Requests Extension of Time Until 890206 to Provide Addl Info Re Emergency Power Sys Enhancement Project
ML17347A954
Person / Time
Site: Turkey Point  
Issue date: 02/03/1989
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-89-43, TAC-69023, TAC-69024, NUDOCS 8902130002
Download: ML17347A954 (4)


Text

AC(,'E

.,RA+ED DlS1B1'T1 O4 DEMONSTRA/3Y, SY) TEM REGULATORY XNFORMATXON DXSTRIBUTION SYSTEM (RXDS)

ACCESSION NBR:8902130002 DOC.DATE: 89/02/03 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET I 05000250 05000251 SUMECT: Requests extension of time to provide addi info re emergency power sys enhancement project.

DISTRIBDTION CODE:

AOOID COPIES RECEIVED:LTR g ENCL G SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DEST/SICB C

RACT REG I 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-2 PD NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/DOEA/TSB 11 OGC/HDS2 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL R

I NOTE 'LO ALL "RIDS" RECIPIENIS'LEASE HELP US XO mZuCZ mSTZ!

CONrACr mE DOCUMEN1'GNrROL DESK, RXN Pl-37 (EXT., 20079)

XO EIZKENATE KRJR NAME FKM DIPHGBVTIGN LISTS FOR DOCKS YOU DON'T NEZDf TOTAL NUMBER OF COPIES REQUIRED:

LTTR 19 ENCL

~

4

~,

P.O. Box14000, Juno Beach, FL 33408-0420 FEMUARY.

3 1989 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 L-89-43 Gentlemen:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Emergency Power System Enhancement Project NRC TAC Nos.

69023 and 69024 By letter dated January 6, 1989, the NRC requested that additional information concerning the Emergency Power System Enhancement Project be provided for review.

This letter also requested that the additional information be provided by February 6,

1989.

As discussed with Dr. G. E. Edison, Senior Project Manager for the Turkey Point

Plant, Florida Power 6 Light Company has begun assembling the requested information.

However, in order to conduct the necessary technical and management reviews of the information, FPL will require additional time to respond.

Our schedule for providing the requested information is as follows:

o All information requested in Enclosure 1 to your January 6,

1989 letter, except for Questions 32, 33, 34, 35, 37, 38, 39 and 47 will be provided by February 24, 1989.

o All information requested in Enclosure 2, plus Questions 32, 33, 34, 35, 37, 38, 39 and 47 from Enclosure 1 will be provided by March 20, 1989.

Should there be any questions on this information, please contact us Very truly yours, W. F.

Co y

Senior V

e President Nuclear WFC/TCG/gp cc:

Malcolm L. Ernst, Acting Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 3>02I30002 SP020 --

PUN AOUCN PDC an FPL Group company goo I