L-88-269, Forwards Emergency Power Sys Enhancement Rept, Per 880527 Proposed Schedule.Rept Provides Preliminary Info Re Proposed Electrical Power Enhancements Which Will Be Installed at Facility
| ML17347A783 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 06/23/1988 |
| From: | Conway W FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML17347A784 | List: |
| References | |
| L-88-269, NUDOCS 8806280296 | |
| Download: ML17347A783 (3) | |
Text
.".C CELERATED ZTRIBUTJON DEMONS'1TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR g ENCLj TITLE: OR Submittal:
General Distribution ACCESSION NBR:8806280296 DOC.DATE: 88/06/23 NOTARIZED: NO DOCKET g
FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit. 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F-Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards "Emergency Power Sys Enhancement Rept," per 880527 R
schedule.
SIZE:
~+ +8 D
NOTES RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G COPIES LTTR ENCL 1
0 1
1 RECIPIENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL 5
5 8
INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DOEA/TSB 11 NU S-TRACT G FI E Ol EXTERNAL: LPDR NSIC 1
0 1
1 1
1 1
1 1
1 1
1 1
1 1
1 NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/PMAS/ILRB12 OGC 15-B-18 RES/DE/EIB NRC PDR 1
1 1
1 1
1 1
1 1
0 1
1 1
1 8j A
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL 19
P.
'BOX 14000, JUNO BEACH, FL 33408-0420
@Nl/y
+ed<~
JUNEi 2 3 1988 L-88-269 U.
S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket. Nos.
50-250 and 50-251 Emergency Power System (EPS)
Enhancement Pro'ect Letter L-88-221, dated May 27,
- 1988, provided Florida Power Light's (FPL) proposed schedule for the Emergency Power System (EPS) enhancement project.
Pursuant to that schedule FP&L is pleased to provide the enclosed EPS enhancement, report.
The report provides preliminary information about the proposed electrical power enhancements which FPL will install at the Turkey Point facility.
This document along with the Testing and Safety Evaluation documents will provide the information necessary to support issuance of the Safety Evaluation Report (SER) for this modification.
As discussed with Dr.
G. Edison, Project
- Manager, NRC, FPL will meet at your convenience to discuss the proposed enhancements.
Should you have any questions, please contact us.
Very truly yours, W.
Co Senior Vi e President Nuclear WFC/RG/cm attachment cc:
Dr.
J.
Nelson
- Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant (go(
8806280296 880623 PDR ADOCK 05000250 P