19, 1988.

Our current schedule for the remaining submittals is also attached.

If you have any questions contact us.

regarding this information, please Very truly yours, W. . Con y Senior Vi President Nuclear WFC/TCG/gp Attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 89042 90032 890403 PDR ADOCK 05000250 p PNU